37720 Pine Street, Badin, NC 28009Plant Summary Information
Narrows (NC) is ranked #21 out of 862 power plants in North Carolina in terms of total annual net electricity generation.
Narrows (NC) is comprised of 4 generators and generated 70.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Narrows (NC) |
---|---|
Utility Name | Eagle Creek Renewable Energy, LLC |
Location | Stanly County, NC |
Initial Operation Date | July 1917 |
Last Update | Dec 2023 |
Annual Generation | 462.5 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,361 out of 11,835 Power Plants Nationwide | |
Ranked #92 out of 1,371 Water Power Plants Nationwide | |
Ranked #21 out of 862 North Carolina Power Plants | |
Ranked #2 out of 36 North Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operators |
Alcoa Power Generating Inc Yadkin Div (2013 to 2016) Cube Hydro Carolinas Yadkin (2017 to 2020) Eagle Creek Renewable Energy, LLC (2021 to 2023) |
Map of Narrows (NC)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Narrows (NC).
Monthly Net Generation for Narrows (NC)
Narrows (NC) Details
Summary Information | |
---|---|
Plant Name | Narrows (NC) (54894) |
Plant Address | 37720 Pine Street, Badin, NC 28009 |
Utility | Eagle Creek Renewable Energy, LLC (57280) |
Latitude, Longitude | 35.4189, -80.0917 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | July 1917 |
Annual Generation | 462.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Alcoa Power Generating, Inc. - Yadkin Division (YAD) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Yadkin River |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 100.00 kV |
Energy Storage | No |
Generator YN1 Details Operating July 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 24.7 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator YN2 Details Operating July 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 24.7 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator YN3 Details Operating July 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 29 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Minimum Load | 29 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator YN4 Details Operating December 1924
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 30.4 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 29 MW |
Winter Capacity | 29 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1924 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Narrows (NC) Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Cube Yadkin Generation LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator YN1 | 100.00% |
Cube Yadkin Generation LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator YN2 | 100.00% |
Cube Yadkin Generation LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator YN3 | 100.00% |
Cube Yadkin Generation LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator YN4 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#82 | Don Pedro | La Grange, CA | 502.5 GWh |
#83 | Wyman Hydro | Bingham, ME | 501.6 GWh |
#84 | Barkley | Kuttawa, KY | 500.5 GWh |
#85 | Table Rock | Branson, MO | 499.1 GWh |
#86 | White Rock/Slab Creek | Placerville, CA | 495.3 GWh |
#87 | Middle Fork | Foresthill, CA | 492.1 GWh |
#88 | Balch 2 | Balch Camp, CA | 489.7 GWh |
#89 | Ryan | Great Falls, MT | 486.3 GWh |
#90 | Merwin | Ariel, WA | 471.6 GWh |
#91 | Wolf Creek | Jamestown, KY | 470.5 GWh |
#93 | Jaybird | Camino, CA | 461.8 GWh |
#94 | Cannelton Hydroelectric Plant | Hawesville, KY | 460.6 GWh |
#95 | Ralston | Foresthill, CA | 459.9 GWh |
#96 | Lay Dam | Clanton, AL | 454.7 GWh |
#97 | Guntersville | Guntersville, AL | 453.4 GWh |
#98 | Big Creek 4 | North Fork, CA | 452.9 GWh |
#99 | Cheoah | Tapoco, NC | 447.8 GWh |
#100 | Summer Falls Power Plant | Coulee City, WA | 447.2 GWh |
#101 | Fairfield Pumped Storage | Jenkinsville, SC | 445.8 GWh |
#102 | R C Kirkwood | Groveland, CA | 437.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Narrows (NC).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Achilles Solar | Troy, NC | 9.7 GWh | 10.9 mi |
Albemarle Hospital Unit | Albemarle, NC | 33.0 MWh | 6.9 mi |
Albemarle Prime Power Park | New London, NC | 59.0 MWh | 3.5 mi |
Biscoe Solar LLC | Biscoe, NC | 8.7 GWh | 18.3 mi |
Buddy Solar | Gold Hill, NC | 6.0 GWh | 17.5 mi |
Copperfield | Troy, NC | 3.4 GWh | 7.9 mi |
ESA Albemarle NC Solar | Albemarle, NC | 4.4 GWh | 2.4 mi |
Falls Hydro | Badin, NC | 124.1 GWh | 1.9 mi |
Fisher Solar Farm - NC | Oakboro, NC | 9.2 GWh | 12.7 mi |
Gilead | Gilead, NC | 6.7 GWh | 15.9 mi |
Haywood Farm Solar, LLC | Troy, NC | 8.8 GWh | 11.3 mi |
Hector Farm | Troy, NC | 9.1 GWh | 10.7 mi |
High Rock Hydro | Denton, NC | 114.3 GWh | 14.9 mi |
Little River PV 1 | Randolph, NC | 8.8 GWh | 18.2 mi |
Misenheimer Farm | Richfield, NC | 8.1 GWh | 11.9 mi |
Misenheimer Solar LLC | Gold Hill, NC | 95.6 GWh | 12.4 mi |
Stanly Solar, LLC | Albemarle, NC | 99.8 GWh | 12.1 mi |
Tillery | Mount Gilead, NC | 166.4 GWh | 14.7 mi |
Tuckertown Hydro | New London, NC | 124.6 GWh | 6.6 mi |
Uwharrie Mountain Renewable | Mt. Gilead, NC | 35.2 GWh | 9.3 mi |