Nevada Solar One
602 Eldorado Valley Dr, Boulder City, NV 89005Plant Summary Information
Nevada Solar One is ranked #27 out of 54 solar farms in Nevada in terms of total annual net electricity generation.
Nevada Solar One generated 11.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Nevada Solar One |
---|---|
Utility Name | Acciona Solar Power |
Location | Clark County, NV |
Initial Operation Date | June 2007 |
Last Update | Mar 2024 |
Annual Generation | 98.0 GWh |
Annual Consumption | 352.8 k MMBtu |
Ranked #3,155 out of 11,249 Power Plants Nationwide | |
Ranked #530 out of 5,158 Solar Power Plants Nationwide | |
Ranked #61 out of 104 Nevada Power Plants | |
Ranked #27 out of 54 Nevada Solar Power Plants | |
Fuel Types | Solar : 98.1% Natural Gas : 1.9% |
Map of Nevada Solar One
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nevada Solar One.
Monthly Net Generation for Nevada Solar One
Nevada Solar One Details
Summary Information | |
---|---|
Plant Name | Nevada Solar One (56405) |
Plant Address | 602 Eldorado Valley Dr Boulder City, NV 89005 |
Utility | Acciona Solar Power (55744) |
Latitude, Longitude | 35.7998, -114.98173 |
Generation Dates on File | Jun 2007 to Mar 2024 |
Initial Operation Date | June 2007 |
Annual Generation | 98.0 GWh |
Fuel Types | Solar : 98.1% Natural Gas : 1.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 07-19-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Boulder City |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | SOUTHWEST GAS CORPORATION |
Natural Gas Storage | No |
Generator ONE Details Operating June 2007
Technology | Solar Thermal without Energy Storage |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 75.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 68.5 MW |
Winter Capacity | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar / Natural Gas |
Startup Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Parabolic Trough | Yes |
Nevada Solar One Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#520 | Beacon Solar Plant Site 5 | Cantil, CA | 100.9 GWh |
#521 | Peace Creek Solar | Bartow, FL | 100.3 GWh |
#522 | Moody Air Force Base Solar | Valdosta, GA | 99.9 GWh |
#523 | Highest Power Solar, LLC | Louisburg, NC | 99.3 GWh |
#524 | Prineville Solar Energy LLC | Prineville, OR | 99.2 GWh |
#525 | River Ferry Solar 1 | West Union, IL | 99.0 GWh |
#526 | Hazlehurst II | Hazlehurst, GA | 98.4 GWh |
#527 | Pike Solar Hybrid | Fountain, CO | 97.0 GWh |
#528 | Manatee Solar Energy Center | Parrish, FL | 66.2 GWh |
#529 | ID Solar | Kuna, ID | 96.3 GWh |
#531 | Lake Hancock Solar | Bartow, FL | 95.9 GWh |
#532 | Fox Creek Solar | Louisburg, NC | 95.9 GWh |
#533 | OCI Alamo Solar I Hybrid | San Antonio, TX | 95.5 GWh |
#534 | Galloway 2 Solar Farm | Paint Rock, TX | 95.5 GWh |
#535 | Sanford Solar | Sanford, ME | 95.4 GWh |
#536 | SR McKellar | Denmark, TN | 95.3 GWh |
#537 | Waipio Solar | Waipio, HI | 94.4 GWh |
#538 | Bell Ridge Solar | Trenton, FL | 94.1 GWh |
#539 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 92.4 GWh |
#540 | Hattiesburg Solar Farm | Hattiesburg, MS | 91.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nevada Solar One.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 135.6 GWh | 4.1 mi |
Clark (NVE) | Las Vegas, NV | 643.7 GWh | 20.2 mi |
CM10 | Boulder City, NV | 19.8 GWh | 1 mi |
CM48 | Boulder City, NV | 102.4 GWh | 1.4 mi |
Copper Mountain Solar 2 | Boulder City, NV | 381.0 GWh | 1.4 mi |
Copper Mountain Solar 3 | Boulder City, NV | 647.5 GWh | 6.3 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 249.7 GWh | 1.3 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 721.6 GWh | 1.7 mi |
Desert Star Energy Center | Boulder City, NV | 1.9 TWh | 1 mi |
Dignity - Siena Campus | Henderson, NV | 3.0 GWh | 16 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.6 TWh | 20.2 mi |
Hoover Dam (NV) | Boulder City, NV | 1.3 TWh | 20.2 mi |
River Mountains Solar | Henderson, NV | 24.6 GWh | 16.3 mi |
Saguaro Power | Henderson, NV | 209.1 GWh | 16.8 mi |
Techren Solar I LLC | Boulder, NV | 208.9 GWh | 3.6 mi |
Techren Solar II LLC | Boulder, NV | 574.3 GWh | 4.9 mi |
Techren Solar III LLC | Boulder, NV | 60.4 GWh | 3.1 mi |
Techren Solar IV LLC | Boulder, NV | 64.7 GWh | 6.9 mi |
Techren Solar V | Boulder, NV | 131.7 GWh | 7.6 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 455.1 GWh | 11 mi |