Nicolis Solar PV Plant
23219 Avenue 24, Delano, CA 93215Plant Summary Information
Nicolis Solar PV Plant is ranked #180 out of 799 solar farms in California in terms of total annual net electricity generation.
Nicolis Solar PV Plant generated 8.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Nicolis Solar PV Plant |
---|---|
Utility Name | Arevon Energy, Inc. |
Location | Tulare County, CA |
Initial Operation Date | September 2016 |
Last Update | Dec 2023 |
Annual Generation | 43.8 GWh |
Annual Consumption | 155.3 k MMBtu |
Ranked #4,039 out of 11,852 Power Plants Nationwide | |
Ranked #839 out of 5,655 Solar Power Plants Nationwide | |
Ranked #511 out of 1,570 California Power Plants | |
Ranked #180 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
W Power LLC (2014 to 2014) Nicolis, LLC (2015 to 2019) CD Arevon USA, Inc. (2020 to 2021) Arevon Energy, Inc. (2022 to 2023) |
Map of Nicolis Solar PV Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nicolis Solar PV Plant.
Monthly Net Generation for Nicolis Solar PV Plant
Nicolis Solar PV Plant Details
Summary Information | |
---|---|
Plant Name | Nicolis Solar PV Plant (59600) |
Plant Address | 23219 Avenue 24, Delano, CA 93215 |
Utility | Arevon Energy, Inc. (61230) |
Latitude, Longitude | 35.83583, -119.05611 |
Generation Dates on File | Sep 2016 to Dec 2023 |
Initial Operation Date | September 2016 |
Annual Generation | 43.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 19 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Nicolis Solar PV Plant Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#829 | Bayshore Solar B, LLC | Lancaster, CA | 44.9 GWh |
#830 | Wildwood Solar I, LLC | Wasco, CA | 44.7 GWh |
#831 | Windhub Solar A LLC | Mojave, CA | 44.6 GWh |
#832 | Western Antelope Blue Sky Ranch A | Lancaster, CA | 44.5 GWh |
#833 | Camden Solar LLC | South Camden, NC | 44.4 GWh |
#834 | RE Gaskell West 4 LLC | Rosamond, CA | 44.3 GWh |
#835 | RE Gaskell West 5 LLC | Rosamond, CA | 44.2 GWh |
#836 | Little Bear 4 | Mendota, CA | 44.2 GWh |
#837 | American Falls Solar | American Falls, ID | 43.9 GWh |
#838 | Avalon Solar II | Sahuarita, AZ | 43.9 GWh |
#840 | Pumpjack Solar I | McKittrick, CA | 43.8 GWh |
#841 | Alamo Solar | Oro Grande, CA | 43.7 GWh |
#842 | Todd Solar | Hurlock, MD | 43.5 GWh |
#843 | Greater Sandhill I | Mosca, CO | 43.4 GWh |
#844 | Calverton Solar Energy Center | Calverton, NY | 43.3 GWh |
#845 | Cameron Solar | Cameron, SC | 43.3 GWh |
#846 | Tinton Falls Solar Farm | Tinton Falls, NJ | 43.3 GWh |
#847 | American Falls Solar II | American Falls, ID | 43.2 GWh |
#848 | Jacumba Solar Farm | Jacumba, CA | 43.2 GWh |
#849 | Murphy Flat Solar | Murphy, ID | 42.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nicolis Solar PV Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Castle Rock Vineyards | Delano, CA | 1.7 GWh | 3.9 mi |
CED Ducor 1 | Ducor, CA | 47.7 GWh | 1.6 mi |
CED Ducor 2 | Ducor, CA | 47.2 GWh | 0.9 mi |
CED Ducor 3 | Ducor, CA | 36.1 GWh | 0.7 mi |
CED Ducor 4 | Ducor, CA | 46.9 GWh | 1.9 mi |
Delano Energy Center | Delano, CA | 2.9 GWh | 13.7 mi |
Delano Land 1 | Delano, CA | 990.0 MWh | 17 mi |
E&B Resources | Bakersfield, CA | 2.3 GWh | 20.8 mi |
Kern Valley SP | Delano, CA | 619.0 MWh | 15.3 mi |
Luciana | Richgrove, CA | 127.7 GWh | 0.9 mi |
Mt Poso Cogeneration | Bakersfield, CA | 267.8 GWh | 18.1 mi |
North Kern State Prison Phase II | Delano, CA | 7.5 GWh | 14.7 mi |
Porterville 6 and 7 | Porterville, CA | 3.2 GWh | 14.9 mi |
Porterville Solar | Porterville, CA | 6.0 GWh | 18.5 mi |
Roll Delano | Delano, CA | 8.9 GWh | 12.3 mi |
Roll Delano 2 | Delano, CA | 7.4 GWh | 12.2 mi |
Solar Photovoltaic Project #42 | Tulare, CA | 6.9 GWh | 13.3 mi |
Tropico Solar PV Plant | Delano, CA | 30.0 GWh | 0.3 mi |
Tulare Success Power Project | Porterville, CA | 538.0 MWh | 17.1 mi |
White River Solar 2 | Alpaugh, CA | 49.3 GWh | 2.7 mi |