North Bend Wind Project, LLC
TBD, Highmore, SD 57345Plant Summary Information
North Bend Wind Project, LLC is ranked #13 out of 50 power plants in South Dakota in terms of total annual net electricity generation.
North Bend Wind Project, LLC generated 195.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | North Bend Wind Project, LLC |
---|---|
Utility Name | North Bend Wind Project, LLC |
Location | Hyde County, SD |
Initial Operation Date | December 2023 |
Last Update | Aug 2024 |
Annual Generation | 599.5 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,090 out of 11,835 Power Plants Nationwide | |
Ranked #248 out of 1,343 Wind Power Plants Nationwide | |
Ranked #13 out of 50 South Dakota Power Plants | |
Ranked #8 out of 25 South Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of North Bend Wind Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Bend Wind Project, LLC.
Monthly Net Generation for North Bend Wind Project, LLC
North Bend Wind Project, LLC Details
Summary Information | |
---|---|
Plant Name | North Bend Wind Project, LLC (67002) |
Plant Address | TBD, Highmore, SD 57345 |
Utility | North Bend Wind Project, LLC (65929) |
Latitude, Longitude | 44.37733, -99.6601 |
Generation Dates on File | Dec 2023 to Aug 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 599.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 8400041 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | WAPA-- Western Area Power Administration (27000) SD |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator NBEND Details Operating December 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 80 |
Turbine Details | |
Number Of Turbines | 80 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
North Bend Wind Project, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#238 | Brady Wind Energy Center | Dickinson, ND | 615.5 GWh |
#239 | Raymond Wind Farm, LLC | Lyford, TX | 615.2 GWh |
#240 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#241 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 610.5 GWh |
#242 | Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh |
#243 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#244 | South Plains Wind Phase I | Floydada, TX | 607.1 GWh |
#245 | Heart of Texas Wind Project | Brady, TX | 606.0 GWh |
#246 | Shamrock Wind | TBD, TX | 603.2 GWh |
#247 | NaturEner Rim Rock Energy | Kevin, MT | 601.5 GWh |
#249 | Maple Ridge Wind Farm | Lowville, NY | 599.2 GWh |
#250 | Limestone Wind Project | Coolidge, TX | 596.8 GWh |
#251 | Cedar Springs II | Douglas, WY | 596.2 GWh |
#252 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#254 | Astra Wind Farm | Happy, TX | 593.6 GWh |
#255 | Wild Horse | Ellensburg, WA | 592.7 GWh |
#256 | Castle Gap Wind | Goldthwaite, TX | 591.0 GWh |
#257 | Cedar Creek II | New Raymer, CO | 589.5 GWh |
#258 | Jumbo Hill Wind Project | Andrews, TX | 588.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding North Bend Wind Project, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aberdeen CT | Aberdeen, SD | 44.3 GWh | 92.4 mi |
Aurora County Wind | White Lake, SD | 70.8 GWh | 63 mi |
Big Bend Dam | Chamberlain, SD | 770.5 GWh | 25.7 mi |
Bob Glanzer Generating Station | Huron, SD | 96.4 GWh | 73.5 mi |
Brule County Wind | Kimball, SD | 64.6 GWh | 58.5 mi |
Campbell County Wind Farm | Pollock, SD | 318.8 GWh | 99.7 mi |
Chamberlain Wind Project | Chamberlain, SD | 98.0 MWh | 41.9 mi |
Crocker Wind Farm | Conde, SD | 788.7 GWh | 101.4 mi |
Ft. Pierre | Fort Pierre, SD | 52.9 MWh | 35.6 mi |
Groton Generation Station | Groton, SD | 201.9 GWh | 102.9 mi |
Oahe | Pierre, SD | 2.1 TWh | 36.2 mi |
Oak Tree Energy | Clark, SD | 66.7 GWh | 101.8 mi |
Pierre Solar | Pierre, SD | 17.0 MWh | 32 mi |
POET Bioprocessing- Mitchell | Mitchell, SD | 17.6 GWh | 86.9 mi |
Prairie Winds SD1 | Crow Lake, SD | 343.7 GWh | 55 mi |
Rolling Thunder Wind Farm Hybrid | Miller, SD | 79.7 GWh | 26.9 mi |
South Dakota Wind Energy Cente | Highmore, SD | 78.5 GWh | 14.3 mi |
Sweetland Wind Farm, LLC | St. Lawrence, SD | 713.3 GWh | 42.4 mi |
Triple H Wind Project | Highmore, SD | 953.4 GWh | 3.2 mi |
Wessington Springs | Wessington Springs, SD | 221.8 GWh | 59 mi |