Newport Solar Project
660 County Road 42, Newport, AR 72112Plant Summary Information
Newport Solar Project is ranked #19 out of 76 power plants in Arkansas in terms of total annual net electricity generation.
Newport Solar Project generated 106.1 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Newport Solar Project |
---|---|
Utility Name | Newport Solar, LLC |
Location | Jackson County, AR |
Initial Operation Date | October 2023 |
Last Update | Sep 2024 |
Annual Generation | 328.2 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,742 out of 11,852 Power Plants Nationwide | |
Ranked #140 out of 5,655 Solar Power Plants Nationwide | |
Ranked #19 out of 76 Arkansas Power Plants | |
Ranked #2 out of 30 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Newport Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Newport Solar Project.
Monthly Net Generation for Newport Solar Project
Newport Solar Project Details
Summary Information | |
---|---|
Plant Name | Newport Solar Project (66112) |
Plant Address | 660 County Road 42, Newport, AR 72112 |
Utility | Newport Solar, LLC (65276) |
Latitude, Longitude | 35.6689, -91.18711 |
Generation Dates on File | Aug 2023 to Sep 2024 |
Initial Operation Date | October 2023 |
Annual Generation | 328.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator U1 Details Operating October 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Summer Capacity | 180 MW |
Winter Capacity | 66 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 60 |
DC Net Capacity | 231.7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 231. MW |
Newport Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#130 | Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh |
#131 | Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh |
#132 | Bernard Creek Solar | Hungerford, TX | 347.8 GWh |
#133 | Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh |
#134 | Big Cypress Solar, LLC | Crawfordsville, AR | 342.9 GWh |
#135 | Edwards Sanborn E1A | Mojave, CA | 325.8 GWh |
#136 | Blythe Solar II, LLC | Blythe, CA | 331.9 GWh |
#137 | Big River Solar | Norris City, IL | 334.0 GWh |
#138 | Quitman Solar | Quitman, GA | 330.2 GWh |
#139 | Campo Verde Solar | El Centro, CA | 328.6 GWh |
#141 | CA Flats Solar 150, LLC | Shandon, CA | 327.6 GWh |
#142 | Sparta Solar | Pawnee, TX | 325.6 GWh |
#143 | American Kings Solar, LLC | Lemoore, CA | 325.3 GWh |
#144 | Umbriel Solar | Livington, TX | 320.8 GWh |
#145 | Ganado Solar | Gail, TX | 316.8 GWh |
#146 | Tres Bahias | Port Lavaca, TX | 319.3 GWh |
#147 | Fort Powhatan Solar | Disputanta, VA | 318.0 GWh |
#148 | Chestnut | Lemoore, CA | 322.2 GWh |
#149 | Cove Mountain Solar 2 | Beryl, UT | 316.9 GWh |
#150 | Fighting Jays Solar Project | Needville, TX | 316.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Newport Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Cypress Solar, LLC | Crawfordsville, AR | 342.9 GWh | 54.3 mi |
Clay County Electrical Cooperative | Corning, AR | 2.3 GWh | 60.1 mi |
Craighead Electric Solar One | Brookland, AR | 2.3 GWh | 38.9 mi |
Dell Power Station | Dell, AR | 4.1 TWh | 66.5 mi |
Farmers Electric Cooperative | Newport, AR | 2.2 GWh | 3.7 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh | 48.6 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 52.3 mi |
Greers Ferry Lake | Heber Springs, AR | 209.7 GWh | 46.5 mi |
Happy Solar 1 | Searcy, AR | 195.7 GWh | 43.7 mi |
Independence Steam Electric Station | Newark, AR | 5.6 TWh | 12.5 mi |
Jonesboro City Water & Light Plant | Jonesboro, AR | 84.7 GWh | 28.7 mi |
Norfork | Salesville, AR | 210.2 GWh | 71.2 mi |
Paragould Reciprocating | Paragould, AR | 649.0 MWh | 45.2 mi |
Paragould Solar Farm | Paragould, AR | 3.3 GWh | 46.3 mi |
Paragould Turbine | Paragould, AR | 161.0 MWh | 45.2 mi |
Plum Point Energy Station | Osceola, AR | 3.0 TWh | 69.5 mi |
Searcy Solar Hybrid | Searcy, AR | 204.2 GWh | 41.3 mi |
White River Lock and Dam 1 | Batesville, AR | 15.2 GWh | 26 mi |
White River Lock and Dam 2 | Locust Grove, AR | 15.2 GWh | 32.9 mi |
White River Lock and Dam 3 | Marcella, AR | 30.4 GWh | 39.1 mi |