New Bern
7420 Old US 70 West, New Bern, NC 28562Plant Summary Information
New Bern is ranked #4 out of 18 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
New Bern is comprised of 18 generators and generated 7.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | New Bern |
---|---|
Utility Name | Industrial Power Generating Company LLC |
Location | Craven County, NC |
Initial Operation Date | August 2007 |
Last Update | Dec 2023 |
Annual Generation | 28.1 GWh |
Annual Consumption | 329.1 k MMBtu |
Ranked #4,633 out of 11,852 Power Plants Nationwide | |
Ranked #109 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #135 out of 863 North Carolina Power Plants | |
Ranked #4 out of 18 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas : 93.8% Distillate Fuel Oil : 6.2% |
Map of New Bern
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for New Bern.
Monthly Net Generation for New Bern
New Bern Details
Summary Information | |
---|---|
Plant Name | New Bern (56688) |
Plant Address | 7420 Old US 70 West, New Bern, NC 28562 |
Utility | Industrial Power Generating Company LLC (55938) |
Latitude, Longitude | 35.1681, -77.2267 |
Generation Dates on File | Aug 2007 to Dec 2023 |
Initial Operation Date | August 2007 |
Annual Generation | 28.1 GWh |
Fuel Types | Landfill Gas : 93.8% Distillate Fuel Oil : 6.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator 1 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 10 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 11 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 12 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 2 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 3 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 4 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 5 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 6 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 7 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 8 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 9 Details Operating August 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 13 Details Operating May 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 14 Details Operating May 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 15 Details Operating May 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 16 Details Operating May 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 17 Details Operating May 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 18 Details Operating May 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
New Bern Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#99 | Bavarian LFGTE | Walton, KY | 27.9 GWh |
#100 | Sarasota County LFGTE Facility | Nokomis, FL | 27.8 GWh |
#101 | Ameresco Dallas LLC | Dallas, TX | 27.8 GWh |
#102 | Riverbend Landfill | McMinnville, OR | 27.7 GWh |
#103 | Richmond Energy | Henrico, VA | 27.3 GWh |
#104 | Lennon Generating | Lennon, MI | 27.3 GWh |
#105 | Brown County LFGTE Power Station | Georgetown, OH | 27.0 GWh |
#106 | Liberty I & II LFGTE | Monticello, IN | 26.7 GWh |
#107 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh |
#108 | MM Lopez Energy | Lake View Terrace, CA | 26.4 GWh |
#110 | Oneida Herkimer | Boonville, NY | 26.3 GWh |
#111 | Nanticoke LFG | Binghamton, NY | 26.1 GWh |
#112 | Greene Valley Gas Recovery | Naperville, IL | 26.1 GWh |
#113 | Apple Campus 2 Fuel Cell | Cupertino, CA | 25.9 GWh |
#114 | Salem Energy Systems LLC | Winston-Salem, NC | 25.9 GWh |
#115 | Mountain View | Greencastle, PA | 27.0 GWh |
#116 | Earthmovers LFGTE | Elkhart, IN | 25.5 GWh |
#117 | Archbald Power Station | Archbald, PA | 114.0 GWh |
#118 | Iredell County LFG Facility | Statesville, NC | 25.2 GWh |
#119 | Trail Ridge Landfill Gas Recovery | Baldwin, FL | 25.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding New Bern.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Andrew Solar | New Bern, NC | 9.1 GWh | 6.6 mi |
Bondi Solar | Kinston, NC | 9.6 GWh | 17.8 mi |
Buckleberry Solar | Grifton, NC | 95.2 GWh | 17.8 mi |
Craven County Wood Energy LP | New Bern, NC | 263.9 GWh | 4.2 mi |
Daystar Solar | Pollocksville, NC | 9.4 GWh | 9.3 mi |
Grove Solar | New Bern, NC | 13.2 GWh | 6.1 mi |
Highland Solar Center LLC | Grifton, NC | 7.5 GWh | 18.6 mi |
Hood Farm Solar, LLC | Trenton, NC | 8.8 GWh | 15.5 mi |
International Paper Co. - New Bern Mill | New Bern, NC | 197.8 GWh | 7 mi |
Lang Solar Farm | La Grange, NC | 9.3 GWh | 15.7 mi |
New Bern Farm | Ernul, NC | 8.3 GWh | 10 mi |
Pecan Grove Solar, LLC | New Bern, NC | 8.4 GWh | 7.3 mi |
Plott Hound Solar | New Bern, NC | 7.4 GWh | 7.9 mi |
Pollocksville Solar | Pollocksville, NC | 9.0 GWh | 11.8 mi |
Porter Solar | New Bern, NC | 8.3 GWh | 9.2 mi |
Sweet Tea Solar, LLC | New Bern, NC | 6.2 GWh | 5.3 mi |
Trent River Farm | New Bern, NC | 8.3 GWh | 7.8 mi |
Trent River Solar, LLC | Pollocksville, NC | 141.3 GWh | 12.3 mi |
TWE New Bern Solar Project, LLC | New Bern, NC | 6.1 GWh | 5.3 mi |
Wyse Fork Solar Farm, LLC | Dover, NC | 3.5 GWh | 15.9 mi |