New Lisbon
218 East Bridge Street, New Lisbon, WI 53950Plant Summary Information
New Lisbon is ranked #15 out of 29 distillate fuel oil power plants in Wisconsin in terms of total annual net electricity generation.
New Lisbon is comprised of 4 generators and generated 13.8 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | New Lisbon |
---|---|
Utility Name | City of New Lisbon |
Location | Juneau County, WI |
Initial Operation Date | January 1966 |
Last Update | Dec 2023 |
Annual Generation | 50.0 MWh |
Annual Consumption | 588 MMBtu |
Ranked #11,563 out of 11,852 Power Plants Nationwide | |
Ranked #898 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #204 out of 216 Wisconsin Power Plants | |
Ranked #15 out of 29 Wisconsin Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of New Lisbon
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for New Lisbon.
Monthly Net Generation for New Lisbon
New Lisbon Details
Summary Information | |
---|---|
Plant Name | New Lisbon (4130) |
Plant Address | 218 East Bridge Street, New Lisbon, WI 53950 |
Utility | City of New Lisbon (13466) |
Latitude, Longitude | 43.8797, -90.1645 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1966 |
Annual Generation | 50.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City of New Lisbon (13466) WI |
Grid Voltage | 416.00 kV |
Energy Storage | No |
Generator 2 Details Operating January 1966
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1966 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 5 Details Operating January 1977
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1977 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 6 Details Operating July 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 7 Details Operating July 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
New Lisbon Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#888 | A B Brown | Mount Vernon, IN | 102.6 GWh |
#889 | Bellevue | Bellevue, IA | 52.0 MWh |
#890 | Southwestern Bell Telephone | St. Louis, MO | 52.0 MWh |
#891 | Thomson Reuters Data Center Bldg H | Eagan, MN | 52.0 MWh |
#892 | NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 48.1 GWh |
#893 | Poplar Bluff Generating Station | Poplar Bluff, MO | 579.0 MWh |
#894 | NYC-HH - CONEY ISLAND HOSPITAL | Brooklyn, NY | 50.0 MWh |
#895 | Detroit Lakes | Detroit Lakes, MN | 50.0 MWh |
#896 | Painesville | Painesville, OH | 749.0 MWh |
#897 | Chester Generating Station | Chester, PA | 50.0 MWh |
#899 | Baconton Power Plant | Baconton, GA | 36.2 GWh |
#900 | Melrose | Melrose, MN | 49.0 MWh |
#901 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.5 GWh |
#902 | Cedar Hills | Maple Valley, WA | 454.0 MWh |
#903 | Coit GT | Columbia, SC | 400.0 MWh |
#904 | Durant | Durant, IA | 48.0 MWh |
#905 | Newhalen | Iliamna, AK | 3.2 GWh |
#906 | Kindred School | Kindred, ND | 48.0 MWh |
#907 | Fordham University | Bronx, NY | 48.0 MWh |
#908 | Wells IC | Wells, MN | 128.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding New Lisbon.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cashton | Cashton, WI | 15.0 MWh | 32.1 mi |
Cashton Greens Wind Farm | Cashton, WI | 10.0 GWh | 33.5 mi |
Cashton Solar | Cashton, WI | 3.0 GWh | 33.4 mi |
Castle Rock | Adams, WI | 75.6 GWh | 10.7 mi |
Elroy | Elroy, WI | 1.0 MWh | 11 mi |
Elroy Solar | Mauston, WI | 1.9 GWh | 12.4 mi |
Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 177.0 GWh | 32.8 mi |
Kilbourn | Wisconsin Dells, WI | 54.0 GWh | 26 mi |
La Farge | La Farge, WI | 14.0 MWh | 31.8 mi |
Lemonweir (Oak 1) | Mauston, WI | 30.0 MWh | 12.4 mi |
New Lisbon Solar | New Lisbon, WI | 3.9 GWh | 1.4 mi |
Petenwell | Necedah, WI | 95.5 GWh | 14.2 mi |
Port Edwards Mill | Port Edwards, WI | 37.8 GWh | 34.8 mi |
Sauk DPC Solar | Wonewoc, WI | 1.5 GWh | 21.1 mi |
Shamrock Solar LLC | Black River Falls, WI | 6.0 GWh | 39.6 mi |
Viola | Viola, WI | 4.0 MWh | 36 mi |
Webster Creek (Oak 2) | New Lisbon, WI | 14.0 MWh | 1.2 mi |
Whistling Winds DPC Solar | New Lisbon, WI | 2.8 GWh | 7.9 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 41.3 GWh | 39.3 mi |
Wood County | Nekoosa, WI | 271.6 GWh | 31.8 mi |