Nickelson Solar 2
152 Harry Nicolson Ln., Wallace, NC 28466Plant Summary Information
Nickelson Solar 2 is ranked #195 out of 738 solar farms in North Carolina in terms of total annual net electricity generation.
Nickelson Solar 2 generated 2.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Nickelson Solar 2 |
---|---|
Utility Name | Nickelson Solar 2, LLC |
Location | Duplin County, NC |
Initial Operation Date | September 2018 |
Last Update | Dec 2022 |
Annual Generation | 10.0 GWh |
Annual Consumption | 37.0 k MMBtu |
Ranked #5,863 out of 11,249 Power Plants Nationwide | |
Ranked #1,488 out of 5,158 Solar Power Plants Nationwide | |
Ranked #271 out of 858 North Carolina Power Plants | |
Ranked #195 out of 738 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Nickelson Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nickelson Solar 2.
Monthly Net Generation for Nickelson Solar 2
Nickelson Solar 2 Details
Summary Information | |
---|---|
Plant Name | Nickelson Solar 2 (64119) |
Plant Address | 152 Harry Nicolson Ln. Wallace, NC 28466 |
Utility | Nickelson Solar 2, LLC (63748) |
Latitude, Longitude | 34.7457, -77.988 |
Generation Dates on File | Jan 2020 to Dec 2022 |
Initial Operation Date | September 2018 |
Annual Generation | 10.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-818-002 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator NS2 Details Operating September 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.9 MW |
Summer Capacity | 4.9 MW |
Winter Capacity | 4.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Nickelson Solar 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1478 | Siler City Solar 2 | Siler City, NC | 10.1 GWh |
#1479 | Blueberry One | Grantham, NC | 10.1 GWh |
#1480 | Coats Solar Farm, LLC | Coats, NC | 10.1 GWh |
#1481 | Mill Pond Solar Farm, LLC | Whiteville, NC | 10.1 GWh |
#1482 | GDIM 3, LLC | North Smithfield, RI | 10.1 GWh |
#1483 | Railroad Farm 2 | St. Pauls, NC | 10.1 GWh |
#1484 | Lang Solar Farm | La Grange, NC | 10.1 GWh |
#1485 | Warrenton I Solar | Warrenton, NC | 10.1 GWh |
#1486 | Tesla Reno GigaFactory | Sparks, NV | 10.1 GWh |
#1487 | Meadowlark Solar | Dunn, NC | 10.0 GWh |
#1489 | Sun Farm V, LLC | Hertford, NC | 10.0 GWh |
#1490 | Mohave Electric at Fort Mohave | Fort Mohave, AZ | 10.0 GWh |
#1491 | McKenzie Farm | Whiteville, NC | 10.0 GWh |
#1492 | Meadowbrook Solar Farm | Rockwell, NC | 10.0 GWh |
#1493 | Cotten Farm, LLC | Sanford, NC | 10.0 GWh |
#1494 | Gaston Solar | Gaston, NC | 10.0 GWh |
#1495 | Bunn Level Farm, LLC | Bunnlevel, NC | 10.0 GWh |
#1496 | Boaz Farm Solar | Sanford, NC | 10.0 GWh |
#1497 | Spencer Farm, LLC | Salisbury, NC | 10.0 GWh |
#1498 | Laurinburg Farm | Laurinburg, NC | 10.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nickelson Solar 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aspen Solar, LLC | Rose Hill, NC | 9.7 GWh | 3.4 mi |
Bearford Farm Solar Project | Willard, NC | 9.5 GWh | 10.1 mi |
Bearford Solar II | Burgaw, NC | 9.8 GWh | 9.8 mi |
Brick City Solar | Wallace, NC | 8.5 GWh | 1.4 mi |
Buttercup Solar, LLC | Rose Hill, NC | 11.5 GWh | 5.4 mi |
Crooked Run | Willard, NC | 148.4 GWh | 4.8 mi |
Duplin Solar I LLC (160 Houston Lane) | Kenansville, NC | 8.4 GWh | 14.8 mi |
Hall Solar Energy Storage | Teachey, NC | 3.4 GWh | 4.4 mi |
Hickory | Rose Hill, NC | 10.6 GWh | 4.1 mi |
Innovative Solar 67 | Willard, NC | 75.2 GWh | 8.5 mi |
Kenansville | Kenansville, NC | 3.5 GWh | 15.1 mi |
Kenansville Solar 2, LLC | Kenansville, NC | 3.8 GWh | 14.7 mi |
Lanier Solar | Beulaville, NC | 9.9 GWh | 14.7 mi |
Ludie Brown Solar Energy Storage | Chinquapin, NC | 3.6 GWh | 13.7 mi |
Nickelson Solar, LLC | Wallace, NC | 10.1 GWh | 0.1 mi |
Rose Hill | Rose Hill, NC | 3.2 GWh | 5.5 mi |
Scotch Bonnet Solar, LLC | St Helena, NC | 7.6 GWh | 15 mi |
Town of Cary | Apex, NC | 1.4 GWh | 5.5 mi |
Wallace | Wallace, NC | 3.3 GWh | 1.3 mi |
Willard Solar | Willard, NC | 8.1 GWh | 3.2 mi |