NYU Luthern Medical Center
150 55th Street, New York City, NY 11220Plant Summary Information
NYU Luthern Medical Center is ranked #37 out of 74 distillate fuel oil power plants in New York in terms of total annual net electricity generation.
NYU Luthern Medical Center is comprised of 4 generators and generated 34.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | NYU Luthern Medical Center |
---|---|
Utility Name | NYU Langone Health |
Location | Kings County, NY |
Initial Operation Date | January 1994 |
Last Update | Dec 2022 |
Annual Generation | 109.5 MWh |
Annual Consumption | 998 MMBtu |
Ranked #10,885 out of 11,249 Power Plants Nationwide | |
Ranked #856 out of 1,267 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #716 out of 748 New York Power Plants | |
Ranked #37 out of 74 New York Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Previous Operator |
Lutheran Medical Center (2013 to 2015) NYU Langone Health (2016 to 2022) |
Map of NYU Luthern Medical Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NYU Luthern Medical Center.
Monthly Net Generation for NYU Luthern Medical Center
NYU Luthern Medical Center Details
Summary Information | |
---|---|
Plant Name | NYU Luthern Medical Center (54769) |
Plant Address | 150 55th Street New York City, NY 11220 |
Utility | NYU Langone Health (11329) |
Latitude, Longitude | 40.6467, -74.0211 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | January 1994 |
Annual Generation | 109.5 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 93-145-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial CHP (5) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | National Grid |
Natural Gas Storage | No |
Generator GEN1 Details Out of Service January 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | January 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN2 Details Out of Service January 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | January 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN3 Details Standby January 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | January 2006 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN4 Details Standby January 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | January 2006 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
NYU Luthern Medical Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#846 | Kindred School | Kindred, ND | 116.0 MWh |
#847 | Wilkins Station | Marblehead, MA | 115.9 MWh |
#848 | SJ/SC WPCP | San Jose, CA | 80.6 GWh |
#849 | Fermi | Frenchtown Twp, MI | 9.6 TWh |
#850 | St James | St James, MN | 113.9 MWh |
#851 | Hana Substation | Hana, HI | 113.6 MWh |
#852 | Paris (WI) | Union Grove, WI | 255.6 GWh |
#853 | West Point (PA) | West Point, PA | 319.1 GWh |
#854 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.0 GWh |
#855 | Savannah River Mill | Rincon, GA | 192.7 GWh |
#857 | Knoxville Industrial | Knoxville, IA | 109.2 MWh |
#858 | E C Gaston | Wilsonville, AL | 3.9 TWh |
#859 | French Island | La Cross, WI | 64.8 GWh |
#860 | Butler Municipal Power Plant | Butler, MO | 108.5 MWh |
#861 | Westside WWTP | Thomasville, NC | 107.7 MWh |
#862 | Graettinger | Graettinger, IA | 106.5 MWh |
#863 | Shelbina Power #2 | Shelbina, MO | 106.3 MWh |
#864 | Water Street Station | Bay City, MI | 1.3 GWh |
#865 | Mountain Home Energy Center | Mountain Home, TN | 5.7 GWh |
#866 | Cleveland Peaking | Cleveland, OH | 106.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NYU Luthern Medical Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayonne Energy Center | Bayonne, NJ | 745.1 GWh | 3.7 mi |
Brooklyn Hospital Center | Brooklyn, NY | 24.9 MWh | 3.8 mi |
Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.2 TWh | 4.3 mi |
Gowanus Gas Turbines Generating | Brooklyn, NY | 17.1 GWh | 1.4 mi |
Jersey City DWP | Jersey City, NJ | 1.4 GWh | 4.6 mi |
Joseph J Seymour Power Project | Brooklyn, NY | 119.6 GWh | 1.6 mi |
Kingsbrook Jewish Medical Center | Brooklyn, NY | 20.6 MWh | 4.7 mi |
Maimonides Medical Center | Brooklyn, NY | 34.8 MWh | 1.3 mi |
Narrows Gas Turbines Generating | Brooklyn, NY | 48.8 GWh | 0.1 mi |
NewYork-Presbyterian Brooklyn Methodist Hospital | Brooklyn, NY | 30.5 MWh | 2.7 mi |
NHH003 Clarkson Fuel Cell | Brooklyn, NY | 7.2 GWh | 4.2 mi |
NHH004 Winthrop Fuel Cell | Brooklyn, NY | 7.3 GWh | 4 mi |
NYC-HH - CONEY ISLAND HOSPITAL | Brooklyn, NY | 366.1 MWh | 5.1 mi |
NYP-Lower Manhattan Hospital | New York, NY | 20.7 MWh | 4.5 mi |
Port Richmond WWT Solar | Staten Island, NY | 1.6 GWh | 5.5 mi |
Pouch | Staten Island, NY | 64.7 GWh | 3.2 mi |
Royal Wine Corp Solar Power Plant | Bayonne, NJ | 1.4 GWh | 4.3 mi |
SDM000 Clarkson Fuel Cell | Brooklyn, NY | 13.3 GWh | 4.1 mi |
The Bank of New York | New York, NY | 51.3 MWh | 4.7 mi |
WEA Texas Bayonne | Bayonne, NJ | 2.3 GWh | 4.3 mi |