2713 Hogan Dam Road, Valley Springs, CA 95252Plant Summary Information
New Hogan Power Plant is ranked #156 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
New Hogan Power Plant is comprised of 2 generators and generated 1.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | New Hogan Power Plant |
---|---|
Utility Name | Modesto Irrigation District |
Location | Calaveras County, CA |
Initial Operation Date | April 1989 |
Last Update | Dec 2023 |
Annual Generation | 10.8 GWh |
Annual Consumption | 38.4 k MMBtu |
Ranked #5,787 out of 11,852 Power Plants Nationwide | |
Ranked #943 out of 1,371 Water Power Plants Nationwide | |
Ranked #829 out of 1,570 California Power Plants | |
Ranked #156 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of New Hogan Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for New Hogan Power Plant.
Monthly Net Generation for New Hogan Power Plant
New Hogan Power Plant Details
Summary Information | |
---|---|
Plant Name | New Hogan Power Plant (50755) |
Plant Address | 2713 Hogan Dam Road, Valley Springs, CA 95252 |
Utility | Modesto Irrigation District (12745) |
Latitude, Longitude | 38.14958, -120.81494 |
Generation Dates on File | Jan 2003 to Dec 2023 |
Initial Operation Date | April 1989 |
Annual Generation | 10.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 85-28-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | New Hogan Reservoir |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating April 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GEN2 Details Operating April 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
New Hogan Power Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Calaveras County Water Dist | P O Box 846427 East St Charles Street, San Andreas, CA 95246 | Generator GEN1 | 100.00% |
Calaveras County Water Dist | P O Box 846427 East St Charles Street, San Andreas, CA 95246 | Generator GEN2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#933 | Elkhart | Elkhart, IN | 11.1 GWh |
#934 | Lake Mendocino | Ukiah, CA | 11.1 GWh |
#935 | Ashokan | Kingston, NY | 11.0 GWh |
#936 | Slate Creek | Lakehead, CA | 11.0 GWh |
#937 | Turner Shoals | Mill Springs, NC | 11.0 GWh |
#938 | Flint Creek Hydroelectric LLC | Philipsburg, MT | 11.0 GWh |
#939 | Juniper Ridge Hydroelectric Project | Bend, OR | 10.9 GWh |
#940 | Phoenix Hydro Project | Phoenix, NY | 10.9 GWh |
#941 | Brainerd Public Utilities | Brainerd, MN | 10.9 GWh |
#942 | Gross Hydro Plant | Boulder, CO | 10.8 GWh |
#944 | Shavano Falls Hydro | Montrose, CO | 10.8 GWh |
#945 | Indian Orchard | Indian Orchard, MA | 10.6 GWh |
#946 | Boulder Canyon Hydro | Boulder, CO | 10.6 GWh |
#947 | Big Creek Water Works | Hyampom, CA | 10.6 GWh |
#948 | Whitman | Ketchikan, AK | 10.6 GWh |
#949 | Mill Creek 3 | Mill Creek, CA | 10.5 GWh |
#950 | Mink Creek Hydro | Preston, ID | 10.5 GWh |
#951 | Cobble Mountain | Granville, MA | 10.5 GWh |
#952 | Dietrich Drop | Shoshone, ID | 10.5 GWh |
#953 | Pittsford | Pittsford, VT | 10.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding New Hogan Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco San Joaquin | Linden, CA | 30.9 GWh | 10.4 mi |
Angels | Angels Camp, CA | 7.2 GWh | 15.9 mi |
Bear Creek Solar | Lodi, CA | 3.9 GWh | 18.2 mi |
Camanche | Clements & Wallace, CA | 58.1 GWh | 12.6 mi |
Collierville Powerhouse | Murphys, CA | 531.8 GWh | 23.6 mi |
Cosumnes | Herald, CA | 3.8 TWh | 21.2 mi |
Electra | Jackson, CA | 337.8 GWh | 14.8 mi |
Foothill Sanitary Landfill - Solar Array | Linden, CA | 8.2 GWh | 9.8 mi |
Frankenheimer Power Plant | Oakdale, CA | 3.3 GWh | 22.1 mi |
Kettleman Solar Project | Lodi, CA | 2.7 GWh | 17.8 mi |
Murphys | Murphys, CA | 17.8 GWh | 20 mi |
New Melones | Jamestown, CA | 511.1 GWh | 21 mi |
Pardee | Valley Springs, CA | 181.6 GWh | 7.7 mi |
Rancho Seco Solar II, LLC | Twin Cities, CA | 266.9 GWh | 21.4 mi |
Rancho Seco Solar, LLC | Herald, CA | 13.3 GWh | 20.9 mi |
Robert O Schulz Solar Farm | Oakdale, CA | 1.7 GWh | 20.6 mi |
Sonora 1 | Jamestown, CA | 2.7 GWh | 23.8 mi |
Stanislaus | Vallecito, CA | 334.5 GWh | 24.2 mi |
Tulloch | Jamestown, CA | 124.9 GWh | 22.1 mi |
West Point PH | Pioneer, CA | 81.9 GWh | 23.6 mi |