Nacimiento Hydro Project
10690 Nacimiento Lake Drive, Bradley, CA 93426Plant Summary Information
Nacimiento Hydro Project is ranked #130 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Nacimiento Hydro Project is comprised of 2 generators and generated 4.7 GWh during the 3-month period between August 2023 to November 2023.
Plant Name | Nacimiento Hydro Project |
---|---|
Utility Name | Monterey Cnty Water Res Agency |
Location | San Luis Obispo County, CA |
Initial Operation Date | July 1987 |
Last Update | Nov 2023 |
Annual Generation | 18.6 GWh |
Annual Consumption | 63.7 k MMBtu |
Ranked #5,139 out of 11,835 Power Plants Nationwide | |
Ranked #780 out of 1,371 Water Power Plants Nationwide | |
Ranked #716 out of 1,569 California Power Plants | |
Ranked #130 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of Nacimiento Hydro Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nacimiento Hydro Project.
Monthly Net Generation for Nacimiento Hydro Project
Nacimiento Hydro Project Details
Summary Information | |
---|---|
Plant Name | Nacimiento Hydro Project (50352) |
Plant Address | 10690 Nacimiento Lake Drive, Bradley, CA 93426 |
Utility | Monterey Cnty Water Res Agency (12850) |
Latitude, Longitude | 35.79858, -120.88333 |
Generation Dates on File | Jan 2001 to Nov 2023 |
Initial Operation Date | July 1987 |
Annual Generation | 18.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Nacimiento Reservoir |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 1987
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3.7 MW |
Winter Capacity | 3.6 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1987 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating July 1987
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1987 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Nacimiento Hydro Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#770 | Foothill Feeder | Castaic, CA | 19.6 GWh |
#771 | Fort Miller Hydroelectric Facility | Northumberland, NY | 19.5 GWh |
#772 | Gaston Shoals | Blacksburg, SC | 19.3 GWh |
#773 | Power Creek | Cordova, AK | 19.2 GWh |
#774 | Verdi | Verdi, NV | 19.1 GWh |
#775 | Kansas River Project | Lawrence, KS | 19.0 GWh |
#776 | Alexander | Merrill, WI | 19.0 GWh |
#777 | Rochester 5 | Rochester, NY | 18.9 GWh |
#778 | Pioneer | Ogden, UT | 18.7 GWh |
#779 | PEC Headworks | Moses Lake, WA | 18.7 GWh |
#781 | Nottely | Blairsville, GA | 18.6 GWh |
#782 | Lower Molina | Molina, CO | 18.6 GWh |
#783 | Lachute Hydro Lower | Ticonderoga, NY | 18.5 GWh |
#784 | Lachute Hydro Upper | Ticonderoga, NY | 18.5 GWh |
#785 | Beldens | New Haven, VT | 18.5 GWh |
#786 | Olsen | Whitmore, CA | 18.4 GWh |
#787 | Spirit Mountain | Cody, WY | 18.4 GWh |
#788 | Spaulding 3 | Emigrant Gap, CA | 18.3 GWh |
#789 | Fish Creek | Idleyld Park, OR | 18.3 GWh |
#790 | Mosinee Mill | Mosinee, WI | 118.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nacimiento Hydro Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 23.6 GWh | 10.8 mi |
Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 27.1 mi |
Blackjack Solar | King City, CA | 6.9 GWh | 27.6 mi |
CA Flats Solar 130, LLC | Shandon, CA | 230.4 GWh | 29.7 mi |
CA Flats Solar 150, LLC | Shandon, CA | 327.9 GWh | 29.7 mi |
CA-DGS-California Men's Colony | San Luis Obispo, CA | 3.7 GWh | 34.4 mi |
CDCR (CA) - Pleasant Valley State Prison | Coalinga, CA | 2.1 GWh | 43.6 mi |
CED Avenal | Avenal, CA | 8.6 GWh | 43.2 mi |
Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh | 36.7 mi |
Coalinga Cogeneration Facility | Coalinga, CA | 44.4 GWh | 38.8 mi |
Diablo Canyon | Avila Beach, CA | 16.7 TWh | 40.6 mi |
DSH (CA) - Coalinga State Hospital | Coalinga, CA | 4.2 GWh | 43.9 mi |
Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.9 GWh | 17.6 mi |
Foundation Scheid Vineyards | Greenfield, CA | 4.0 GWh | 37.1 mi |
King City Peaking | King City, CA | 12.2 GWh | 32.4 mi |
King City Power Plant | King City, CA | 40.3 GWh | 32.5 mi |
Meridian Vineyards | Paso Robles, CA | 1.4 GWh | 19.8 mi |
Salinas River Cogeneration | San Ardo, CA | 226.0 GWh | 10.6 mi |
Stenner Creek Solar | San Luis Obispo, CA | 700.0 MWh | 34.8 mi |
Vintner Solar | Templeton, CA | 3.9 GWh | 20.1 mi |