Nautilus Winsted Solar (CSG)
4433 230th Street, Winsted, MN 55395Plant Summary Information
Nautilus Winsted Solar (CSG) is ranked #118 out of 483 solar farms in Minnesota in terms of total annual net electricity generation.
Nautilus Winsted Solar (CSG) generated 1.6 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Nautilus Winsted Solar (CSG) |
---|---|
Utility Name | Nautilus Solar Solutions |
Location | McLeod County, MN |
Initial Operation Date | April 2019 |
Last Update | Oct 2024 |
Annual Generation | 5.4 GWh |
Annual Consumption | 19.9 k MMBtu |
Ranked #7,526 out of 11,866 Power Plants Nationwide | |
Ranked #2,709 out of 5,672 Solar Power Plants Nationwide | |
Ranked #258 out of 737 Minnesota Power Plants | |
Ranked #118 out of 483 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of Nautilus Winsted Solar (CSG)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nautilus Winsted Solar (CSG).
Monthly Net Generation for Nautilus Winsted Solar (CSG)
Nautilus Winsted Solar (CSG) Details
Summary Information | |
---|---|
Plant Name | Nautilus Winsted Solar (CSG) (62032) |
Plant Address | 4433 230th Street, Winsted, MN 55395 |
Utility | Nautilus Solar Solutions (61227) |
Latitude, Longitude | 44.94888, -94.08566 |
Generation Dates on File | Apr 2019 to Oct 2024 |
Initial Operation Date | April 2019 |
Annual Generation | 5.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator WS Details Operating April 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 4.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Nautilus Winsted Solar (CSG) Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2699 | Brook Street Solar 1 CSG | Plympton, MA | 5.5 GWh |
#2700 | Richmond County GA S2 LLC | Hephzibah, GA | 5.5 GWh |
#2701 | DC Water Solar | Washington, DC | 5.5 GWh |
#2702 | Shiloh Hwy Solar | Shiloh, NC | 5.5 GWh |
#2703 | Duplin Solar I LLC (160 Houston Lane) | Kenansville, NC | 5.5 GWh |
#2704 | Rockmart | Rockmart, GA | 5.5 GWh |
#2705 | Cathcart Solar, LLC | Whiteville, NC | 5.5 GWh |
#2706 | Trout Creek Solar | Buena Vista, CO | 5.5 GWh |
#2707 | Charlton Solar I CSG | Charlton, MA | 5.5 GWh |
#2708 | 25 Ashdown Road Solar, LLC | Clifton Park, NY | 5.4 GWh |
#2710 | Mt. Tom Solar Project Hybrid | Holyoke, MA | 5.3 GWh |
#2711 | Sayreville Solar Project | Sayreville, NJ | 5.4 GWh |
#2712 | Baltimore Church Solar, LLC | Fairmont, NC | 5.4 GWh |
#2713 | 8500 Balboa PV, LLC | Northridge, CA | 5.4 GWh |
#2714 | IOS - MEW Phase 1 | Madison, ME | 5.4 GWh |
#2715 | Staunton | Brazil, IN | 5.4 GWh |
#2716 | Oak Street Solar | Springfield, MA | 5.4 GWh |
#2717 | Progress Solar II, LLC | Fairmont, NC | 5.4 GWh |
#2718 | CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh |
#2719 | Putnam Erickson | Eatonton, GA | 5.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nautilus Winsted Solar (CSG).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Andromeda Community Solar | Lester Prairie, MN | 8.3 GWh | 4.2 mi |
Barone CSG | Winstead, MN | 1.8 GWh | 0.6 mi |
Cokato CSG | Cokato, MN | 8.0 GWh | 11.5 mi |
Helen CSG 1 LLC | Plato, MN | 2.3 GWh | 11.2 mi |
Helen Solar CSG | Plato, MN | 9.2 GWh | 11.1 mi |
Honeysuckle Solar, LLC | Lester Prairie, MN | 2.0 GWh | 4 mi |
Laurel Village (CSG) | Cokato, MN | 1.8 GWh | 10.4 mi |
Montgomery Winsted CSG | Winsted, MN | 4.8 GWh | 1.5 mi |
Montrose Solar | Montrose, MN | 6.9 GWh | 10.8 mi |
MontSun Community Solar | Montrose, MN | 8.2 GWh | 11.7 mi |
Nesvold Watertown Solar | Watertown, MN | 8.5 GWh | 12.6 mi |
New Germany Community Solar Garden | New Germany, MN | 1.6 GWh | 5.1 mi |
Novel Martin Solar One LLC (McLeod) CSG | Lester Prairie, MN | 1.8 GWh | 4.2 mi |
Plato CSG1, LLC | Glencoe, MN | 2.1 GWh | 11 mi |
South Garden | Winstead, MN | 1.2 GWh | 0.4 mi |
Spruce Ridge Gas Recovery | Glencoe, MN | 20.2 GWh | 12.2 mi |
USS Dressen Family Solar LLC | Mayer, MN | 729.0 MWh | 12.6 mi |
USS Lake Patterson Solar CSG | Cologne, MN | 2.2 GWh | 12.3 mi |
USS Water Fowl Solar LLC CSG | Silver Lake, MN | 875.0 MWh | 4.7 mi |
WaveSun Community Solar | Waverly, MN | 8.2 GWh | 9.3 mi |