830 Main Campus Drive, Raleigh, NC 27695Plant Summary Information
NCSU CCUP Cogeneration Plant is ranked #19 out of 30 natural gas power plants in North Carolina in terms of total annual net electricity generation.
NCSU CCUP Cogeneration Plant is comprised of 2 generators and generated 9.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | NCSU CCUP Cogeneration Plant |
---|---|
Utility Name | NC State University, Energy Systems |
Location | Wake County, NC |
Initial Operation Date | February 2019 |
Last Update | Dec 2023 |
Annual Generation | 43.7 GWh |
Annual Consumption | 686.5 k MMBtu |
Ranked #4,039 out of 11,835 Power Plants Nationwide | |
Ranked #1,143 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #105 out of 862 North Carolina Power Plants | |
Ranked #19 out of 30 North Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas : 98.9% Distillate Fuel Oil : 1.1% |
Map of NCSU CCUP Cogeneration Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NCSU CCUP Cogeneration Plant.
Monthly Net Generation for NCSU CCUP Cogeneration Plant
NCSU CCUP Cogeneration Plant Details
Summary Information | |
---|---|
Plant Name | NCSU CCUP Cogeneration Plant (61675) |
Plant Address | 830 Main Campus Drive, Raleigh, NC 27695 |
Utility | NC State University, Energy Systems (61292) |
Latitude, Longitude | 35.77558, -78.67372 |
Generation Dates on File | Feb 2019 to Dec 2023 |
Initial Operation Date | February 2019 |
Annual Generation | 43.7 GWh |
Fuel Types | Natural Gas : 98.9% Distillate Fuel Oil : 1.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Municipal |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Dominion Energy bought out Public Svc Co of North Carolina |
Natural Gas Storage | No |
Generator CTG1 Details Operating February 2019
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5.3 MW |
Winter Capacity | 5.6 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2019 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil / Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 5.3 MW |
Net Winter Capacity With Natural Gas | 5.6 MW |
Net Summer Capacity With Oil | 5.3 MW |
Net Winter Capacity With Oil | 5.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator STG Details Operating February 2019
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2019 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
---|---|
Topping Or Bottoming | B |
Energy Source | Natural Gas / Natural Gas / Distillate Fuel Oil |
Startup Source | Waste Heat |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
NCSU CCUP Cogeneration Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1133 | LCEC Generation LLVC | Lovington, NM | 44.1 GWh |
#1134 | Aberdeen CT | Aberdeen, SD | 44.3 GWh |
#1135 | South Energy Center | Gainesville, FL | 44.0 GWh |
#1136 | Osawatomie | Miami, KS | 44.0 GWh |
#1137 | Bristol Myers Squibb Lawrenceville | Lawrenceville, NJ | 43.9 GWh |
#1138 | Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh |
#1139 | Tres City Power LLC | Victoria, TX | 43.4 GWh |
#1140 | Hibbing | Hibbing, MN | 68.3 GWh |
#1141 | Fuel Cell 3245 Yates Avenue | Bronx, NY | 43.3 GWh |
#1142 | Lawrence County Station | Mitchell, IN | 43.2 GWh |
#1144 | Arizona State University CHP | Tempe, AZ | 43.1 GWh |
#1145 | Fernandina Plant | Fernandina Beach, FL | 192.3 GWh |
#1146 | NYU LANGONE HEALTH | New York, NY | 42.9 GWh |
#1147 | Merck Rahway Power Plant | Rahway, NJ | 42.8 GWh |
#1148 | Orbit Bloom Fuel Cell | Medford, NY | 42.6 GWh |
#1149 | International Paper Riegelwood Mill | Riegelwood, NC | 334.9 GWh |
#1150 | Pinckneyville | Pinckneyville, IL | 42.4 GWh |
#1151 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 258.8 GWh |
#1152 | Pouch | Staten Island, NY | 42.1 GWh |
#1153 | Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NCSU CCUP Cogeneration Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
315 Vinson Road | Clayton, NC | 4.4 GWh | 19 mi |
Angier Farm | Angier, NC | 7.1 GWh | 18.4 mi |
CBC Solar Energy Gen Fac Phase 2 | Garner, NC | 3.2 GWh | 10.8 mi |
Church Road Solar LLC | Angier, NC | 7.1 GWh | 17.6 mi |
Creech Solar 2, LLC | Garner, NC | 9.1 GWh | 5.4 mi |
Durham Solar | Durham, NC | 5.6 GWh | 18.6 mi |
Fuquay Farm | Middle Creek Township, NC | 8.6 GWh | 14.7 mi |
Harris | New Hill, NC | 7.7 TWh | 18.6 mi |
HCE Johnston I, LLC | Willow Springs, NC | 3.4 GWh | 15.5 mi |
Kathleen Solar | Fuquay Varina, NC | 10.0 GWh | 19.5 mi |
Murdock Solar | Clayton, NC | 6.5 GWh | 11.6 mi |
NCSU Cates Cogeneration Plant | Raleigh, NC | 76.4 GWh | 0.6 mi |
Neuse River Solar Farm | Raleigh, NC | 1.5 GWh | 10.7 mi |
Page Solar | Willow Spring, NC | 2.4 GWh | 16.9 mi |
SAS Solar Farm | Cary, NC | 1.7 GWh | 5 mi |
Sunfish Farm | Willow Spring, NC | 8.8 GWh | 15.4 mi |
Wake County LFG Facility | Apex, NC | 57.9 GWh | 12.3 mi |
Wake RJ3 Solar Energy Storage | Wake Forest, NC | 234.9 MWh | 18.6 mi |
Wendell Solar Farm LLC | Wendell, NC | 8.3 GWh | 18.1 mi |
XPF Solar Field | Durham, NC | 4.3 GWh | 14.6 mi |