Oberon II Solar Project
27200 Rice Road, Desert Center, CA 92239Plant Summary Information
Oberon II Solar Project is ranked #42 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Oberon II Solar Project generated 217.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Oberon II Solar Project |
---|---|
Utility Name | IP Oberon II, LLC |
Location | Riverside County, CA |
Initial Operation Date | September 2023 |
Last Update | Aug 2024 |
Annual Generation | 549.7 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,185 out of 11,835 Power Plants Nationwide | |
Ranked #42 out of 5,643 Solar Power Plants Nationwide | |
Ranked #68 out of 1,569 California Power Plants | |
Ranked #17 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Oberon II Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oberon II Solar Project.
Monthly Net Generation for Oberon II Solar Project
Oberon II Solar Project Details
Summary Information | |
---|---|
Plant Name | Oberon II Solar Project (65735) |
Plant Address | 27200 Rice Road, Desert Center, CA 92239 |
Utility | IP Oberon II, LLC (64972) |
Latitude, Longitude | 33.72899, -115.38238 |
Generation Dates on File | Sep 2023 to Aug 2024 |
Initial Operation Date | September 2023 |
Annual Generation | 549.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 22-142-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 500.00 kV |
Energy Storage | Yes |
Generator OBIIP Details Operating October 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | REDBLUFF_2_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | REDBLUFF_2_B1 |
Nameplate Capacity | 250 MW |
Summer Capacity | 250 MW |
Winter Capacity | 250 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 339 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator OBIIB Details Operating September 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
RTO ISO LMP Node Designation | REDBLUFF_2_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | REDBLUFF_2_B1 |
Nameplate Capacity | 125 MW |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 500 |
---|---|
Maximum Charge Rate | 125 MW |
Maximum Discharge Rate | 125 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 127.5 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Co Located Renewable Firming | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65735 |
Direct Support Gen Id | OBIIP |
Support T D Asset | No |
Oberon II Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#32 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#33 | Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh |
#34 | Moapa Southern Paiute | Moapa, NV | 604.0 GWh |
#35 | Bighorn Solar 1 | Pueblo, CO | 600.1 GWh |
#36 | Titan Solar Project | Van Horn, TX | 597.8 GWh |
#37 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#38 | Athos Solar Project | Desert Center, CA | 593.4 GWh |
#39 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh |
#40 | Noble Solar | Krum, TX | 575.6 GWh |
#41 | AV Solar Ranch One | Lancaster, CA | 576.3 GWh |
#43 | Blythe Mesa Solar II | Blythe, CA | 541.3 GWh |
#44 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.3 GWh |
#45 | Oberon Solar Project | Desert Center, CA | 534.1 GWh |
#46 | Dodge Flat | Reno, NV | 540.8 GWh |
#47 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#48 | Five Wells Solar Center - Hybrid | Rogers, TX | 537.3 GWh |
#49 | Sun Valley Solar Project | Abbott, TX | 534.9 GWh |
#50 | ENGIE Long Draw Solar LLC | Gail, TX | 526.1 GWh |
#51 | Phoebe Solar | Kermit, TX | 518.7 GWh |
#52 | Techren Solar II LLC | Boulder, NV | 515.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oberon II Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 4.3 mi |
Athos Solar Project | Desert Center, CA | 593.4 GWh | 2.2 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 28.9 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 29.8 mi |
Desert Harvest II LLC | Desert Center, CA | 133.8 GWh | 4.9 mi |
Desert Harvest, LLC | Desert Center, CA | 185.8 GWh | 4.9 mi |
Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh | 5.3 mi |
Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh | 6.5 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 22.5 mi |
Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 38.3 GWh | 33.6 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 29 mi |
Maverick Solar 4, LLC | Desert Center, CA | 231.3 GWh | 2 mi |
Maverick Solar 6, LLC | Desert Center, CA | 268.2 GWh | 2 mi |
Maverick Solar 7, LLC | Desert Center, CA | 312.8 GWh | 2 mi |
Maverick Solar, LLC | Desert Center, CA | 375.5 GWh | 2 mi |
Oberon Solar Project | Desert Center, CA | 534.1 GWh | 0 mi |
SE Athos II, LLC | Desert Center, CA | 473.9 GWh | 2.2 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 29 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 4.3 mi |
Wister Solar | Niland, CA | 29.7 GWh | 32.5 mi |