Niles RTO BTM
1000 Belmont Ave, Niles, OH 44446Plant Summary Information
Niles RTO BTM is ranked #16 out of 56 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
Niles RTO BTM is comprised of 4 generators and generated 127.5 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Niles RTO BTM |
---|---|
Utility Name | American Mun Power-Ohio, Inc |
Location | Trumbull County, OH |
Initial Operation Date | February 2020 |
Last Update | Dec 2023 |
Annual Generation | 418.0 MWh |
Annual Consumption | 3.8 k MMBtu |
Ranked #11,079 out of 11,835 Power Plants Nationwide | |
Ranked #540 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #147 out of 182 Ohio Power Plants | |
Ranked #16 out of 56 Ohio Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Niles RTO BTM
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Niles RTO BTM.
Monthly Net Generation for Niles RTO BTM
Niles RTO BTM Details
Summary Information | |
---|---|
Plant Name | Niles RTO BTM (66437) |
Plant Address | 1000 Belmont Ave, Niles, OH 44446 |
Utility | American Mun Power-Ohio, Inc (40577) |
Latitude, Longitude | 41.16802, -80.75292 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | February 2020 |
Annual Generation | 418.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | City of Niles - (OH) (13602) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator PB1 Details Operating February 2020
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PB2 Details Operating February 2020
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PB3 Details Operating February 2020
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PB4 Details Operating February 2020
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Niles RTO BTM Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#530 | Vienna Operations | Vienna, MD | 2.9 GWh |
#531 | Cope | Cope, SC | 1.7 TWh |
#532 | Meridian | Meridian, MS | 434.0 MWh |
#533 | GCWA | Texas City, TX | 433.0 MWh |
#534 | Godwin Drive Plant | Manassas, VA | 430.0 MWh |
#535 | Lost Nation | Groveton, NH | 428.0 MWh |
#536 | Long Creek Waste Water Plant | Dallas, NC | 428.0 MWh |
#537 | Ponton Diesel Generating Facility | Amelia, VA | 426.0 MWh |
#538 | Henrico | Glen Allen, VA | 7.3 GWh |
#539 | Iowa State University | Ames, IA | 86.8 GWh |
#541 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh |
#542 | Northeast (MI) | Warren, MI | 1.8 GWh |
#543 | Water Treatment 1 & 2 | Groton, CT | 413.0 MWh |
#544 | Frank Knutson | Commerce City, CO | 246.6 GWh |
#545 | Clewiston Sugar House | Clewiston, FL | 272.6 GWh |
#546 | Pleasant Valley (MN) | Dexter, MN | 104.1 GWh |
#547 | E C Gaston | Wilsonville, AL | 3.9 TWh |
#548 | Marshall Energy Facility | Calvert City, KY | 46.0 GWh |
#549 | Mead Coated Board | Mahrt, AL | 758.7 GWh |
#550 | Grundy Center City Light Plant | Grundy Center, IA | 388.1 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Niles RTO BTM.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.8 GWh | 42.5 mi |
Beaver Solar LLC | Beaver, PA | 514.0 MWh | 39.8 mi |
Beaver Valley | Shippingport, PA | 15.1 TWh | 41.3 mi |
Beaver Valley Patterson Dam | Beaver Falls, PA | 4.8 GWh | 37.1 mi |
Carroll County Energy | Carrollton, OH | 5.3 TWh | 42.1 mi |
Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.5 TWh | 5.3 mi |
Clevelandcliffs Warren | Warren, OH | 57.4 GWh | 4.5 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 707.0 MWh | 37.6 mi |
Foxconn Ohio | Warren, OH | 2.0 GWh | 6.9 mi |
General Electric Diesel Engine Plant | Grove City, PA | 5.4 GWh | 33.7 mi |
Hickory Run Energy Station | New Castle, PA | 5.9 TWh | 20.7 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 8.8 mi |
Mahoning | New Springfield, OH | 28.9 GWh | 19.6 mi |
New Castle Plant | West Pittsburg, PA | 898.1 GWh | 25.6 mi |
Pine 1 Solar | Hookstown, PA | 623.0 MWh | 41.1 mi |
Pine 2 Solar | Hookstown, PA | 978.0 MWh | 40.9 mi |
Shell Chemical Appalachia LLC | Monaca, PA | 1.5 TWh | 40.6 mi |
South Field Energy | Wellsville, OH | 8.5 TWh | 37 mi |
Summit Street Power Plant | Kent, OH | 30.5 GWh | 30.6 mi |
Townsend Hydro | New Brighton, PA | 17.6 GWh | 37.7 mi |