North Allegheny Windpower Project

St. Hwy 53 & US Hwy 22, Lilly, PA 15938

Plant Summary Information

North Allegheny Windpower Project is ranked #22 out of 27 wind farms in Pennsylvania in terms of total annual net electricity generation.

North Allegheny Windpower Project generated 27.8 GWh during the 3-month period between May 2024 to August 2024.

Plant NameNorth Allegheny Windpower Project
Utility NameDuke Energy Renewables Services
LocationBlair County, PA
Initial Operation DateSeptember 2009
Last Update Aug 2024
Annual Generation 46.4 GWh
Annual Consumption 162.7 k MMBtu
Ranked #3,955 out of 11,835 Power Plants Nationwide
Ranked #980 out of 1,343 Wind Power Plants Nationwide
Ranked #109 out of 231 Pennsylvania Power Plants
Ranked #22 out of 27 Pennsylvania Wind Power Plants
Fuel Types Wind
Previous Operator Duke Energy DEGS North Allegheny (2013 to 2021)
Duke Energy Renewables Services (2022 to 2023)

Map of North Allegheny Windpower Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Allegheny Windpower Project.

Create Your Account Today

Monthly Net Generation for North Allegheny Windpower Project

North Allegheny Windpower Project Details

Summary Information
Plant NameNorth Allegheny Windpower Project (56651)
Plant AddressSt. Hwy 53 & US Hwy 22, Lilly, PA 15938
UtilityDuke Energy Renewables Services (65411)
Latitude, Longitude40.4381, -78.5436
Generation Dates on FileSep 2009 to Aug 2024
Initial Operation DateSeptember 2009
Annual Generation 46.4 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC (PJM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPennsylvania Electric Co (14711) PA
Grid Voltage 230.00 kV
Energy StorageNo

Generator 1 Details Operating September 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipWholly Owned by Other Entity
Nameplate Capacity75 MW
Summer Capacity75 MW
Winter Capacity75 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Turbines/Hydrokinetic Buoys35
Planned New Prime MoverWT
Planned Energy SourceWND
Planned New Nameplate Capacity70 MW
Planned RepowerApril 2024
Multiple FuelsNo
Turbine Details
Number Of Turbines35
Predominant Turbine ManufacturerGamesa
Predominant Turbine Model NumberG87-2.0
Design Wind Speed14.9 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

North Allegheny Windpower Project Plant Owners

Owner NameAddressOwnership
Duke Energy DEGS North Allegheny550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#970Canton Mountain WindCanton, ME50.1 GWh
#971Burley Butte WindparkBurley, ID49.5 GWh
#972Danielson Wind Farms LLCCosmos, MN49.4 GWh
#973Kaheawa Wind Power II LLCWailuku, HI49.0 GWh
#974McKinley Wind ParkPigeon, MI49.0 GWh
#975Power County Wind Park NorthAmerican Falls, ID48.1 GWh
#976Rising Tree Wind Farm IIMojave, CA47.7 GWh
#977Taconite Ridge 1 Wind Energy CenterMountain Iron, MN47.4 GWh
#978Coastal Virginia Offshore Wind (CVOW) Pilot ProjectVirginia Beach, VA46.7 GWh
#979Milner Dam Wind Park LLCBurley, ID46.6 GWh
#981Fire Island WindAnchorage, AK46.3 GWh
#982Stetson Wind IIDanforth, ME45.7 GWh
#983Oasis AltaMojave, CA45.4 GWh
#984Flat Ridge Wind FarmNashville, KS45.1 GWh
#985Community Wind SouthRushmore, MN44.4 GWh
#986Forward Windpower LLCBerlin, PA44.3 GWh
#987Spanish Fork Wind Park 2 LLCSpanish Fork, UT42.1 GWh
#988Tehachapi Wind Resource IITehachapi, CA42.1 GWh
#989Bennett Creek Windfarm LLC - Mountain HomeMountain Home, ID41.5 GWh
#990Power County Wind Park SouthAmerican Falls, ID41.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding North Allegheny Windpower Project.

Plant NamePlant LocationAnnual GenerationDistance
Allegheny Ridge Wind FarmPortage, PA167.6 GWh4.2 mi
Cambria Wind LLCSidman, PA121.6 GWh12.1 mi
Chestnut Flats Wind FarmAltoona, PA92.8 GWh6.8 mi
Colver Green EnergyColver, PA702.3 GWh15.5 mi
ConemaughNew Florence, PA2.9 TWh27.5 mi
CPV Fairview Energy CenterJohnstown, PA7.0 TWh16.5 mi
CPV Maple Hill SolarPortage, PA134.8 GWh8.1 mi
Ebensburg PowerEbensburg, PA285.1 GWh10.8 mi
Forward Windpower LLCBerlin, PA44.3 GWh29.6 mi
Glades Pike Generation PlantSomerset, PA11.1 GWh39.7 mi
Highland North Wind FarmSidman, PA167.3 GWh10.9 mi
Indiana University of PennsylvaniaIndiana, PA18.3 GWh34.6 mi
Patton Wind FarmPatton, PA81.2 GWh15.5 mi
Sandy Ridge Wind 2, LLCTyrone, PA206.4 GWh27.1 mi
Sandy Ridge Wind FarmTyrone, PA114.5 GWh24.2 mi
Seward (PA)New Florence, PA2.6 TWh25.9 mi
Somerset Windpower LLCOhiopyle, PA5.0 GWh40.2 mi
Stony Creek Wind Farm LLCBerlin, PA128.0 GWh31.6 mi
Warrior Ridge HydroPetersburg, PA190.3 MWh27.7 mi
William F Matson Generating StationHuntingdon, PA79.9 GWh28.4 mi