Nickel 1 Solar Facility
20732 GP Road, Lost Hills, CA 93249Plant Summary Information
Nickel 1 Solar Facility is ranked #546 out of 801 solar farms in California in terms of total annual net electricity generation.
Nickel 1 Solar Facility generated 618.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Nickel 1 Solar Facility |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Kern County, CA |
Initial Operation Date | November 2012 |
Last Update | Dec 2023 |
Annual Generation | 2.8 GWh |
Annual Consumption | 10.0 k MMBtu |
Ranked #9,172 out of 11,866 Power Plants Nationwide | |
Ranked #4,015 out of 5,672 Solar Power Plants Nationwide | |
Ranked #1,262 out of 1,571 California Power Plants | |
Ranked #546 out of 801 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
NLH1 Solar LLC (2013 to 2019) Altus Power America Management, LLC (2020 to 2023) |
Map of Nickel 1 Solar Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nickel 1 Solar Facility.
Monthly Net Generation for Nickel 1 Solar Facility
Nickel 1 Solar Facility Details
Summary Information | |
---|---|
Plant Name | Nickel 1 Solar Facility (58034) |
Plant Address | 20732 GP Road, Lost Hills, CA 93249 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 35.6473, -119.71651 |
Generation Dates on File | Nov 2012 to Dec 2023 |
Initial Operation Date | November 2012 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Nickel 1 Solar Facility Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4005 | HQC Rock River Solar Power Gen Station | Beloit, WI | 2.8 GWh |
#4006 | Victor Valley CC CPV Solar | Victorville, CA | 2.8 GWh |
#4007 | Kelly Bridge Road Community Solar Farm | Liberty, NY | 2.8 GWh |
#4008 | Elizabethtown Solar | Elizabethtown, PA | 2.8 GWh |
#4009 | Hobart & William Smith College Gates Rd. | Geneva, NY | 2.8 GWh |
#4010 | Atascadero State Hospital | Atascadero, CA | 2.8 GWh |
#4011 | Charter Durabar at Woodstock | Woodstock, IL | 2.8 GWh |
#4012 | Bd of Educ of Queen Anne's Cnty, Cnty HS | Centreville, MD | 2.8 GWh |
#4013 | Stetson Road Solar - Barre I | Barre, MA | 2.8 GWh |
#4014 | Chittenden County Solar Partners | South Burlington, VT | 2.8 GWh |
#4016 | Atlantic City Convention Center | Atlantic City, NJ | 2.8 GWh |
#4017 | Lawrence Brook | Morristown, VT | 2.8 GWh |
#4018 | Carver MA 1 Community Solar | Carver, MA | 2.8 GWh |
#4019 | Greenville CSG | Port Jervis, NY | 2.8 GWh |
#4020 | Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.8 GWh |
#4021 | Weston Landfill Solar | Weston, MA | 2.8 GWh |
#4022 | White Plains_RFP-Gedney Way Landfill | White Plains, NY | 2.8 GWh |
#4023 | San Diego - NCRC at Vista | Vista, CA | 2.8 GWh |
#4024 | Columbia Bryson | Grovetown, GA | 2.8 GWh |
#4025 | Panda Solar NC 7, LLC | Faison, NC | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nickel 1 Solar Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blackwell Solar Park | Lost Hills, CA | 40.1 GWh | 7.6 mi |
Chevron - Lost Hills Hybrid | Lost Hills, CA | 65.3 GWh | 2.4 mi |
Coronal Lost Hills | Lost Hills, CA | 28.6 GWh | 12 mi |
Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 25.3 GWh | 8.5 mi |
Elk Hills Cogen | Tupman, CA | 80.7 GWh | 11.7 mi |
Lost Hills Cogeneration Plant | Lost Hills, CA | 2.6 GWh | 3.1 mi |
Lost Hills Oilfield | Lost Hills, CA | 4.4 GWh | 7.5 mi |
Lost Hills/Blackwell | Lost Hills, CA | 77.1 GWh | 7.7 mi |
Morelos del Sol | Lost Hills, CA | 29.5 GWh | 8.2 mi |
Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh | 16.1 mi |
Rio Bravo Solar II LLC | McKittrick, CA | 48.0 GWh | 16.3 mi |
Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 9.7 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 485.1 GWh | 14.4 mi |
Wildwood Solar I, LLC | Wasco, CA | 44.7 GWh | 8.1 mi |
Wildwood Solar II | Wasco, CA | 36.6 GWh | 8.1 mi |
Wonderful Huller & Shellling | Lost Hills, CA | 3.8 GWh | 6.4 mi |
Wonderful Kings | Lost Hills, CA | 2.9 GWh | 12 mi |
Wonderful Lost Hills | Lost Hills, CA | 48.3 GWh | 9.1 mi |
Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh | 10.3 mi |
Wonderful Orchards - Westside | Lost Hills, CA | 11.8 GWh | 6.1 mi |