Nippon Dynawave Packaging Longview WA
3401 Industrial Way, Longview, WA 98632Plant Summary Information
Nippon Dynawave Packaging Longview WA is ranked #1 out of 4 black liquor power plants in Washington in terms of total annual net electricity generation.
Nippon Dynawave Packaging Longview WA is comprised of 4 generators and generated 82.1 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Nippon Dynawave Packaging Longview WA |
---|---|
Utility Name | Nippon Dynawave Packaging Co. |
Location | Cowlitz County, WA |
Initial Operation Date | January 1948 |
Last Update | Oct 2024 |
Annual Generation | 299.2 GWh |
Annual Consumption | 18.0 M MMBtu |
Ranked #1,851 out of 11,866 Power Plants Nationwide | |
Ranked #55 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #53 out of 134 Washington Power Plants | |
Ranked #1 out of 4 Washington Black Liquor Power Plants | |
Fuel Types | Black Liquor : 47.2% Natural Gas : 23.1% Wood/Wood Waste Solids : 18.1% Subbituminous Coal : 8.0% Sludge Waste : 3.3% |
Previous Operator |
Weyerhaeuser Co (2013 to 2015) Nippon Dynawave Packaging Co. (2016 to 2023) |
Map of Nippon Dynawave Packaging Longview WA
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nippon Dynawave Packaging Longview WA.
Monthly Net Generation for Nippon Dynawave Packaging Longview WA
Nippon Dynawave Packaging Longview WA Details
Summary Information | |
---|---|
Plant Name | Nippon Dynawave Packaging Longview WA (50187) |
Plant Address | 3401 Industrial Way, Longview, WA 98632 |
Utility | Nippon Dynawave Packaging Co. (60561) |
Latitude, Longitude | 46.1236, -122.9728 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | January 1948 |
Annual Generation | 299.2 GWh |
Fuel Types | Black Liquor : 47.2% Natural Gas : 23.1% Wood/Wood Waste Solids : 18.1% Subbituminous Coal : 8.0% Sludge Waste : 3.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | (322122) |
Sector | Industrial CHP (7) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Cowlitz County (4442) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator TG1 Details Operating January 1948
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 7.4 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1948 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Residual Fuel Oil |
Startup Source | Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | BLQ / RFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 6.3 MW |
Net Winter Capacity With Natural Gas | 6.3 MW |
Net Summer Capacity With Oil | 6.3 MW |
Net Winter Capacity With Oil | 6.3 MW |
Time To Switch From Gas To Oil | 72H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator TG2 Details Operating January 1948
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.7 MW |
Winter Capacity | 4.7 MW |
Minimum Load | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1948 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Residual Fuel Oil |
Startup Source | Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | BLQ / RFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 4.7 MW |
Net Winter Capacity With Natural Gas | 4.7 MW |
Net Summer Capacity With Oil | 4.7 MW |
Net Winter Capacity With Oil | 4.7 MW |
Time To Switch From Gas To Oil | 72H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator TG4 Details Operating January 1954
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Nameplate Power Factor | 0.96 |
Summer Capacity | 16.7 MW |
Winter Capacity | 16.9 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1954 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Residual Fuel Oil |
Startup Source | Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | No |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | BLQ / RFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 16.7 MW |
Net Winter Capacity With Natural Gas | 16.9 MW |
Net Summer Capacity With Oil | 16.7 MW |
Net Winter Capacity With Oil | 16.9 MW |
Time To Switch From Gas To Oil | 72H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator TG5 Details Operating January 1976
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 31.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 29.2 MW |
Winter Capacity | 29.5 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1976 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Wood/Wood Waste Solids / Subbituminous Coal / Sludge Waste / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | WDS / SUB / DFO / SLW |
---|
Nippon Dynawave Packaging Longview WA Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#45 | WestRock Demopolis Mill | Demopolis, AL | 290.7 GWh |
#46 | Georgia-Pacific Palatka Operations | Palatka, FL | 320.3 GWh |
#47 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 344.1 GWh |
#48 | International Paper Pensacola | Cantonment, FL | 336.2 GWh |
#49 | Riverwood International Macon Mill | Macon, GA | 359.3 GWh |
#50 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 275.9 GWh |
#51 | International Paper Co. - New Bern Mill | New Bern, NC | 197.8 GWh |
#52 | Woodland Pulp, LLC | Baileyville, ME | 366.6 GWh |
#53 | Buckeye Florida LP | Perry, FL | 270.5 GWh |
#54 | International Paper - Orange | Orange, TX | 238.6 GWh |
#56 | Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh |
#57 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 207.7 GWh |
#58 | Plant 31 Paper Mill | West Monroe, LA | 490.9 GWh |
#59 | Hopewell Mill | Hopewell, VA | 282.6 GWh |
#60 | Canton North Carolina | Canton, NC | 281.5 GWh |
#61 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 191.7 GWh |
#62 | International Paper Vicksburg Mill | Vicksburg, MS | 208.6 GWh |
#63 | WestRock (WA) | Tacoma, WA | 196.3 GWh |
#64 | Longview Fibre | Longview, WA | 170.9 GWh |
#65 | U S Alliance Coosa Pines | Coosa Pines, AL | 139.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nippon Dynawave Packaging Longview WA.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver | Clatskanie, OR | 1.7 TWh | 10.2 mi |
Chehalis Generating Facility | Chehalis, WA | 2.4 TWh | 34.6 mi |
Cowlitz Falls | Randle, WA | 190.4 GWh | 47.5 mi |
Durham AWTF | Tigard, OR | 8.8 GWh | 50.9 mi |
Georgia-Pacific Wauna Mill | Clatskanie, OR | 191.7 GWh | 20.9 mi |
Longview Fibre | Longview, WA | 170.9 GWh | 2.9 mi |
Mayfield | Silver Creek, WA | 545.0 GWh | 32 mi |
Merwin | Ariel, WA | 471.6 GWh | 23.1 mi |
MilfordSolar OR | Forest Grove, OR | 4.3 GWh | 38.4 mi |
Mint Farm Generating Station | Longview, WA | 2.0 TWh | 1.2 mi |
Mossyrock | Silver Creek, WA | 860.6 GWh | 38.6 mi |
O'Neill Creek Solar | Gaston, OR | 3.9 GWh | 45.6 mi |
Oregon Convention Center | Portland, OR | 1.7 GWh | 43.7 mi |
Port Westward | Clatskanie, OR | 2.7 TWh | 10.3 mi |
Port Westward Unit 2 | Clatskanie, OR | 1.2 TWh | 10.3 mi |
River Road Gen Plant | Vancouver, WA | 1.6 TWh | 34.8 mi |
Skookumchuck | Tenino, WA | 3.2 GWh | 47.2 mi |
Swift 1 | Cougar, WA | 564.7 GWh | 37.2 mi |
Transalta Centralia Generation | Centralia, WA | 2.8 TWh | 44 mi |
Yale | Amboy, WA | 516.9 GWh | 32.5 mi |