Newark Energy Center
955 Delancy St., Newark, NJ 7105Plant Summary Information
Newark Energy Center is ranked #6 out of 344 power plants in New Jersey in terms of total annual net electricity generation.
Newark Energy Center is comprised of 3 generators and generated 980.2 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Newark Energy Center |
---|---|
Utility Name | Newark Energy Center, LLC |
Location | Essex County, NJ |
Initial Operation Date | September 2015 |
Last Update | Mar 2024 |
Annual Generation | 4.3 TWh |
Annual Consumption | 30.1 M MMBtu |
Ranked #280 out of 11,249 Power Plants Nationwide | |
Ranked #152 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 344 New Jersey Power Plants | |
Ranked #4 out of 55 New Jersey Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Hess NEC, LLC (2013 to 2013) Newark Energy Center, LLC (2014 to 2022) |
Map of Newark Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Newark Energy Center.
Monthly Net Generation for Newark Energy Center
Newark Energy Center Details
Summary Information | |
---|---|
Plant Name | Newark Energy Center (58079) |
Plant Address | 955 Delancy St. Newark, NJ 7105 |
Utility | Newark Energy Center, LLC (57457) |
Latitude, Longitude | 40.70722, -74.12583 |
Generation Dates on File | Sep 2015 to Mar 2024 |
Initial Operation Date | September 2015 |
Annual Generation | 4.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Passaic Valley Sewer Commrs. |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
Natural Gas Storage | No |
Generator GT-1 Details Operating September 2015
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCST |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | NEWARKEC18KV |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NEWARKEC18KV |
Nameplate Capacity | 225 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 209.3 MW |
Winter Capacity | 231 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT-2 Details Operating September 2015
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCST |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | NEWARKEC18KV |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NEWARKEC18KV |
Nameplate Capacity | 225 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 210.4 MW |
Winter Capacity | 231 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG-1 Details Operating September 2015
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCST |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
RTO ISO LMP Node Designation | NEWARKEC18KV |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NEWARKEC18KV |
Nameplate Capacity | 285 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 285.3 MW |
Winter Capacity | 287.5 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Newark Energy Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Energy Investment Fund | 1 Penn Plaza, New York, NY 10119 | Generator GT-1 | 100.00% |
Energy Investment Fund | 1 Penn Plaza, New York, NY 10119 | Generator GT-2 | 100.00% |
Energy Investment Fund | 1 Penn Plaza, New York, NY 10119 | Generator STG-1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Cane Island | Intercession City, FL | 4.5 TWh |
#143 | High Desert Power Plant | Victorville, CA | 4.5 TWh |
#144 | Dearborn Industrial Generation | Dearborn, MI | 5.9 TWh |
#145 | Tenaska Frontier Generation Station | Shiro, TX | 4.5 TWh |
#146 | Pastoria Energy Facility, LLC | Lebec, CA | 4.4 TWh |
#147 | Dresden Energy Facility | Dresden, OH | 4.4 TWh |
#148 | Woodbridge Energy Center | Keasbey, NJ | 4.3 TWh |
#149 | Green Country Energy LLC | Jenks, OK | 4.3 TWh |
#150 | Astoria Energy II | Astoria, NY | 4.3 TWh |
#151 | Liberty Electric Power Plant | Eddystone, PA | 4.3 TWh |
#153 | Hermiston Power Partnership | Hermiston, OR | 4.3 TWh |
#154 | Wildcat Point Generation Facility | Conowingo, MD | 4.3 TWh |
#155 | L V Sutton Combined Cycle | Wilmington, NC | 4.3 TWh |
#156 | CPV St Charles Energy Center | Waldorf, MD | 4.3 TWh |
#157 | Magnet Cove | Malvern, AR | 4.2 TWh |
#158 | Long Ridge Energy Generation | Hannibal, OH | 4.2 TWh |
#159 | Bethlehem Energy Center | Glenmont, NY | 4.2 TWh |
#160 | Lansing Smith | Southport, FL | 4.2 TWh |
#161 | Hobbs Generating Station | Hobbs, NM | 4.2 TWh |
#162 | Tracy | Sparks, NV | 4.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Newark Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
435A Bergen Avenue | Kearney, NJ | 2.4 GWh | 3.1 mi |
601 Doremus CDG | Newark, NJ | 2.5 GWh | 1.7 mi |
77 Metro Way | Secaucus, NJ | 1.7 GWh | 5.2 mi |
Allied Beverages Elizabeth | Elizabeth, NJ | 5.9 GWh | 3.9 mi |
Bayonne Energy Center | Bayonne, NJ | 745.1 GWh | 4.2 mi |
Community Foodbank of NJ | Hillside, NJ | 921.9 MWh | 4.6 mi |
Covanta Essex Company | Newark, NJ | 518.7 GWh | 2.1 mi |
Essex County Correctional Facility Cogen | Newark, NJ | 28.6 GWh | 0.9 mi |
Goya Foods, Inc- Jersey City Solar | Jersey City, NJ | 3.3 GWh | 4.8 mi |
Hudson County Solar | Kearny, NJ | 1.0 GWh | 1.7 mi |
Jersey City DWP | Jersey City, NJ | 1.4 GWh | 2.3 mi |
Jersey Gardens Phase 1 | Elizabeth, NJ | 3.9 GWh | 4.1 mi |
Jersey Gardens Phase 2 | Elizabeth, NJ | 3.5 GWh | 4.1 mi |
NJMC Landfill | Kearny, NJ | 4.2 GWh | 3.1 mi |
Port Richmond WWT Solar | Staten Island, NY | 1.6 GWh | 4.8 mi |
PSEG Kearny Generating Station | Kearny, NJ | 245.4 GWh | 2.6 mi |
River Terminal Development Solar | Kearny, NJ | 3.8 GWh | 1.5 mi |
Royal Wine Corp Solar Power Plant | Bayonne, NJ | 1.4 GWh | 3.3 mi |
Rutgers Biomedical and Health Cogen | Newark, NJ | 27.8 GWh | 3.9 mi |
WEA Texas Bayonne | Bayonne, NJ | 2.3 GWh | 2.7 mi |