19469 McCall Ave, Reading, MN 56165Plant Summary Information
Nobles Wind Project is ranked #15 out of 737 power plants in Minnesota in terms of total annual net electricity generation.
Nobles Wind Project generated 190.8 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Nobles Wind Project |
---|---|
Utility Name | Northern States Power Co - Minnesota |
Location | Nobles County, MN |
Initial Operation Date | December 2010 |
Last Update | Oct 2024 |
Annual Generation | 763.0 GWh |
Annual Consumption | 2.9 M MMBtu |
Ranked #911 out of 11,866 Power Plants Nationwide | |
Ranked #157 out of 1,345 Wind Power Plants Nationwide | |
Ranked #15 out of 737 Minnesota Power Plants | |
Ranked #5 out of 125 Minnesota Wind Power Plants | |
Fuel Types | Wind |
Map of Nobles Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nobles Wind Project.
Monthly Net Generation for Nobles Wind Project
Nobles Wind Project Details
Summary Information | |
---|---|
Plant Name | Nobles Wind Project (57047) |
Plant Address | 19469 McCall Ave, Reading, MN 56165 |
Utility | Northern States Power Co - Minnesota (13781) |
Latitude, Longitude | 43.7036, -95.7131 |
Generation Dates on File | Dec 2010 to Oct 2024 |
Initial Operation Date | December 2010 |
Annual Generation | 763.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating December 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP NOBLES NOBLES_CWS1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP NOBLES NOBLES_CWS1 |
Nameplate Capacity | 201 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 134 |
Turbine Details | |
Number Of Turbines | 134 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Nobles Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#147 | Limon III Wind LLC | Limon, CO | 784.0 GWh |
#148 | Niyol Wind, LLC | Fleming, CO | 782.1 GWh |
#149 | Plymouth Wind | Remsen, IA | 781.9 GWh |
#150 | Longhorn Wind | Silverton, TX | 777.4 GWh |
#151 | Karankawa Wind LLC | Mathis, TX | 772.6 GWh |
#152 | Cedar Springs I | Douglas, WY | 772.3 GWh |
#153 | Red Dirt Wind Project | Hennessy, OK | 771.4 GWh |
#154 | Amadeus Wind Farm | Rotan, TX | 768.5 GWh |
#155 | Prairie Breeze | Elgin, NE | 765.7 GWh |
#156 | Trinity Hills | Olney, TX | 764.0 GWh |
#158 | Spinning Spur Wind III | Adrian, TX | 762.3 GWh |
#159 | Golden Plains | Buffalo Center, IA | 760.6 GWh |
#160 | Eclipse Wind Farm | Adair, IA | 758.4 GWh |
#161 | El Campo Wind | Truscott, TX | 753.4 GWh |
#162 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 750.2 GWh |
#163 | Crowned Ridge Wind Energy Center | Watertown, SD | 752.5 GWh |
#164 | Aragonne Wind LLC | Santa Rosa, NM | 750.3 GWh |
#165 | Courtenay Wind Farm | Courtenay, ND | 748.1 GWh |
#166 | Pleasant Valley Wind Farm | Dexter, MN | 746.8 GWh |
#167 | Ida Grove II | Ida Grove, IA | 745.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nobles Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adrian | Adrian, MN | 7.0 MWh | 11.9 mi |
Auriga Community Solar | Slayton, MN | 1.9 GWh | 19.1 mi |
B&K Energy Systems LLC | Brewster, MN | 5.0 GWh | 17.3 mi |
Cisco | Brewster, MN | 16.9 GWh | 17.9 mi |
Community Wind South | Rushmore, MN | 44.4 GWh | 4.5 mi |
DL Windy Acres LLC | Brewster, MN | 5.0 GWh | 17.6 mi |
Eastridge Wind Project | Porter, MN | 20.0 GWh | 19.1 mi |
Ewington Energy Systems, LLC | Worthington, MN | 88.3 GWh | 15.9 mi |
Fenton Wind Farm | Chandler, MN | 286.4 GWh | 18.4 mi |
G Flow Wind LLC | Rushmore, MN | 2.7 GWh | 8.7 mi |
Green Acres Breeze LLC | Rushmore, MN | 2.7 GWh | 8.8 mi |
Minnesota Breeze LLC | Rushmore, MN | 2.7 GWh | 8.9 mi |
Noble Ridge LLC | Wilmont, MN | 80.8 MWh | 7.8 mi |
Nobles 2 Wind Project | Wilmont, MN | 993.3 GWh | 9.2 mi |
S&P Windfarm LLC | Brewster, MN | 5.0 GWh | 16.9 mi |
Slayton Solar | Slayton, MN | 2.2 GWh | 19.3 mi |
South Fork Wind Farm | Round Lake, MN | 54.0 GWh | 18.7 mi |
Sunset Breeze LLC | Rushmore, MN | 2.7 GWh | 9.1 mi |
Wolf Wind Enterprises LLC | Rushmore, MN | 2.7 GWh | 9 mi |
Worthington | Worthington, MN | 9.8 GWh | 7.1 mi |