Nickajack
Highway 156, New Hope, TN 37340Plant Summary Information
Nickajack is ranked #17 out of 84 power plants in Tennessee in terms of total annual net electricity generation.
Nickajack is comprised of 4 generators and generated 117.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Nickajack |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Marion County, TN |
Initial Operation Date | February 1968 |
Last Update | Dec 2023 |
Annual Generation | 509.6 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,280 out of 11,852 Power Plants Nationwide | |
Ranked #79 out of 1,371 Water Power Plants Nationwide | |
Ranked #17 out of 84 Tennessee Power Plants | |
Ranked #6 out of 28 Tennessee Water Power Plants | |
Fuel Types | Water |
Map of Nickajack
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nickajack.
Monthly Net Generation for Nickajack
Nickajack Details
Summary Information | |
---|---|
Plant Name | Nickajack (3409) |
Plant Address | Highway 156, New Hope, TN 37340 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 35.0017, -85.6218 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | February 1968 |
Annual Generation | 509.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Tennessee River |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 3 Details Operating February 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 25 MW |
Winter Capacity | 25.6 MW |
Minimum Load | 12.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating February 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 25 MW |
Winter Capacity | 25.6 MW |
Minimum Load | 12.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1 Details Operating April 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 28.3 MW |
Winter Capacity | 28.8 MW |
Minimum Load | 13.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating April 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 27.3 MW |
Winter Capacity | 28 MW |
Minimum Load | 13.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Nickajack Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#69 | Mayfield | Silver Creek, WA | 545.0 GWh |
#70 | Haas | Balch Camp, CA | 541.0 GWh |
#71 | Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh |
#72 | Big Creek 2A | Auberry, CA | 536.5 GWh |
#73 | Collierville Powerhouse | Murphys, CA | 531.8 GWh |
#74 | Calderwood | Tallassee, TN | 521.6 GWh |
#75 | Mammoth Pool | North Fork, CA | 520.8 GWh |
#76 | Yale | Amboy, WA | 516.9 GWh |
#77 | Walter Bouldin Dam | Wetumpka, AL | 514.5 GWh |
#78 | New Melones | Jamestown, CA | 511.1 GWh |
#80 | Dion R Holm | Groveland, CA | 509.3 GWh |
#81 | Wyman Hydro | Bingham, ME | 501.6 GWh |
#82 | Barkley | Kuttawa, KY | 500.5 GWh |
#83 | Table Rock | Branson, MO | 499.1 GWh |
#84 | Don Pedro | La Grange, CA | 491.6 GWh |
#85 | Balch 2 | Balch Camp, CA | 489.7 GWh |
#86 | Ryan | Great Falls, MT | 486.3 GWh |
#87 | Pine Flat | Piedra, CA | 485.0 GWh |
#88 | Middle Fork | Foresthill, CA | 475.6 GWh |
#89 | Merwin | Ariel, WA | 471.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nickajack.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Carters | Chatsworth, GA | 6.0 GWh | 60.2 mi |
Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.4 GWh | 23.4 mi |
Chickamauga | Chattanooga, TN | 657.3 GWh | 23.2 mi |
Dalton 2 | Dalton, GA | 8.6 GWh | 43.7 mi |
Elora Solar | Elora, TN | 304.6 GWh | 40.8 mi |
Great Falls (TN) | Rock Island, TN | 32.2 GWh | 55.6 mi |
Guntersville | Guntersville, AL | 453.4 GWh | 59.4 mi |
Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh | 54.4 mi |
McMinnville | McMinnville, TN | 143.0 MWh | 49.1 mi |
Murray Treadwell Farms | Chatsworth, GA | 6.4 GWh | 48.5 mi |
Ocoee 1 | Benton, TN | 69.8 GWh | 55.5 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 15.5 GWh | 62.3 mi |
Sand Valley Power Station | Collinsville, AL | 30.6 GWh | 47.5 mi |
Sequoyah | Soddy Daisy, TN | 16.6 TWh | 33.8 mi |
SR Bell Buckle | Shelbyville, TN | 63.0 GWh | 61.5 mi |
TAI Huntsville Solar Hybrid | Huntsville, AL | 18.4 GWh | 58.4 mi |
Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh | 44.7 mi |
Tims Ford | Winchester, TN | 41.7 GWh | 39.5 mi |
Volkswagen Solar System | Chattanooga, TN | 11.5 GWh | 28.8 mi |
Weiss Dam | Leesburg, AL | 183.2 GWh | 57.8 mi |