Mt. Tom Solar Project Hybrid
200 Northampton Street, Holyoke, MA 1040Plant Summary Information
Mt. Tom Solar Project Hybrid is ranked #68 out of 463 solar farms in Massachusetts in terms of total annual net electricity generation.
Mt. Tom Solar Project Hybrid generated 1.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Mt. Tom Solar Project Hybrid |
---|---|
Utility Name | Mt. Tom Solar, LLC |
Location | Hampden County, MA |
Initial Operation Date | January 2017 |
Last Update | Dec 2022 |
Annual Generation | 6.7 GWh |
Annual Consumption | 25.1 k MMBtu |
Ranked #6,921 out of 11,249 Power Plants Nationwide | |
Ranked #2,205 out of 5,158 Solar Power Plants Nationwide | |
Ranked #150 out of 573 Massachusetts Power Plants | |
Ranked #68 out of 463 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Mt. Tom Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mt. Tom Solar Project Hybrid.
Monthly Net Generation for Mt. Tom Solar Project Hybrid
Mt. Tom Solar Project Hybrid Details
Summary Information | |
---|---|
Plant Name | Mt. Tom Solar Project Hybrid (60906) |
Plant Address | 200 Northampton Street Holyoke, MA 1040 |
Utility | Mt. Tom Solar, LLC (60471) |
Latitude, Longitude | 42.2686, -72.603 |
Generation Dates on File | Jan 2017 to Dec 2022 |
Initial Operation Date | January 2017 |
Annual Generation | 6.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF16-196 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Holyoke - (MA) (8774) MA |
Grid Voltage | 13.80 kV |
Energy Storage | Yes |
Generator PV1 Details Operating January 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 5.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BA1 Details Operating March 2019
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 3.1 MW |
Summer Capacity | 3.1 MW |
Winter Capacity | 3.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 6.1 |
---|---|
Maximum Charge Rate | 2 MW |
Maximum Discharge Rate | 3.1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 2.3 |
Storage Enclosure Type | CS |
Load Management | Yes |
Excess Wind And Solar Generation | Yes |
Mt. Tom Solar Project Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2195 | Pinesburg Solar LLC | Williamsport, MD | 7.1 GWh |
#2196 | Butte College Main Campus Solar | Oroville, CA | 7.1 GWh |
#2197 | Garrell Solar Farm | Chadbourn, NC | 7.1 GWh |
#2198 | Monticello Project CSG | Monticello, MN | 7.0 GWh |
#2199 | Buckeye Union HS District 201 | Buckeye, AZ | 7.0 GWh |
#2200 | Sherburne North Project CSG | St. Cloud, MN | 7.0 GWh |
#2201 | Zuma Solar, LLC | Providence, NC | 7.0 GWh |
#2202 | Livingston Solar Canopies | Piscataway, NJ | 7.0 GWh |
#2203 | W. Orange Rd Solar LLC | Orange, MA | 7.0 GWh |
#2204 | Klamath Falls Solar 2 CSG | Klamath Falls, OR | 7.0 GWh |
#2206 | Crown | Lancaster, SC | 7.0 GWh |
#2207 | White Street Renewables | Greensboro, NC | 18.1 GWh |
#2208 | Gilead | Gilead, NC | 7.0 GWh |
#2209 | Randolph | Randolph, MA | 7.0 GWh |
#2210 | DG Iron Mountain | Edison, NJ | 7.0 GWh |
#2211 | TWE Chocowinity Solar, LLC | Chocowinity, NC | 7.0 GWh |
#2212 | Dixon Dairy Road Solar | Kings Mountain, NC | 7.0 GWh |
#2213 | BD Solar Ellsworth LLC | Augusta, ME | 7.0 GWh |
#2214 | RE Dillard 2 LLC | Sloughhouse, CA | 7.0 GWh |
#2215 | Yadkinville Solar | Yadkinville, NC | 7.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mt. Tom Solar Project Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boatlock | Holyoke, MA | 11.9 GWh | 4.1 mi |
Cabot Holyoke | Holyoke, MA | 2.8 GWh | 4.8 mi |
CED Chicopee Solar | Chicopee, MA | 5.5 GWh | 5.2 mi |
CED Northampton Solar LLC Hybrid | Northampton, MA | 7.4 GWh | 6.1 mi |
Chemical | Holyoke, MA | 3.8 GWh | 5.3 mi |
Chicopee Solar | Chicopee, MA | 5.2 GWh | 5.8 mi |
Easthampton CSG | Easthampton, MA | 3.9 GWh | 4.2 mi |
Easthampton Landfill-City of Easthampton | Easthampton, MA | 3.0 GWh | 5.2 mi |
Granby LFG | Granby, MA | 3.5 GWh | 4 mi |
Granby Solar, LLC CSG | Granby, MA | 5.6 GWh | 5 mi |
Hadley 2 Solar, LLC CSG | Hadley, MA | 3.2 GWh | 6.2 mi |
Hadley Falls | Holyoke, MA | 184.8 GWh | 3.9 mi |
Hadley Solar NG, LLC | Hadley, MA | 3.9 GWh | 6.6 mi |
Hatfield Renewables Community Solar | Hatfield, MA | 3.2 GWh | 5.4 mi |
Holyoke Solar Cooperative at Mueller | Holyoke, MA | 4.3 GWh | 6.7 mi |
Kearsarge Granby | Granby, MA | 4.1 GWh | 5.8 mi |
Northampton Landfill Solar PV | Northampton, MA | 4.1 GWh | 5.9 mi |
Riverside Holyoke | Holyoke, MA | 23.6 GWh | 4.7 mi |
Smith College Central Heating Plant | Northampton, MA | 15.2 GWh | 3.6 mi |
Syncarpha Northampton Hybrid CSG | Northampton, MA | 5.0 GWh | 5.6 mi |