NLP Granger
30645 Mesa Crest Road, Valley Center, CA 92082Plant Summary Information
NLP Granger is ranked #374 out of 799 solar farms in California in terms of total annual net electricity generation.
NLP Granger generated 1.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | NLP Granger |
---|---|
Utility Name | Heelstone Energy Holdings, LLC |
Location | San Diego County, CA |
Initial Operation Date | September 2016 |
Last Update | Dec 2023 |
Annual Generation | 6.1 GWh |
Annual Consumption | 22.0 k MMBtu |
Ranked #7,234 out of 11,852 Power Plants Nationwide | |
Ranked #2,502 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,014 out of 1,570 California Power Plants | |
Ranked #374 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of NLP Granger
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NLP Granger.
Monthly Net Generation for NLP Granger
NLP Granger Details
Summary Information | |
---|---|
Plant Name | NLP Granger (60516) |
Plant Address | 30645 Mesa Crest Road, Valley Center, CA 92082 |
Utility | Heelstone Energy Holdings, LLC (59462) |
Latitude, Longitude | 33.2704, -117.0588 |
Generation Dates on File | Sep 2016 to Dec 2023 |
Initial Operation Date | September 2016 |
Annual Generation | 6.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-638-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator PV1 Details Operating September 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 3.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
NLP Granger Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2492 | Sunpin Blandford | Southwick, MA | 6.2 GWh |
#2493 | Sweet Tea Solar, LLC | New Bern, NC | 6.2 GWh |
#2494 | Springfield Solar PV | Springfield, MA | 6.2 GWh |
#2495 | Stanford Campus Solar | Stanford, CA | 6.1 GWh |
#2496 | Laho Solar Plant | Milford, UT | 6.1 GWh |
#2497 | Blackhorse Farm Solar, LLC CSG | Warren, RI | 6.1 GWh |
#2498 | Beryl Solar Plant | Beryl, UT | 6.1 GWh |
#2499 | Garnet Solar Generation Station I LLC | Palm Springs, CA | 6.1 GWh |
#2500 | Moncure Farm LLC | Moncure, NC | 6.1 GWh |
#2501 | CSUF Trigeneration | Fullerton, CA | 34.7 GWh |
#2503 | Milford Flat Solar Plant | Milford, UT | 6.1 GWh |
#2504 | Fitchburg Renewables | Fitchburg, MA | 6.1 GWh |
#2505 | TWE New Bern Solar Project, LLC | New Bern, NC | 6.1 GWh |
#2506 | Brush Solar Center | Unity, OR | 6.1 GWh |
#2507 | West Riverside Energy Center | Beloit, WI | 4.8 TWh |
#2508 | Chambers Road Solar | Big Flats, NY | 6.1 GWh |
#2509 | Ransomville Solar 1, LLC | Ransomville, NY | 6.1 GWh |
#2510 | Segunda II (CSG) | Streator, IL | 6.1 GWh |
#2511 | Dresser Hill CSG | Southbridge, MA | 6.1 GWh |
#2512 | Shasta Solar Farm | Fall River Mills, CA | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NLP Granger.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bear Valley | Escondido, CA | 2.7 GWh | 7.6 mi |
CalPeak Power Enterprise Peaker Plant | Escondido, CA | 5.5 GWh | 10.8 mi |
Carlsbad Energy Center | Carlsbad, CA | 254.2 GWh | 18.3 mi |
Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh | 18.5 mi |
Escondido Energy Center | Escondido, CA | 23.3 GWh | 10.5 mi |
GEN005 Antibody Fuel Cell | Oceanside, CA | 16.3 GWh | 14.5 mi |
Genentech-Oceanside Hybrid | Oceanside, CA | 5.0 GWh | 14.5 mi |
Gilead Oceanside Solar Project | Oceanside, CA | 2.3 GWh | 14.7 mi |
Goal Line LP | Escondido, CA | 13.1 GWh | 10.8 mi |
Life Technologies Carlsbad | Carlsbad, CA | 7.6 GWh | 16.1 mi |
Orange Grove Peaking Facility | Pala, CA | 18.1 GWh | 6.9 mi |
Palomar Energy | Escondido, CA | 1.2 TWh | 11 mi |
Red Mountain | Fallbrook, CA | 23.1 GWh | 11.4 mi |
San Diego - NCRC at Vista | Vista, CA | 2.8 GWh | 12.6 mi |
SDCWA - Twin Oaks | San Marcos, CA | 117.0 MWh | 7.7 mi |
Vallecitos Water District | San Marcos, CA | 3.4 GWh | 7.9 mi |
Valley Center | Valley Center, CA | 3.5 GWh | 2.5 mi |
Valley Center 1 | Valley Center, CA | 3.9 GWh | 4.1 mi |
Valley Center 2 | Valley Center, CA | 6.8 GWh | 4.1 mi |
Watkins Manufacturing Co. | San Diego, CA | 4.9 GWh | 13.5 mi |