Nevada Cogen Associates 2 Black Mountain
East Lake Mead Blvd, Las Vegas, NV 89124Plant Summary Information
Nevada Cogen Associates 2 Black Mountain is ranked #24 out of 109 power plants in Nevada in terms of total annual net electricity generation.
Nevada Cogen Associates 2 Black Mountain is comprised of 4 generators and generated 165.6 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Nevada Cogen Associates 2 Black Mountain |
---|---|
Utility Name | Nevada Cogeneration Assoc # 2 |
Location | Clark County, NV |
Initial Operation Date | November 1992 |
Last Update | Oct 2024 |
Annual Generation | 499.2 GWh |
Annual Consumption | 4.5 M MMBtu |
Ranked #1,295 out of 11,866 Power Plants Nationwide | |
Ranked #563 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #24 out of 109 Nevada Power Plants | |
Ranked #10 out of 17 Nevada Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Nevada Cogen Associates 2 Black Mountain
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nevada Cogen Associates 2 Black Mountain.
Monthly Net Generation for Nevada Cogen Associates 2 Black Mountain
Nevada Cogen Associates 2 Black Mountain Details
Summary Information | |
---|---|
Plant Name | Nevada Cogen Associates 2 Black Mountain (54349) |
Plant Address | East Lake Mead Blvd, Las Vegas, NV 89124 |
Utility | Nevada Cogeneration Assoc # 2 (13365) |
Latitude, Longitude | 36.2253, -114.8783 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | November 1992 |
Annual Generation | 499.2 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 90-68-006 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Well |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | SOUTHWEST GAS CORPORATION |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GTA Details Operating November 1992
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 22.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21.7 MW |
Winter Capacity | 21.7 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1992 |
Planned Retirement | October 2030 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTB Details Operating December 1992
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 22.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21.7 MW |
Winter Capacity | 21.7 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1992 |
Planned Retirement | October 2030 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTC Details Operating December 1992
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 22.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21.7 MW |
Winter Capacity | 21.7 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1992 |
Planned Retirement | October 2030 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STM Details Operating December 1992
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STG1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 29.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1992 |
---|---|
Planned Retirement | October 2030 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Nevada Cogen Associates 2 Black Mountain Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Panwest NCA2 Holdings LLC | 473 Jackson St, San Francisco, CA 94111 | Generator GTA | 100.00% |
Panwest NCA2 Holdings LLC | 473 Jackson St, San Francisco, CA 94111 | Generator GTB | 100.00% |
Panwest NCA2 Holdings LLC | 473 Jackson St, San Francisco, CA 94111 | Generator GTC | 100.00% |
Panwest NCA2 Holdings LLC | 473 Jackson St, San Francisco, CA 94111 | Generator STM | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#553 | Shute Creek Facility | Kemmerer, WY | 844.2 GWh |
#554 | Talbot County Energy | Box Springs, GA | 521.8 GWh |
#555 | Kennedy International Airport Cogen | Jamaica, NY | 521.7 GWh |
#556 | Fort Churchill | Yerington, NV | 514.3 GWh |
#557 | Indeck Corinth Energy Center | Corinth, NY | 514.1 GWh |
#558 | General Electric Plastic | Burkeville, AL | 514.1 GWh |
#559 | Comanche (OK) | Lawton, OK | 511.9 GWh |
#560 | Wabash Valley Power IGCC | Terre Haute, IN | 509.6 GWh |
#561 | Broad River Energy Center | Gaffney, SC | 508.9 GWh |
#562 | Geismar Cogen | Geismar, LA | 503.8 GWh |
#564 | Sentinel Energy Center, LLC | Desert Hot Springs, CA | 498.9 GWh |
#565 | Oxnard | Oxnard, CA | 496.5 GWh |
#566 | F.D. Kuester Generating Station | Negaunee, MI | 490.5 GWh |
#567 | Lawrence Energy Center | Lawrence, KS | 1.4 TWh |
#568 | Dave Gates Generating Station | Anaconda, MT | 492.2 GWh |
#569 | South Belridge Cogeneration Facility | McKittrick, CA | 485.1 GWh |
#570 | Roseville Energy Park | Roseville, CA | 481.3 GWh |
#571 | Bayonne Energy Center | Bayonne, NJ | 477.8 GWh |
#572 | Knox Lee | Longview, TX | 476.6 GWh |
#573 | Sundance | Casa Grande, AZ | 472.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nevada Cogen Associates 2 Black Mountain.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Generating Station | Las Vegas, NV | 2.3 TWh | 14 mi |
Apex Solar PV Power Project | North Las Vegas, NV | 49.7 GWh | 12.5 mi |
Chuck Lenzie Generating Station | Apex, NV | 6.4 TWh | 11.2 mi |
Clark (NVE) | Las Vegas, NV | 856.5 GWh | 13.5 mi |
Dry Lake Solar Energy Center | Moapa, NV | 223.3 GWh | 14 mi |
Harry Allen | Las Vegas, NV | 2.6 TWh | 14.2 mi |
IGS VGT | North Las Vegas, NV | 86.0 MWh | 9.9 mi |
Las Vegas Generating Station | North Las Vegas, NV | 465.6 GWh | 13.6 mi |
Las Vegas WPCF Solar Plant | Las Vegas, NV | 5.8 GWh | 10.8 mi |
Mountain View Solar | North Las Vegas, NV | 53.8 GWh | 12.4 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh | 10.1 mi |
Nellis Solar PV II | North Las Vegas, NV | 37.8 GWh | 9.5 mi |
Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 460.3 GWh | 8.5 mi |
Playa Solar 1, LLC | North Las Vegas, NV | 185.6 GWh | 12.7 mi |
Playa Solar 2 | North Las Vegas, NV | 246.7 GWh | 12.7 mi |
Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh | 9.2 mi |
River Mountains Solar | Henderson, NV | 28.9 GWh | 13.7 mi |
Silverhawk | North Las Vegas, NV | 2.9 TWh | 13.4 mi |
Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh | 0.6 mi |
Sun Peak Generating Station | Las Vegas, NV | 31.6 GWh | 10.6 mi |