NYU LANGONE HEALTH
550 1st Avenue, New York, NY 10016Plant Summary Information
NYU LANGONE HEALTH is ranked #54 out of 116 natural gas power plants in New York in terms of total annual net electricity generation.
NYU LANGONE HEALTH is comprised of 13 generators and generated 10.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | NYU LANGONE HEALTH |
---|---|
Utility Name | NYU LANGONE HEALTH |
Location | New York County, NY |
Initial Operation Date | October 1992 |
Last Update | Dec 2023 |
Annual Generation | 42.9 GWh |
Annual Consumption | 961.2 k MMBtu |
Ranked #4,059 out of 11,835 Power Plants Nationwide | |
Ranked #1,146 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #142 out of 832 New York Power Plants | |
Ranked #54 out of 116 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.7% |
Map of NYU LANGONE HEALTH
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NYU LANGONE HEALTH.
Monthly Net Generation for NYU LANGONE HEALTH
NYU LANGONE HEALTH Details
Summary Information | |
---|---|
Plant Name | NYU LANGONE HEALTH (61488) |
Plant Address | 550 1st Avenue, New York, NY 10016 |
Utility | NYU LANGONE HEALTH (61094) |
Latitude, Longitude | 40.74678, -73.97223 |
Generation Dates on File | Jan 2017 to Dec 2023 |
Initial Operation Date | October 1992 |
Annual Generation | 42.9 GWh |
Fuel Types | Natural Gas : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial CHP (5) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
Natural Gas Storage | No |
Generator SKB1 Details Standby October 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | October 1992 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCC1 Details Standby January 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2006 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SMB1 Details Standby September 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | September 2006 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SMB2 Details Standby September 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | September 2006 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator ENB3 Details Standby January 2015
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2015 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SCI1 Details Standby January 2015
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2015 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SCI2 Details Standby January 2015
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2015 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator ENB1 Details Standby June 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 2016 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator ENB2 Details Standby June 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 2016 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GT Details Operating June 2016
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2016 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator KML1 Details Standby January 2018
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator KML2 Details Standby January 2018
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator KML3 Details Standby January 2018
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
NYU LANGONE HEALTH Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1136 | Osawatomie | Miami, KS | 44.0 GWh |
#1137 | Bristol Myers Squibb Lawrenceville | Lawrenceville, NJ | 43.9 GWh |
#1138 | Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh |
#1139 | Tres City Power LLC | Victoria, TX | 43.4 GWh |
#1140 | Hibbing | Hibbing, MN | 68.3 GWh |
#1141 | Fuel Cell 3245 Yates Avenue | Bronx, NY | 43.3 GWh |
#1142 | Lawrence County Station | Mitchell, IN | 43.2 GWh |
#1143 | NCSU CCUP Cogeneration Plant | Raleigh, NC | 43.7 GWh |
#1144 | Arizona State University CHP | Tempe, AZ | 43.1 GWh |
#1145 | Fernandina Plant | Fernandina Beach, FL | 192.3 GWh |
#1147 | Merck Rahway Power Plant | Rahway, NJ | 42.8 GWh |
#1148 | Orbit Bloom Fuel Cell | Medford, NY | 42.6 GWh |
#1149 | International Paper Riegelwood Mill | Riegelwood, NC | 334.9 GWh |
#1150 | Pinckneyville | Pinckneyville, IL | 42.4 GWh |
#1151 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 258.8 GWh |
#1152 | Pouch | Staten Island, NY | 42.1 GWh |
#1153 | Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh |
#1154 | Laredo | Laredo, TX | 42.1 GWh |
#1155 | Suwannee River | Live Oak, FL | 42.3 GWh |
#1156 | Lake Road (MO) | St Joseph, MO | 47.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NYU LANGONE HEALTH.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
5601 Westside CDG | North Bergen, NJ | 2.3 GWh | 4.3 mi |
59th Street | New York, NY | 612.0 MWh | 2 mi |
74th Street | New York, NY | 176.0 MWh | 1.8 mi |
Astoria Generating Station | Astoria, NY | 729.8 GWh | 4.2 mi |
Brooklyn Hospital Center | Brooklyn, NY | 27.0 MWh | 3.9 mi |
Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.1 TWh | 3.3 mi |
East River | New York, NY | 2.9 TWh | 1.3 mi |
Hilton NY Co Gen Plant | New York City, NY | 5.3 GWh | 1.1 mi |
Mount Sinai Beth Israel | New York, NY | 35.0 MWh | 1.1 mi |
Mount Sinai Hospital | New York, NY | 263.0 MWh | 3.1 mi |
New York University Central Plant | New York, NY | 74.2 GWh | 3.9 mi |
North 1st | Brooklyn, NY | 31.5 GWh | 2.1 mi |
NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 48.1 GWh | 1.5 mi |
NYC-HH-New Bellevue Hospital | New York, NY | 171.0 MWh | 0.5 mi |
NYP-Lower Manhattan Hospital | New York, NY | 19.0 MWh | 3 mi |
OBP Cogen | New York, NY | 25.4 GWh | 0.8 mi |
Peak Power 1 Cogen | New York, NY | 21.4 GWh | 1.1 mi |
Ravenswood | Long Island, NY | 2.9 TWh | 1.6 mi |
Vernon Boulevard | Long Island City, NY | 120.4 GWh | 1.2 mi |
Woodhull Hospital | Brooklyn, NY | 143.0 MWh | 3.3 mi |