NWP Indian Mesa Wind Farm
Bar M Ranch, Iraan, TX 79744Plant Summary Information
NWP Indian Mesa Wind Farm is ranked #182 out of 218 wind farms in Texas in terms of total annual net electricity generation.
NWP Indian Mesa Wind Farm generated 50.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | NWP Indian Mesa Wind Farm |
---|---|
Utility Name | NWP Indian Mesa Wind Farm LP |
Location | Pecos County, TX |
Initial Operation Date | May 2001 |
Last Update | Dec 2023 |
Annual Generation | 197.8 GWh |
Annual Consumption | 730.0 k MMBtu |
Ranked #2,312 out of 11,835 Power Plants Nationwide | |
Ranked #705 out of 1,343 Wind Power Plants Nationwide | |
Ranked #395 out of 749 Texas Power Plants | |
Ranked #182 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of NWP Indian Mesa Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NWP Indian Mesa Wind Farm.
Monthly Net Generation for NWP Indian Mesa Wind Farm
NWP Indian Mesa Wind Farm Details
Summary Information | |
---|---|
Plant Name | NWP Indian Mesa Wind Farm (55747) |
Plant Address | Bar M Ranch, Iraan, TX 79744 |
Utility | NWP Indian Mesa Wind Farm LP (13866) |
Latitude, Longitude | 30.93147, -102.20143 |
Generation Dates on File | Dec 2001 to Dec 2023 |
Initial Operation Date | May 2001 |
Annual Generation | 197.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-166-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator NWP2 Details Operating May 2001
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 82.5 MW |
Summer Capacity | 82.5 MW |
Winter Capacity | 82.5 MW |
Minimum Load | 4.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 125 |
Turbine Details | |
Number Of Turbines | 125 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V47-660 |
Design Wind Speed | 22.4 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 164 |
NWP Indian Mesa Wind Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Florida Power & Light Co | P O Box 29100, Miami, FL 33102 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#695 | Scurry County Wind II | Snyder, TX | 201.1 GWh |
#696 | Red Mesa Wind LLC | Seboyeta, NM | 201.1 GWh |
#697 | Windthorst-2 | Archer, TX | 201.0 GWh |
#698 | Flat Water Wind Farm LLC | Du Bois, NE | 200.7 GWh |
#699 | Milo Wind Project LLC | Portales, NM | 200.6 GWh |
#700 | Osceola Windpower II | Harris, IA | 198.9 GWh |
#701 | Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh |
#702 | Corriedale Wind Energy | Cheyenne, WY | 198.3 GWh |
#703 | Spearville 3 LLC | Spearville, KS | 198.2 GWh |
#704 | Hog Creek Wind Project | Ada, OH | 198.1 GWh |
#706 | Ball Hill Wind Energy, LLC | Forestville, NY | 197.7 GWh |
#707 | Montezuma Wind II | Birds Landing, CA | 196.6 GWh |
#708 | Cotton Plains Wind Farm | Floydada, TX | 196.6 GWh |
#709 | Cedar Creek Wind, LLC | Shelley, ID | 194.9 GWh |
#710 | Weaver Wind | Township 16, ME | 194.9 GWh |
#711 | Nine Canyon | Kennewick, WA | 194.7 GWh |
#712 | Star Point Wind Project LLC | Wasco, OR | 194.0 GWh |
#713 | Jericho Rise Wind Farm LLC | Chateaugay, NY | 193.4 GWh |
#714 | Golden Spread Panhandle Wnd Rch | Wilderado, TX | 192.5 GWh |
#715 | Windstar 1 | Tehachapi, CA | 192.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NWP Indian Mesa Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.9 GWh | 5.9 mi |
Appaloosa Run Wind | Rankin, TX | 708.3 GWh | 26.9 mi |
Buckthorn Westex | Ft. Stockton, TX | 377.4 GWh | 32.2 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 22.7 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 23.2 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 6.9 mi |
East Pecos Solar | McCamey, TX | 259.2 GWh | 6.8 mi |
Emerald Grove | Crane, TX | 281.6 GWh | 14.6 mi |
Greasewood Solar | Fort Stockton, TX | 165.2 GWh | 18.3 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh | 25.2 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh | 19.3 mi |
Midway Solar - TX | Fort Stockton, TX | 302.3 GWh | 4.6 mi |
Pearl Solar | Fort Stockton, TX | 99.6 GWh | 5.6 mi |
RE Maplewood | McCamey, TX | 491.6 GWh | 4.6 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 990.1 GWh | 19.9 mi |
Shamrock Wind | TBD, TX | 603.2 GWh | 35.2 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 21.1 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 22.1 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 12.7 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 12.7 mi |