Mt. Jackson Solar
3100 Turkey Knob Rd., Mt. Jackson, VA 23229Plant Summary Information
Mt. Jackson Solar is ranked #51 out of 96 solar farms in Virginia in terms of total annual net electricity generation.
Mt. Jackson Solar generated 5.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Mt. Jackson Solar |
---|---|
Utility Name | Energix Mt. Jackson, LLC. |
Location | Shenandoah County, VA |
Initial Operation Date | June 2021 |
Last Update | Dec 2023 |
Annual Generation | 32.9 GWh |
Annual Consumption | 116.5 k MMBtu |
Ranked #4,431 out of 11,866 Power Plants Nationwide | |
Ranked #977 out of 5,672 Solar Power Plants Nationwide | |
Ranked #103 out of 212 Virginia Power Plants | |
Ranked #51 out of 96 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Mt. Jackson Solar LLC (2016 to 2019) Energix Mt. Jackson, LLC. (2020 to 2023) |
Map of Mt. Jackson Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mt. Jackson Solar.
Monthly Net Generation for Mt. Jackson Solar
Mt. Jackson Solar Details
Summary Information | |
---|---|
Plant Name | Mt. Jackson Solar (61318) |
Plant Address | 3100 Turkey Knob Rd., Mt. Jackson, VA 23229 |
Utility | Energix Mt. Jackson, LLC. (60952) |
Latitude, Longitude | 38.73962, -78.66016 |
Generation Dates on File | Jun 2021 to Dec 2023 |
Initial Operation Date | June 2021 |
Annual Generation | 32.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 20-421-003 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator SOLAR Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 15.7 MW |
Summer Capacity | 15.7 MW |
Winter Capacity | 15.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Dual Axis Tracking | No |
DC Net Capacity | 22.1 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mt. Jackson Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#967 | Rochambeau Solar | Williamsburg, VA | 33.6 GWh |
#968 | Raptor Ridge | Tucson, AZ | 33.5 GWh |
#969 | DeSoto Next Generation Solar Energy | Arcadia, FL | 33.5 GWh |
#970 | Vaughn Creek PV1 | Murfreesboro, NC | 33.4 GWh |
#971 | Atwell Island | Alpaugh, CA | 33.4 GWh |
#972 | Sand Drag LLC | Avenal, CA | 33.4 GWh |
#973 | Nutmeg Solar | Enfield, CT | 33.4 GWh |
#974 | Halifax | Roanoke Rapids, NC | 33.3 GWh |
#975 | Badger 1 | Tonopah, AZ | 33.2 GWh |
#976 | NY8 - Branscomb Solar | Schaghticoke, NY | 33.2 GWh |
#978 | Imperial Valley Solar Company 1 LLC | Niland, CA | 32.9 GWh |
#979 | Sunflower Solar | Halifax, NC | 32.9 GWh |
#980 | County Line Renewable Energy Center | High Springs, FL | 32.8 GWh |
#981 | SEPV 8 | Twentynine Palms, CA | 32.8 GWh |
#982 | Luke Solar | Glendale, AZ | 32.8 GWh |
#983 | NVSS-II | Pahrump, NV | 32.7 GWh |
#984 | Sunray 3 | Daggett, CA | 32.6 GWh |
#985 | EGP Stillwater Solar PV II, LLC | Fallon, NV | 32.4 GWh |
#986 | St. Joseph Solar | Granger, IN | 32.4 GWh |
#987 | Whitetail Solar 3 | Chambersburg, PA | 32.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mt. Jackson Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Caden Energix Endless Caverns, LLC | New Market, VA | 43.6 GWh | 8.8 mi |
DG AMP Solar Front Royal | Front Royal, VA | 4.2 GWh | 29 mi |
Elkton | Elkton, VA | 13.0 GWh | 24.6 mi |
Foxglove Solar | Middletown, VA | 6.0 GWh | 30.8 mi |
Frederick County LFGTE Facility | Winchester, VA | 9.4 GWh | 41 mi |
Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh | 49.2 mi |
Hecate Energy Clarke County LLC | White Post, VA | 11.9 GWh | 36 mi |
HP Hood CT | Winchester, VA | 100.7 GWh | 37.2 mi |
Louisa Generation Facility | Gordonsville, VA | 236.9 GWh | 49.3 mi |
Luray Hydro Station | Luray, VA | 3.5 GWh | 9.7 mi |
Merck | Elkton, VA | 628.0 MWh | 24.6 mi |
Molson Coors Shenandoah Brewery | Elkton, VA | 5.5 GWh | 26.5 mi |
Mount Clinton | Harrisonburg, VA | 1.3 GWh | 21.8 mi |
Mt Storm | Mount Storm, WV | 3.6 TWh | 45.5 mi |
NedPower Mount Storm | Mount Storm, WV | 528.6 GWh | 44.3 mi |
New Creek Wind | New Creek, WV | 285.2 GWh | 41 mi |
Newport Hydro Station | Newport, VA | 3.1 GWh | 12.2 mi |
Pleasant Valley (VA) | Harrisonburg, VA | 890.8 MWh | 26.7 mi |
The Village at Orchard Ridge (TVOR) | Winchester, VA | 2.0 GWh | 39.9 mi |
Warren County | Front Royal, VA | 10.3 TWh | 30.5 mi |