Mustang Two
17189 Avenal Cutoff Road, Lemoore, CA 93245Plant Summary Information
Mustang Two is ranked #35 out of 808 solar farms in California in terms of total annual net electricity generation.
Mustang Two generated 58.1 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Mustang Two |
---|---|
Utility Name | RE Mustang Two LLC |
Location | Kings County, CA |
Initial Operation Date | November 2020 |
Last Update | Feb 2025 |
Annual Generation | 397.0 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,542 out of 11,993 Power Plants Nationwide | |
Ranked #114 out of 5,778 Solar Power Plants Nationwide | |
Ranked #112 out of 1,579 California Power Plants | |
Ranked #35 out of 808 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
RE Mustang Two LLC (2018 to 2023) Idemitsu Renewables (2019 to 2019) |
Map of Mustang Two
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mustang Two.
Monthly Net Generation for Mustang Two
Mustang Two Details
Summary Information | |
---|---|
Plant Name | Mustang Two (62015) |
Plant Address | 17189 Avenal Cutoff Road, Lemoore, CA 93245 |
Utility | RE Mustang Two LLC (61589) |
Latitude, Longitude | 36.21681, -119.89639 |
Generation Dates on File | Nov 2020 to Feb 2025 |
Initial Operation Date | November 2020 |
Annual Generation | 397.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator M2BAR Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 71.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator M2WHI Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 139.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mustang Two Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Idemitsu Renewables | 50 W. Liberty Dr., Suite 640, Reno, NV 89501 | Generator M2BAR | 100.00% |
Idemitsu Renewables | 50 W. Liberty Dr., Suite 640, Reno, NV 89501 | Generator M2WHI | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#104 | Sun Streams, LLC | Arlington, AZ | 411.5 GWh |
#105 | Mount Signal Solar Farm II | Calexico, CA | 409.8 GWh |
#106 | Big Plain Solar, LLC | London, OH | 408.4 GWh |
#107 | Yellow Pine Solar | Enterprise, NV | 392.9 GWh |
#108 | Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh |
#109 | Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh |
#110 | Castle Gap Solar Hybrid | McCarney, TX | 400.9 GWh |
#111 | Brazoria West | Damon, TX | 401.6 GWh |
#112 | Tres Bahias | Port Lavaca, TX | 401.2 GWh |
#113 | North Rosamond Solar LLC | Rosamond, CA | 397.7 GWh |
#115 | Riverstart Solar Park LLC | Modoc, IN | 394.5 GWh |
#116 | RE Garland | Rosamond, CA | 383.7 GWh |
#117 | Shakes Solar | Carrizo Springs, TX | 391.9 GWh |
#118 | Buena Vista Energy Center | Chaparral, NM | 386.3 GWh |
#119 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#120 | Brazoria County Solar Project (Danciger) | Damon, TX | 387.3 GWh |
#121 | Mockingbird Solar Center | Brookston, TX | 387.0 GWh |
#122 | Hillcrest Solar | Mt. Orab, OH | 386.2 GWh |
#123 | Holstein 1 Solar Farm | Wingate, TX | 384.9 GWh |
#124 | Buckthorn Westex | Ft. Stockton, TX | 383.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mustang Two.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Almond | Lemoore, CA | 9.6 GWh | 0.8 mi |
American Kings Solar, LLC | Lemoore, CA | 332.2 GWh | 1.6 mi |
Aquamarine | Lemoore, CA | 469.5 GWh | 1.9 mi |
Chestnut | Lemoore, CA | 377.7 GWh | 3.9 mi |
Henrietta Peaker | Lemoore, CA | 10.3 GWh | 1.6 mi |
Henrietta Solar Project | Lemoore, CA | 234.2 GWh | 5 mi |
Huron Solar Station | Huron, CA | 31.3 GWh | 7.9 mi |
Java Solar, LLC | Lemoore, CA | 28.6 GWh | 4.6 mi |
Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh | 11.8 mi |
Lemoore 1 | Lemoore, CA | 232.0 MWh | 6.2 mi |
RE Kansas Solar, LLC | Lemoore, CA | 38.7 GWh | 4.1 mi |
RE Kansas South LLC | Lemoore, CA | 51.1 GWh | 3.5 mi |
RE Kent South, LLC | Lemoore, CA | 40.6 GWh | 0.8 mi |
RE Mustang LLC | Lemoore, CA | 149.9 GWh | 0.5 mi |
Slate Hybrid | Stratford, CA | 681.6 GWh | 0.7 mi |
Solar Blue | Lemoore, CA | 645.6 GWh | 3 mi |
Van der Kooi Dairy Solar Array | Riverdale, CA | 3.9 GWh | 8.7 mi |
Verwey-Hanford Dairy Digester #3 | Hanford, CA | 5.3 GWh | 12.2 mi |
Westlands Solar PV Farm | Huron, CA | 37.8 GWh | 11.4 mi |
Westside Solar Power PV1 | Lemoore, CA | 4.6 GWh | 0.6 mi |