Narrows Gas Turbines Generating
4 Whale Square, Brooklyn, NY 11232Plant Summary Information
Narrows Gas Turbines Generating is ranked #68 out of 116 natural gas power plants in New York in terms of total annual net electricity generation.
Narrows Gas Turbines Generating is comprised of 16 generators and generated 1.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Narrows Gas Turbines Generating |
---|---|
Utility Name | U S Power Generating Company LLC |
Location | Kings County, NY |
Initial Operation Date | May 1972 |
Last Update | Dec 2023 |
Annual Generation | 31.4 GWh |
Annual Consumption | 554.9 k MMBtu |
Ranked #4,493 out of 11,852 Power Plants Nationwide | |
Ranked #1,281 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #174 out of 832 New York Power Plants | |
Ranked #68 out of 116 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 96.0% Distillate Fuel Oil : 4.0% |
Map of Narrows Gas Turbines Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Narrows Gas Turbines Generating.
Monthly Net Generation for Narrows Gas Turbines Generating
Narrows Gas Turbines Generating Details
Summary Information | |
---|---|
Plant Name | Narrows Gas Turbines Generating (2499) |
Plant Address | 4 Whale Square, Brooklyn, NY 11232 |
Utility | U S Power Generating Company LLC (54863) |
Latitude, Longitude | 40.64861, -74.02083 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1972 |
Annual Generation | 31.4 GWh |
Fuel Types | Natural Gas : 96.0% Distillate Fuel Oil : 4.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-206 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | KEYSPAN ENERGY DBA NATIOAL GRID NY |
Natural Gas Storage | No |
Generator NT11 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 21 MW |
Winter Capacity | 27.4 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 19.3 MW |
Net Winter Capacity With Natural Gas | 24.9 MW |
Net Summer Capacity With Oil | 19.3 MW |
Net Winter Capacity With Oil | 24.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT12 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 19.5 MW |
Winter Capacity | 25.5 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 17.1 MW |
Net Winter Capacity With Natural Gas | 23.8 MW |
Net Summer Capacity With Oil | 17.1 MW |
Net Winter Capacity With Oil | 23.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT13 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 20.4 MW |
Winter Capacity | 26.6 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 18.3 MW |
Net Winter Capacity With Natural Gas | 24.9 MW |
Net Summer Capacity With Oil | 18.3 MW |
Net Winter Capacity With Oil | 24.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT14 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 20.1 MW |
Winter Capacity | 26.3 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 18.8 MW |
Net Winter Capacity With Natural Gas | 24.9 MW |
Net Summer Capacity With Oil | 18.8 MW |
Net Winter Capacity With Oil | 24.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT15 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 19.8 MW |
Winter Capacity | 25.9 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 19.9 MW |
Net Winter Capacity With Natural Gas | 24.9 MW |
Net Summer Capacity With Oil | 19.9 MW |
Net Winter Capacity With Oil | 24.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT16 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 18.9 MW |
Winter Capacity | 24.7 MW |
Minimum Load | 15.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 16.5 MW |
Net Winter Capacity With Natural Gas | 22.2 MW |
Net Summer Capacity With Oil | 16.5 MW |
Net Winter Capacity With Oil | 22.2 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT17 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 18.4 MW |
Winter Capacity | 24 MW |
Minimum Load | 15.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 19.4 MW |
Net Winter Capacity With Natural Gas | 24.9 MW |
Net Summer Capacity With Oil | 19.4 MW |
Net Winter Capacity With Oil | 24.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT18 Details Operating May 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 19.9 MW |
Winter Capacity | 26 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 17.5 MW |
Net Winter Capacity With Natural Gas | 23.2 MW |
Net Summer Capacity With Oil | 17.5 MW |
Net Winter Capacity With Oil | 23.2 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT21 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 19.4 MW |
Winter Capacity | 25.3 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 19.2 MW |
Net Winter Capacity With Natural Gas | 24.8 MW |
Net Summer Capacity With Oil | 19.2 MW |
Net Winter Capacity With Oil | 24.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT22 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 18.7 MW |
Winter Capacity | 24.4 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 16.4 MW |
Net Winter Capacity With Natural Gas | 22.9 MW |
Net Summer Capacity With Oil | 16.4 MW |
Net Winter Capacity With Oil | 22.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT23 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 18.4 MW |
Winter Capacity | 24 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 17.5 MW |
Net Winter Capacity With Natural Gas | 23.8 MW |
Net Summer Capacity With Oil | 17.5 MW |
Net Winter Capacity With Oil | 23.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT24 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 18.4 MW |
Winter Capacity | 24 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 17.9 MW |
Net Winter Capacity With Natural Gas | 24.2 MW |
Net Summer Capacity With Oil | 17.9 MW |
Net Winter Capacity With Oil | 24.2 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT25 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 19.9 MW |
Winter Capacity | 26 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 18.1 MW |
Net Winter Capacity With Natural Gas | 24.4 MW |
Net Summer Capacity With Oil | 18.1 MW |
Net Winter Capacity With Oil | 24.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT26 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 18.1 MW |
Winter Capacity | 23.6 MW |
Minimum Load | 15.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 16.3 MW |
Net Winter Capacity With Natural Gas | 21.9 MW |
Net Summer Capacity With Oil | 16.3 MW |
Net Winter Capacity With Oil | 21.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT27 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 20.7 MW |
Winter Capacity | 27 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 18.5 MW |
Net Winter Capacity With Natural Gas | 24.9 MW |
Net Summer Capacity With Oil | 18.5 MW |
Net Winter Capacity With Oil | 24.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator NT28 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 17.5 MW |
Winter Capacity | 22.9 MW |
Minimum Load | 15.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 16.3 MW |
Net Winter Capacity With Natural Gas | 21.9 MW |
Net Summer Capacity With Oil | 16.3 MW |
Net Winter Capacity With Oil | 21.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Narrows Gas Turbines Generating Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1271 | Albany Medical Ctr Cogen Plant | Albany, NY | 31.3 GWh |
#1272 | Sherman Avenue | Vineland, NJ | 32.9 GWh |
#1273 | Darlington County | Hartsville, SC | 37.2 GWh |
#1274 | Ponca City | Ponca City, OK | 31.0 GWh |
#1275 | Berry Placerita Cogen | Santa Clarita, CA | 30.9 GWh |
#1276 | Indeck Yerkes Energy Center | Tonawanda, NY | 30.8 GWh |
#1277 | Hutchinson Plant #1 | Hutchinson, MN | 30.7 GWh |
#1278 | Jax LNG | Jacksonville, FL | 30.5 GWh |
#1279 | P Plant | San Diego, CA | 30.5 GWh |
#1280 | New Mexico State University | Las Cruces, NM | 30.1 GWh |
#1282 | CoreSite - Somerville | Somerville, MA | 29.8 GWh |
#1283 | McPherson 2 | McPherson, KS | 37.8 GWh |
#1284 | POET Biorefining - Marion, LLC | Marion, OH | 29.7 GWh |
#1285 | R M Heskett | Mandan, ND | 29.5 GWh |
#1286 | Gaylord Container Bogalusa | Bogalusa, LA | 406.8 GWh |
#1287 | EQX015 Great Oaks Fuel Cell | San Jose, CA | 29.2 GWh |
#1288 | Astoria Gas Turbines | Astoria, NY | 33.5 GWh |
#1289 | Norton Powerhouse 2 | Worcester, MA | 28.9 GWh |
#1290 | CSUF Trigeneration | Fullerton, CA | 34.7 GWh |
#1291 | Potter Station 2 | Braintree, MA | 32.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Narrows Gas Turbines Generating.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayonne Energy Center | Bayonne, NJ | 485.0 GWh | 3.7 mi |
Brooklyn Hospital Center | Brooklyn, NY | 27.0 MWh | 3.7 mi |
Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.1 TWh | 4.2 mi |
Gowanus Gas Turbines Generating | Brooklyn, NY | 11.3 GWh | 1.3 mi |
Jersey City DWP | Jersey City, NJ | 1.2 GWh | 4.5 mi |
Joseph J Seymour Power Project | Brooklyn, NY | 52.5 GWh | 1.5 mi |
Kingsbrook Jewish Medical Center | Brooklyn, NY | 32.0 MWh | 4.6 mi |
Maimonides Medical Center | Brooklyn, NY | 31.0 MWh | 1.3 mi |
NewYork-Presbyterian Brooklyn Methodist Hospital | Brooklyn, NY | 65.0 MWh | 2.6 mi |
NHH003 Clarkson Fuel Cell | Brooklyn, NY | 7.7 GWh | 4.1 mi |
NHH004 Winthrop Fuel Cell | Brooklyn, NY | 7.3 GWh | 3.9 mi |
North 1st | Brooklyn, NY | 31.5 GWh | 5.5 mi |
NYC-HH - CONEY ISLAND HOSPITAL | Brooklyn, NY | 50.0 MWh | 5.2 mi |
NYP-Lower Manhattan Hospital | New York, NY | 19.0 MWh | 4.3 mi |
NYU Luthern Medical Center | New York City, NY | 105.0 MWh | 0.1 mi |
Pouch | Staten Island, NY | 42.1 GWh | 3.3 mi |
Royal Wine Corp Solar Power Plant | Bayonne, NJ | 2.6 GWh | 4.3 mi |
SDM000 Clarkson Fuel Cell | Brooklyn, NY | 13.4 GWh | 4 mi |
The Bank of New York | New York, NY | 30.0 MWh | 4.6 mi |
WEA Texas Bayonne | Bayonne, NJ | 2.1 GWh | 4.2 mi |