Mount Sinai Hospital
1 Gustave L Levy Pl, New York, NY 10029Plant Summary Information
Mount Sinai Hospital is ranked #26 out of 78 distillate fuel oil power plants in New York in terms of total annual net electricity generation.
Mount Sinai Hospital is comprised of 15 generators and generated 9.4 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Mount Sinai Hospital |
---|---|
Utility Name | Mount Sinai Hospital |
Location | New York County, NY |
Initial Operation Date | June 1970 |
Last Update | Dec 2023 |
Annual Generation | 263.0 MWh |
Annual Consumption | 2.3 k MMBtu |
Ranked #11,217 out of 11,835 Power Plants Nationwide | |
Ranked #609 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #786 out of 832 New York Power Plants | |
Ranked #26 out of 78 New York Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Mount Sinai Hospital
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mount Sinai Hospital.
Monthly Net Generation for Mount Sinai Hospital
Mount Sinai Hospital Details
Summary Information | |
---|---|
Plant Name | Mount Sinai Hospital (61416) |
Plant Address | 1 Gustave L Levy Pl, New York, NY 10029 |
Utility | Mount Sinai Hospital (61053) |
Latitude, Longitude | 40.78999, -73.95369 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | June 1970 |
Annual Generation | 263.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator AP1 Details Standby June 1970
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator AP2 Details Standby June 1970
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator AP3 Details Standby June 1970
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator AP4 Details Standby June 1970
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1970 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GP7 Details Standby June 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EB10 Details Standby June 1996
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1996 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EB11 Details Standby June 1996
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1996 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator AP5 Details Standby October 1997
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | October 1997 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator AP6 Details Standby October 1997
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | October 1997 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GP8 Details Standby June 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 1998 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CAM12 Details Standby June 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 2007 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HES13 Details Standby June 2012
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 2012 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HES14 Details Standby June 2012
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | June 2012 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator FPA15 Details Standby May 2014
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | May 2014 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5EAST Details Standby January 2022
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Mount Sinai Hospital Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#599 | Marshall (NC) | Terrell, NC | 7.2 TWh |
#600 | Laverne Diesel Generating Plant | Laverne, OK | 283.0 MWh |
#601 | Centennial | Metlakatla, AK | 283.0 MWh |
#602 | WWTP Power Generation Station | Oakland, CA | 26.9 GWh |
#603 | Aberdeen CT | Aberdeen, SD | 44.3 GWh |
#604 | Robins | Robins AFB, GA | 331.0 MWh |
#605 | Lakefield Junction | Trimont, MN | 79.0 GWh |
#606 | Moser Generating Station | Pottstown, PA | 267.0 MWh |
#607 | Breese | Breese, IL | 264.0 MWh |
#608 | Essex Junction 19 | Essex Junction, VT | 49.9 GWh |
#610 | Rio Bravo | Albuquerque, NM | 552.3 GWh |
#611 | Holden | Holden, MO | 197.2 GWh |
#612 | North Branch (MN) | North Branch, MN | 257.0 MWh |
#613 | Pelican | Pelican, AK | 1.6 GWh |
#614 | Graettinger | Graettinger, IA | 255.0 MWh |
#615 | Gateway Gen | Manassas, VA | 253.0 MWh |
#616 | Lake (WY) | Yellowstone, WY | 252.0 MWh |
#617 | Old Faithful | Yellowstone, WY | 249.0 MWh |
#618 | McIntosh (AL) | McIntosh, AL | 745.7 GWh |
#619 | Haines | Haines, AK | 242.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mount Sinai Hospital.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
59th Street | New York, NY | 612.0 MWh | 2.3 mi |
74th Street | New York, NY | 176.0 MWh | 1.5 mi |
Astoria Energy | New York, NY | 4.3 TWh | 3 mi |
Astoria Energy II | Astoria, NY | 4.2 TWh | 3 mi |
Astoria Gas Turbines | Astoria, NY | 33.5 GWh | 2.6 mi |
Astoria Generating Station | Astoria, NY | 729.8 GWh | 2.2 mi |
Harlem River Yard | Bronx, NY | 92.5 GWh | 2.1 mi |
Hell Gate | Bronx, NY | 99.8 GWh | 2.4 mi |
Hilton NY Co Gen Plant | New York City, NY | 5.3 GWh | 2.3 mi |
New York Presbyterian Hospital-168th St | New York, NY | 126.0 MWh | 3.6 mi |
New York University Central Plant | New York, NY | 74.2 GWh | 1.6 mi |
North Bergen Solar | North Bergen, NJ | 2.3 GWh | 3.8 mi |
NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 48.1 GWh | 1.8 mi |
NYC-HH-New Bellevue Hospital | New York, NY | 171.0 MWh | 3.7 mi |
NYU LANGONE HEALTH | New York, NY | 42.9 GWh | 3.1 mi |
OBP Cogen | New York, NY | 25.4 GWh | 2.9 mi |
Peak Power 1 Cogen | New York, NY | 21.4 GWh | 3.3 mi |
Ravenswood | Long Island, NY | 2.9 TWh | 2.2 mi |
Vernon Boulevard | Long Island City, NY | 120.4 GWh | 2.5 mi |
Zeltmann | Astoria, NY | 3.7 TWh | 2.4 mi |