NY - Presbyt. Hospital - 525 E 68TH St
525 East 68th St, New York, NY 10021Plant Summary Information
NY - Presbyt. Hospital - 525 E 68TH St is ranked #52 out of 110 natural gas power plants in New York in terms of total annual net electricity generation.
NY - Presbyt. Hospital - 525 E 68TH St is comprised of 10 generators and generated 18.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | NY - Presbyt. Hospital - 525 E 68TH St |
---|---|
Utility Name | NY - PRESBYTERIAN HOSPITAL-525 E 68TH ST |
Location | New York County, NY |
Initial Operation Date | April 1997 |
Last Update | Dec 2022 |
Annual Generation | 66.0 GWh |
Annual Consumption | 724.6 k MMBtu |
Ranked #3,516 out of 11,249 Power Plants Nationwide | |
Ranked #1,021 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #114 out of 748 New York Power Plants | |
Ranked #52 out of 110 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of NY - Presbyt. Hospital - 525 E 68TH St
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NY - Presbyt. Hospital - 525 E 68TH St.
Monthly Net Generation for NY - Presbyt. Hospital - 525 E 68TH St
NY - Presbyt. Hospital - 525 E 68TH St Details
Summary Information | |
---|---|
Plant Name | NY - Presbyt. Hospital - 525 E 68TH St (61238) |
Plant Address | 525 East 68th St New York, NY 10021 |
Utility | NY - PRESBYTERIAN HOSPITAL-525 E 68TH ST (60883) |
Latitude, Longitude | 40.7644, -73.95393 |
Generation Dates on File | Jan 2017 to Dec 2022 |
Initial Operation Date | April 1997 |
Annual Generation | 66.0 GWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial CHP (5) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
Grid Voltage | 4.16 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
Natural Gas Storage | No |
Generator GRB1 Details Standby April 1997
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | April 1997 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GRB2 Details Standby April 1997
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | April 1997 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GRB3 Details Standby April 1997
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | April 1997 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GRB4 Details Standby December 2008
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | December 2008 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator CGTB Details Operating May 2009
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 7.7 MW |
Winter Capacity | 7.7 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2009 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator ANX1 Details Standby May 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | May 2016 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator ANX2 Details Standby May 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | May 2016 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator DHK1 Details Standby November 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | November 2017 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator DHK2 Details Standby November 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | November 2017 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator DHK3 Details Standby November 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | November 2017 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
NY - Presbyt. Hospital - 525 E 68TH St Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1011 | Jamaica Bay Peaking | Far Rockaway, NY | 70.5 GWh |
#1012 | Nippon Dynawave Packaging Longview WA | Longview, WA | 310.7 GWh |
#1013 | Taft 26C Cogen | Taft, CA | 68.3 GWh |
#1014 | International Paper - Orange | Orange, TX | 298.1 GWh |
#1015 | Clearwater Paper IPP Lewiston | Lewiston, ID | 415.4 GWh |
#1016 | Fountain Valley Power Facility | Fountain, CO | 67.7 GWh |
#1017 | Gillette SBMC | Boston, MA | 67.2 GWh |
#1018 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 197.2 GWh |
#1019 | Certain Solar - Staten Island | Staten Island, NY | 66.4 GWh |
#1020 | WestRock (TX) | Evadale, TX | 395.9 GWh |
#1022 | The Andersons Albion Ethanol LLC | Albion, MI | 65.4 GWh |
#1023 | Pouch | Staten Island, NY | 64.7 GWh |
#1024 | Silas Ray | Brownsville, TX | 64.7 GWh |
#1025 | Sowega Power | Baconton, GA | 64.6 GWh |
#1026 | Lon Wright | Fremont, NE | 491.8 GWh |
#1027 | Beaver Dam | Canton Township, PA | 64.3 GWh |
#1028 | Elm Road Generating Station | Oak Creek, WI | 7.1 TWh |
#1029 | Spruance Operating Services LLC | Richmond, VA | 63.6 GWh |
#1030 | Western Michigan University Power Plant | Kalamazoo, MI | 63.1 GWh |
#1031 | River Valley | Panama, OK | 632.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NY - Presbyt. Hospital - 525 E 68TH St.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
500MW CC | Astoria, NY | 3.8 TWh | 3 mi |
59th Street | New York, NY | 309.8 MWh | 2 mi |
74th Street | New York, NY | 308.7 MWh | 0.3 mi |
Astoria Energy | New York, NY | 4.6 TWh | 3.3 mi |
Astoria Energy II | Astoria, NY | 4.3 TWh | 3.2 mi |
Astoria Gas Turbines | Astoria, NY | 51.2 GWh | 3 mi |
Astoria Generating Station | Astoria, NY | 828.8 GWh | 2.7 mi |
East River | New York, NY | 3.3 TWh | 2.7 mi |
Harlem River Yard | Bronx, NY | 121.1 GWh | 3.1 mi |
Hilton NY Co Gen Plant | New York City, NY | 5.3 GWh | 1.3 mi |
Mount Sinai Beth Israel | New York, NY | 65.5 MWh | 2.6 mi |
Mount Sinai Hospital | New York, NY | 302.3 MWh | 1.8 mi |
New York University Central Plant | New York, NY | 81.1 GWh | 2.4 mi |
North 1st | Brooklyn, NY | 73.4 GWh | 3.3 mi |
NYC-HH-New Bellevue Hospital | New York, NY | 129.7 MWh | 2.1 mi |
NYU LANGONE HEALTH | New York, NY | 56.1 GWh | 1.5 mi |
OBP Cogen | New York, NY | 30.7 GWh | 1.7 mi |
Peak Power 1 Cogen | New York, NY | 19.5 GWh | 2.2 mi |
Ravenswood | Long Island, NY | 2.9 TWh | 0.5 mi |
Vernon Boulevard | Long Island City, NY | 129.9 GWh | 0.8 mi |