Nitro Solar
1990 Yelverton Grove Road, Smitfield, NC 27577Plant Summary Information
Nitro Solar is ranked #403 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Nitro Solar generated 1.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Nitro Solar |
---|---|
Utility Name | USF Surry, LLC |
Location | Johnston County, NC |
Initial Operation Date | July 2015 |
Last Update | Dec 2023 |
Annual Generation | 8.5 GWh |
Annual Consumption | 30.4 k MMBtu |
Ranked #6,419 out of 11,835 Power Plants Nationwide | |
Ranked #1,914 out of 5,643 Solar Power Plants Nationwide | |
Ranked #478 out of 862 North Carolina Power Plants | |
Ranked #403 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Nitro Solar, LLC (2014 to 2016) Greenbacker Renewable Energy Corporation (2017 to 2018) USF Surry LLC (2019 to 2020) USF Surry, LLC (2021 to 2023) |
Map of Nitro Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nitro Solar.
Monthly Net Generation for Nitro Solar
Nitro Solar Details
Summary Information | |
---|---|
Plant Name | Nitro Solar (59501) |
Plant Address | 1990 Yelverton Grove Road, Smitfield, NC 27577 |
Utility | USF Surry, LLC (66042) |
Latitude, Longitude | 35.48694, -78.31389 |
Generation Dates on File | Jul 2015 to Dec 2023 |
Initial Operation Date | July 2015 |
Annual Generation | 8.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-367-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.90 kV |
Energy Storage | No |
Generator NITRO Details Operating July 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 6.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Nitro Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1904 | Sun Farm VIII, LLC | Battleboro, NC | 8.5 GWh |
#1905 | Royal Solar | Godwin, NC | 8.5 GWh |
#1906 | Nesvold Watertown Solar | Watertown, MN | 8.5 GWh |
#1907 | GSSP Schneider LLC | Waite Park, MN | 8.5 GWh |
#1908 | UC Merced Solar Hybrid | Merced, CA | 8.5 GWh |
#1909 | Warren Solar Farm LLC | Newton Grove, NC | 8.5 GWh |
#1910 | Daniel Farm LLC | Mocksville, NC | 8.5 GWh |
#1911 | Hastings Solar | Hastings, MN | 8.5 GWh |
#1912 | Market Farm | Reidsville, NC | 8.5 GWh |
#1913 | Dartmouth | Dartmouth, MA | 8.5 GWh |
#1915 | Dement Farm LLC | Henderson, NC | 8.5 GWh |
#1916 | West Creek Solar | Newark Valley, NY | 8.5 GWh |
#1917 | West Street Solar 1 LLC | Gardner, MA | 8.5 GWh |
#1918 | Munro Valley Solar | Olancha, CA | 8.5 GWh |
#1919 | Union Springs 40 | Union Spring, NY | 8.5 GWh |
#1920 | Stout Farm | Mebane, NC | 8.5 GWh |
#1921 | Innovative Solar 64 | Clinton, NC | 8.5 GWh |
#1922 | Adirondack A+B Community Solar Garden | Westport, MA | 8.5 GWh |
#1923 | JBAB - Washington DC | Washington, DC | 8.5 GWh |
#1924 | Lancaster | Lancaster, CA | 8.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nitro Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
315 Vinson Road | Clayton, NC | 4.4 GWh | 10.6 mi |
4Oaks | Four Oaks, NC | 8.3 GWh | 6.7 mi |
Bizzell Church Solar 1, LLC | Selma, NC | 9.3 GWh | 8.7 mi |
Bizzell Church Solar 2 | Selma, NC | 8.5 GWh | 8.7 mi |
Candace Solar | Princeton, NC | 9.0 GWh | 6.8 mi |
CII Methane Management IV, LLC | Smithfield, NC | 7.9 GWh | 7 mi |
ESA Four Oaks 2 NC LLC | Four Oaks, NC | 3.0 GWh | 7.3 mi |
ESA Selma | Selma, NC | 2.6 GWh | 3 mi |
ESA Smithfield | Smithfield, NC | 3.0 GWh | 0.3 mi |
Happy Solar | Four Oaks, NC | 7.3 GWh | 12.7 mi |
Keen Farm | Four Oaks, NC | 8.8 GWh | 6.4 mi |
Langdon Solar Farm, LLC | Four Oaks, NC | 8.7 GWh | 6.2 mi |
Powatan Road Solar | Clayton, NC | 4.2 GWh | 8.6 mi |
Princeton | Princeton, NC | 8.2 GWh | 7 mi |
Red Toad 1425 A Powatan Road, LLC | Clayton, NC | 3.7 GWh | 8.7 mi |
Red Toad 4451 Buffalo Road, LLC | Selma, NC | 4.0 GWh | 5 mi |
Red Toad 5840 Buffalo Road, LLC | Selma, NC | 4.4 GWh | 6 mi |
Rosewood Solar | Goldsboro, NC | 3.9 GWh | 12.1 mi |
Selma Solar LLC | Selma, NC | 7.6 GWh | 9.6 mi |
Wellons Farm | Smithfield, NC | 9.2 GWh | 2.1 mi |