North 301 Solar
15921 Highway 301, Enfield, NC 27823Plant Summary Information
North 301 Solar is ranked #72 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
North 301 Solar generated 8.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | North 301 Solar |
---|---|
Utility Name | North 301 Solar, LLC |
Location | Halifax County, NC |
Initial Operation Date | December 2019 |
Last Update | Aug 2024 |
Annual Generation | 30.0 GWh |
Annual Consumption | 114.8 k MMBtu |
Ranked #4,548 out of 11,835 Power Plants Nationwide | |
Ranked #995 out of 5,643 Solar Power Plants Nationwide | |
Ranked #130 out of 862 North Carolina Power Plants | |
Ranked #72 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
North 301 Solar (2017 to 2020) North 301 Solar, LLC (2021 to 2023) |
Map of North 301 Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North 301 Solar.
Monthly Net Generation for North 301 Solar
North 301 Solar Details
Summary Information | |
---|---|
Plant Name | North 301 Solar (61778) |
Plant Address | 15921 Highway 301, Enfield, NC 27823 |
Utility | North 301 Solar, LLC (61401) |
Latitude, Longitude | 36.213, -77.624 |
Generation Dates on File | Dec 2019 to Aug 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 30.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-528-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) NC |
Grid Voltage | 24.90 kV |
Energy Storage | No |
Generator N301 Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 26.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
North 301 Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#985 | Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh |
#986 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh |
#987 | Maryland Solar | Hagerstown, MD | 30.6 GWh |
#988 | Caden Energix Pamplin LLC | Appomattox, VA | 30.6 GWh |
#989 | Riverhead Solar Farm | Calverton, NY | 30.4 GWh |
#990 | Apple Data Center PV3 | Conover, NC | 30.3 GWh |
#991 | Hyder II Hybrid | Hyder, AZ | 30.3 GWh |
#992 | Correctional Solar LLC | Barhamsville, VA | 30.1 GWh |
#993 | Woodland Solar Farm | Smithfield, VA | 30.0 GWh |
#994 | Desert Star Hybrid | Buckeye, AZ | 30.0 GWh |
#996 | Tropico Solar PV Plant | Delano, CA | 30.0 GWh |
#997 | RE Adams East, LLC | Fresno, CA | 29.9 GWh |
#998 | Hollyfield | Manquin, VA | 29.8 GWh |
#999 | Wister Solar | Niland, CA | 29.7 GWh |
#1000 | Lanikuhana Solar LLC | Mililani, HI | 29.6 GWh |
#1001 | Morelos del Sol | Lost Hills, CA | 29.5 GWh |
#1002 | Baker City Solar | Baker City, OR | 29.5 GWh |
#1003 | Blackville Solar II | Blackville, SC | 29.4 GWh |
#1004 | Elizabeth Solar Plant | Pitkin, LA | 29.4 GWh |
#1005 | Rincon Solar I | Rincon, GA | 29.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding North 301 Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
American Legion PV 1 | Roanoke Rapids, NC | 24.5 GWh | 14.3 mi |
Battleboro Farm | South Whitakers, NC | 7.5 GWh | 13.1 mi |
Carl Friedrich Gauss Solar | Halifax, NC | 7.5 GWh | 9.2 mi |
Castalia Solar | Castalia, NC | 3.7 GWh | 12.1 mi |
Chestnut Solar | Enfield, NC | 150.1 GWh | 5.4 mi |
Cork Oak Solar | Halifax, NC | 40.6 GWh | 11.3 mi |
Dogwood Solar, LLC | Scotland Neck, NC | 28.5 GWh | 13.4 mi |
Fern Solar LLC | Battleboro, NC | 177.6 GWh | 15 mi |
Grissom Solar, LLC | Enfield, NC | 10.6 GWh | 15.4 mi |
HXNAir Solar One | Halifax, NC | 9.1 GWh | 9.4 mi |
Leggett Solar, LLC | Leggett, NC | 6.2 GWh | 10.7 mi |
Northern Cardinal Solar | Roanoke Rapids, NC | 3.1 GWh | 16.1 mi |
Schell Solar Farm | Garysburg, NC | 9.3 GWh | 15.7 mi |
SoINCPower5, LLC | Battleboro, NC | 10.1 GWh | 13.5 mi |
Sun Farm VIII, LLC | Battleboro, NC | 8.5 GWh | 12.7 mi |
SunEnergy1-Scotland Neck, LLC | Scotland Neck, NC | 5.7 GWh | 13.4 mi |
Sunflower Solar | Halifax, NC | 32.9 GWh | 12.7 mi |
Watson Seed Farm PV1 | Whitakers, NC | 32.2 GWh | 7.9 mi |
Whitakers | Whitakers, NC | 22.7 GWh | 8.5 mi |
Whitakers Farm (Fisher Rd) | Whitakers, NC | 6.0 GWh | 8.8 mi |