Mtn. Solar 1
4401 Imboden Road, Watkins, CO 80137Plant Summary Information
Mtn. Solar 1 is ranked #100 out of 130 solar farms in Colorado in terms of total annual net electricity generation.
Mtn. Solar 1 generated 797.6 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Mtn. Solar 1 |
---|---|
Utility Name | Standard Solar |
Location | Adams County, CO |
Initial Operation Date | August 2019 |
Last Update | Dec 2022 |
Annual Generation | 3.0 GWh |
Annual Consumption | 11.3 k MMBtu |
Ranked #8,770 out of 11,249 Power Plants Nationwide | |
Ranked #3,683 out of 5,158 Solar Power Plants Nationwide | |
Ranked #211 out of 250 Colorado Power Plants | |
Ranked #100 out of 130 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of Mtn. Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mtn. Solar 1.
Monthly Net Generation for Mtn. Solar 1
Mtn. Solar 1 Details
Summary Information | |
---|---|
Plant Name | Mtn. Solar 1 (63276) |
Plant Address | 4401 Imboden Road Watkins, CO 80137 |
Utility | Standard Solar (60531) |
Latitude, Longitude | 39.77762, -104.58591 |
Generation Dates on File | Aug 2019 to Dec 2022 |
Initial Operation Date | August 2019 |
Annual Generation | 3.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator X0133 Details Operating August 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.5 MW |
Mtn. Solar 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3673 | Google Moffett Park Solar Project | Sunnyvale, CA | 3.0 GWh |
#3674 | Drinkwater Solar | Saint Johnsville, NY | 3.1 GWh |
#3675 | Pima Community College - East Campus | Tucson, AZ | 3.1 GWh |
#3676 | County of Dutchess, NY (Airport) | Wappinger Falls, NY | 3.1 GWh |
#3677 | Oregon University System OIT Klamath Falls | Klamath Falls, OR | 3.1 GWh |
#3678 | CED Champaign Solar LLC | Champaign, IL | 3.1 GWh |
#3679 | Minke Solar | Molalla, OR | 3.0 GWh |
#3680 | SR Houston | Houston, MS | 3.0 GWh |
#3681 | Charlotte Solar LLC VT | Charlotte, VT | 3.0 GWh |
#3682 | Grassland 1&2 Solar Project | Davis, CA | 3.0 GWh |
#3684 | Lafayette 2 - Internal Services Dept | Los Angeles, CA | 3.0 GWh |
#3685 | Clif Bar Bakery of Twin Falls | Twin Falls, ID | 3.0 GWh |
#3686 | Union HS at Casa Grande | Casa Grande, AZ | 3.0 GWh |
#3687 | First Baptist Church of Glenarden | Upper Marlboro, MD | 3.0 GWh |
#3688 | ER Salvage Yard | Morrisville, VT | 3.0 GWh |
#3689 | Harford Solar Farm | Harford, NY | 3.0 GWh |
#3690 | L-8 Solar Project | Palmdale, CA | 3.0 GWh |
#3691 | DG Florham Park Solar LLC | Florham Park, NJ | 3.0 GWh |
#3692 | Newberry Solar 1 LLC | Newberry Springs, CA | 3.0 GWh |
#3693 | Otarre Solar Park | Cayce, SC | 3.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mtn. Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Community Solar Garden III LLC | Watkins, CO | 2.9 GWh | 0.6 mi |
Adams Community Solar Garden LLC | Watkins, CO | 2.9 GWh | 0.7 mi |
Amazon DEN2 Solar Project | Aurora, CO | 191.9 MWh | 8.9 mi |
Blue Spruce Energy Center | Aurora, CO | 444.2 GWh | 5.5 mi |
CO LI CSG 1 - Kamerra | Watkins, CO | 3.7 GWh | 0.5 mi |
Denver Int Airport | Denver, CO | 349.5 MWh | 7.2 mi |
Denver Metro Solar | Watkins, CO | 3.6 GWh | 2.3 mi |
Gaylord Rockies CHP | Aurora, CO | 12.4 GWh | 9.2 mi |
Imboden Solar Garden | Watkins, CO | 5.3 GWh | 0.6 mi |
Mtn. Solar 2 | Watkins, CO | 3.5 GWh | 0.8 mi |
Oak Leaf Solar XVIII LLC | Denver, CO | 9.7 GWh | 9.1 mi |
Oak Leaf Solar XXIII LLC (CSG) | Watkins, CO | 3.5 GWh | 2.5 mi |
Pioneer Solar (CO), LLC | Bennett, CO | 196.8 GWh | 6.8 mi |
Venture 1 - 1A CSG | Aurora, CO | 3.9 GWh | 4.7 mi |
Venture 2 - 1B | Aurora, CO | 3.9 GWh | 4.6 mi |
Venture 3 - 1C | Aurora, CO | 3.7 GWh | 4.7 mi |
Venture 4 - 1D | Aurora, CO | 3.9 GWh | 4.7 mi |
Victory Solar LLC | Bennett, CO | 24.9 GWh | 8.2 mi |
Xcel Adams 1 Community Solar Array | Watkins, CO | 3.8 GWh | 0.9 mi |
Xcel Adams 2 Community Solar Array | Watkins, CO | 3.9 GWh | 0.5 mi |