NVSS-II
2371 East Simkins Rd, Pahrump, NV 89060Plant Summary Information
NVSS-II is ranked #37 out of 54 solar farms in Nevada in terms of total annual net electricity generation.
NVSS-II generated 8.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | NVSS-II |
---|---|
Utility Name | NVSS-II |
Location | Nye County, NV |
Initial Operation Date | February 2017 |
Last Update | Dec 2022 |
Annual Generation | 34.2 GWh |
Annual Consumption | 124.8 k MMBtu |
Ranked #4,271 out of 11,249 Power Plants Nationwide | |
Ranked #847 out of 5,158 Solar Power Plants Nationwide | |
Ranked #80 out of 104 Nevada Power Plants | |
Ranked #37 out of 54 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Radian Generation (2018 to 2018) NVSS-II (2019 to 2022) |
Map of NVSS-II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NVSS-II.
Monthly Net Generation for NVSS-II
NVSS-II Details
Summary Information | |
---|---|
Plant Name | NVSS-II (62636) |
Plant Address | 2371 East Simkins Rd Pahrump, NV 89060 |
Utility | NVSS-II (63423) |
Latitude, Longitude | 36.27505, -115.97233 |
Generation Dates on File | Jan 2019 to Dec 2022 |
Initial Operation Date | February 2017 |
Annual Generation | 34.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF16-1148-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Valley Electric Assn, Inc (19840) NV |
Grid Voltage | 24.90 kV |
Energy Storage | No |
Generator NVSS2 Details Operating February 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 14.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 17.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
NVSS-II Plant Owners
Owner Name | Address | Ownership |
---|---|---|
ORIX Corporation | 280 Park Avenue, New York, NY 10017 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#837 | Blackville Solar II | Blackville, SC | 35.9 GWh |
#838 | Morelos del Sol | Lost Hills, CA | 35.7 GWh |
#839 | Paloma Solar Hybrid | Gila Bend, AZ | 35.5 GWh |
#840 | Saddle Mountain Solar I | Tonopah, AZ | 35.3 GWh |
#841 | Ocotillo Wells | Borrego Springs, CA | 35.2 GWh |
#842 | Watson Seed Farm PV1 | Whitakers, NC | 35.1 GWh |
#843 | Maryland Solar | Hagerstown, MD | 35.1 GWh |
#844 | Hobnail Solar | Hephzibah, GA | 34.7 GWh |
#845 | Woodmere Solar Farm | Edison, CA | 34.4 GWh |
#846 | Dogwood Solar, LLC | Scotland Neck, NC | 34.2 GWh |
#848 | Luke Solar | Glendale, AZ | 34.2 GWh |
#849 | Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 34.1 GWh |
#850 | Correctional Solar LLC | Barhamsville, VA | 34.1 GWh |
#851 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 34.0 GWh |
#852 | White Tail | TBD, FL | 33.8 GWh |
#853 | Cumblerland Land Holdings, LLC | Elkmont, AL | 33.8 GWh |
#854 | Holstein Plant | Maxton, NC | 33.7 GWh |
#855 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 33.6 GWh |
#856 | SR DeSoto II | DeSoto, GA | 33.5 GWh |
#857 | SR Jenkins Ft Lupton | Ft. Lupton, CO | 33.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NVSS-II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Solar PV Power Project | North Las Vegas, NV | 53.9 GWh | 56.4 mi |
CityCenter Central Plant Cogen Units | Las Vegas, NV | 69.8 GWh | 45.8 mi |
Clark (NVE) | Las Vegas, NV | 643.7 GWh | 53 mi |
Dignity - San Martin | Las Vegas, NV | 3.9 GWh | 41.9 mi |
Dignity - Siena Campus | Henderson, NV | 3.0 GWh | 51.3 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 29.3 GWh | 44.9 mi |
IKEA Las Vegas 462 | Las Vegas, NV | 1.5 GWh | 41.1 mi |
Ivanpah 3 | Nipton, CA | 192.5 GWh | 55.2 mi |
Las Vegas Generating Station | North Las Vegas, NV | 406.6 GWh | 47.5 mi |
Las Vegas WPCF Solar Plant | Las Vegas, NV | 6.9 GWh | 53.1 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 20.8 GWh | 51.1 mi |
Nellis Solar PV II | North Las Vegas, NV | 40.1 GWh | 51.7 mi |
Saguaro Power | Henderson, NV | 209.1 GWh | 56 mi |
Silver State Solar Power North | Primm, NV | 122.1 GWh | 48.1 mi |
Solar Las Vegas MB 2, LLC | Las Vegas, NV | 2.9 GWh | 46.3 mi |
Solar Las Vegas MB-1 | Las Vegas, NV | 10.6 GWh | 46.1 mi |
Stateline Solar | Nipton, CA | 649.1 GWh | 56.6 mi |
Sun Peak Generating Station | Las Vegas, NV | 40.2 GWh | 53.2 mi |
Sunshine Valley Solar | Armagosa, NV | 239.7 GWh | 33.7 mi |
Yellow Pine Solar | Enterprise, NV | 242.3 GWh | 18.1 mi |