Nexamp Peak CSG
297 Brodie Mountain Road, Hancock, MA 1237Plant Summary Information
Nexamp Peak CSG is ranked #378 out of 487 solar farms in Massachusetts in terms of total annual net electricity generation.
Nexamp Peak CSG generated 307.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Nexamp Peak CSG |
---|---|
Utility Name | Nexamp Peak, LLC |
Location | Berkshire County, MA |
Initial Operation Date | December 2015 |
Last Update | Dec 2023 |
Annual Generation | 2.1 GWh |
Annual Consumption | 7.4 k MMBtu |
Ranked #9,796 out of 11,835 Power Plants Nationwide | |
Ranked #4,543 out of 5,643 Solar Power Plants Nationwide | |
Ranked #471 out of 598 Massachusetts Power Plants | |
Ranked #378 out of 487 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Nexamp Peak CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nexamp Peak CSG.
Monthly Net Generation for Nexamp Peak CSG
Nexamp Peak CSG Details
Summary Information | |
---|---|
Plant Name | Nexamp Peak CSG (60879) |
Plant Address | 297 Brodie Mountain Road, Hancock, MA 1237 |
Utility | Nexamp Peak, LLC (60530) |
Latitude, Longitude | 42.56209, -73.28707 |
Generation Dates on File | Jan 2016 to Dec 2023 |
Initial Operation Date | December 2015 |
Annual Generation | 2.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator 02731 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 202 |
Tilt Angle | 22 |
DC Net Capacity | 2.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.7 MW |
Nexamp Peak CSG Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4533 | Huneke CSG 2, LLC | Zumbrota, MN | 2.1 GWh |
#4534 | Novel Benedix Solar CSG | Mantorville, MN | 2.1 GWh |
#4535 | POM Plant 1 | Del Rey, CA | 2.1 GWh |
#4536 | Plato CSG1, LLC | Glencoe, MN | 2.1 GWh |
#4537 | Square Barn Solar | Algonquin, IL | 2.1 GWh |
#4538 | Cogenra - TEP | Tucson, AZ | 2.1 GWh |
#4539 | Hayfield Solar III LLC CSG | Hayfield, MN | 2.1 GWh |
#4540 | Union Vale | Lagrangeville, NY | 2.1 GWh |
#4541 | West Valley East | West Valley, NY | 2.1 GWh |
#4542 | Sue Cleveland High School | Rio Rancho, NM | 2.1 GWh |
#4544 | CU Solar Plant | Cedarville, OH | 2.1 GWh |
#4545 | Sacramento (SMUD) | Sacramento, CA | 2.1 GWh |
#4546 | IGS Solar I - BWI5 | Baltimore, MD | 2.1 GWh |
#4547 | USS KVPV Solar LLC CSG | Fulton, MN | 2.1 GWh |
#4548 | AES Pelletier Solar, LLC | Fort Kent, ME | 2.1 GWh |
#4549 | Bloomfield Municipal Utilities Solar | Bloomfield, IA | 2.1 GWh |
#4550 | Grossmont HS Solar Project | El Cajon, CA | 2.1 GWh |
#4551 | Jack's Solar Garden | Longmont, CO | 2.1 GWh |
#4552 | Fresno Hoover High School Hybrid | Fresno, CA | 2.1 GWh |
#4553 | Novel Martens Solar LLC(CSG) | Lafayette, MN | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nexamp Peak CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Berkshire Wind Power Project | Lanesboro, MA | 31.6 GWh | 1.8 mi |
East Acres Solar NG, LLC | Pittsfield, MA | 4.8 GWh | 5.6 mi |
Fife Brook | Florida, MA | 33.4 GWh | 17.9 mi |
Harbor Road Solar 1 | Cheshire, MA | 2.8 GWh | 8.2 mi |
Hinsdale Solar PV | Hinsdale, MA | 2.9 GWh | 12.3 mi |
Jiminy Peak Wind QF | Hancock, MA | 1.0 MWh | 1.3 mi |
Lee Site 31 Solar | Lee, MA | 2.3 GWh | 18.6 mi |
New England Wind LLC | Florida, MA | 62.1 GWh | 17.7 mi |
North Adams Landfill | North Adams, MA | 3.4 GWh | 12.4 mi |
Pittsfield 44 - M&W PV | Pittsfield, MA | 1.5 GWh | 6.3 mi |
Pittsfield Generating LP | Pittsfield, MA | 33.7 GWh | 8.1 mi |
Savoy Solar PV | Savoy, MA | 3.1 GWh | 12.1 mi |
Silver Lake Solar Photovoltaic Facility | Pittsfield, MA | 1.4 GWh | 7.9 mi |
SVEP Solar Project Company | Pownal, VT | 1.9 GWh | 13.6 mi |
Syncarpha Hancock I CSG | Hancock, MA | 2.9 GWh | 9.3 mi |
Syncarpha Hancock II CSG | Hancock, MA | 3.1 GWh | 9.8 mi |
Syncarpha Hancock III CSG | Pittsfield, MA | 1.5 GWh | 9.5 mi |
Truck Stop | West Stockridge, MA | 3.2 GWh | 16.3 mi |
Waste Water Treatment Plant | Pittsfield, MA | 763.0 MWh | 10.8 mi |
Williams College - Campus CHP | Williamstown, MA | 2.0 GWh | 11.1 mi |