NYP-Hudson Valley Hospital Center is ranked #53 out of 78 distillate fuel oil power plants in New York in terms of total annual net electricity generation.
NYP-Hudson Valley Hospital Center is comprised of 4 generators and generated 929.0 kWh during the 3-month period between September 2023 to December 2023.
Plant Name | NYP-Hudson Valley Hospital Center |
---|---|
Utility Name | NYP-Hudson Valley Hospital Center |
Location | Westchester County, NY |
Initial Operation Date | January 2010 |
Last Update | Dec 2023 |
Annual Generation | 26.0 MWh |
Annual Consumption | 580 MMBtu |
Ranked #11,676 out of 11,852 Power Plants Nationwide | |
Ranked #1,025 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #814 out of 832 New York Power Plants | |
Ranked #53 out of 78 New York Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of NYP-Hudson Valley Hospital Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NYP-Hudson Valley Hospital Center.
Monthly Net Generation for NYP-Hudson Valley Hospital Center
NYP-Hudson Valley Hospital Center Details
Summary Information | |
---|---|
Plant Name | NYP-Hudson Valley Hospital Center (62421) |
Plant Address | 1980 Crompond Road, Cortlandt Manor, NY 10567 |
Utility | NYP-Hudson Valley Hospital Center (61947) |
Latitude, Longitude | 41.28674, -73.8888 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | January 2010 |
Annual Generation | 26.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator 750RX Details Standby January 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2010 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 600CP Details Standby January 2012
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2012 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 600OE Details Standby January 2012
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2012 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator TER Details Standby January 2018
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
NYP-Hudson Valley Hospital Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1015 | Anderson Erickson | Des Moines, IA | 27.0 MWh |
#1016 | Valley Queen Cheese | Milbank, SD | 27.0 MWh |
#1017 | Brooklyn Hospital Center | Brooklyn, NY | 27.0 MWh |
#1018 | Princeton University Cogeneration | Princeton, NJ | 53.2 GWh |
#1019 | Hendricks Regional Health | Danville, IN | 26.0 MWh |
#1020 | Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh |
#1021 | Trinidad (CO) | Trinidad, CO | 26.0 MWh |
#1022 | Plant Four | Marquette, MI | 26.0 MWh |
#1023 | Thorne Bay Plant | Craig, AK | 26.0 MWh |
#1024 | Madison Utilities | Madison, NE | 26.0 MWh |
#1026 | Greenville Electric Generating Station | Greenville, OH | 68.5 GWh |
#1027 | Clay Center | Clay Center, KS | 193.0 MWh |
#1028 | Indeck Oswego Energy Center | Oswego, NY | 36.3 GWh |
#1029 | Mount Sinai South Nassau Hospital | Oceanside, NY | 24.5 MWh |
#1030 | Ward WTP | High Point, NC | 24.0 MWh |
#1031 | Salem Electric Department | Salem, VA | 24.0 MWh |
#1032 | La Crosse | La Crosse, KS | 24.0 MWh |
#1033 | Coachella | Coachella, CA | 754.0 MWh |
#1034 | Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.1 TWh |
#1035 | Scribner Diesel Generation Facility | Scribner, NE | 34.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NYP-Hudson Valley Hospital Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
100 Brook Hill Drive Solar | West Nyack, NY | 2.1 GWh | 14.2 mi |
Bowline Point | West Haverstraw, NY | 1.1 TWh | 7 mi |
CBP Solar | Buchanan, NY | 2.3 GWh | 3.3 mi |
Clarkstown Landfill Solar Facility | West Nyack, NY | 2.7 GWh | 13.3 mi |
Croton Solar | Cortlandt, NY | 5.1 GWh | 1.2 mi |
EDF - Liberty NY - Real Term CSG | Elmsford, NY | 526.0 MWh | 15.6 mi |
Equinix - Elmsford | Elmsford, NY | 11.7 GWh | 15.3 mi |
Grand Prix Solar | Mt. Kisco, NY | 608.0 MWh | 10.1 mi |
JLL-One Rockwood Road | Sleppy Hollow, NY | 8.0 MWh | 12.4 mi |
Lederle Laboratories | Pearl River, NY | 148.3 GWh | 16 mi |
Mount Kisco Landfill Solar & Storage CSG | Mount Kisco, NY | 768.0 MWh | 10.1 mi |
Mt Pleasant Community Center | Valhalla, NY | 710.0 MWh | 14.3 mi |
NY - Mines Press | Cortlandt, NY | 1.3 GWh | 1.3 mi |
Regeneron Pharmaceuticals Inc. | Tarrytown, NY | 45.0 MWh | 14.8 mi |
Regeneron Tarrytown | Tarrytown, NY | 11.0 GWh | 14.9 mi |
Riley Road LLC | New Windsor, NY | 6.4 GWh | 16 mi |
Rockland Bakery Inc. | Nanuet, NY | 19.0 MWh | 11.3 mi |
Sunlight Beacon | Beacon, NY | 3.2 GWh | 15.1 mi |
Westchester County Medical Center | Valhalla, NY | 102.0 MWh | 14.3 mi |
Wheelabrator Westchester | Peekskill, NY | 400.1 GWh | 2.9 mi |