Mount Sinai Beth Israel
First Avenue at 16th Street, New York, NY 10003Plant Summary Information
Mount Sinai Beth Israel is ranked #47 out of 78 distillate fuel oil power plants in New York in terms of total annual net electricity generation.
Mount Sinai Beth Israel is comprised of 8 generators and generated 1.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Mount Sinai Beth Israel |
---|---|
Utility Name | Mount Sinai Beth Israel |
Location | New York County, NY |
Initial Operation Date | January 1988 |
Last Update | Dec 2023 |
Annual Generation | 35.0 MWh |
Annual Consumption | 1.3 k MMBtu |
Ranked #11,603 out of 11,835 Power Plants Nationwide | |
Ranked #967 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #808 out of 832 New York Power Plants | |
Ranked #47 out of 78 New York Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Mount Sinai Beth Israel
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mount Sinai Beth Israel.
Monthly Net Generation for Mount Sinai Beth Israel
Mount Sinai Beth Israel Details
Summary Information | |
---|---|
Plant Name | Mount Sinai Beth Israel (61569) |
Plant Address | First Avenue at 16th Street, New York, NY 10003 |
Utility | Mount Sinai Beth Israel (61165) |
Latitude, Longitude | 40.73267, -73.9816 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | January 1988 |
Annual Generation | 35.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator EGEN1 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EGEN2 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EGEN4 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EGEN5 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EGEN7 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EGEN8 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EGEN9 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN10 Details Standby January 1988
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Mount Sinai Beth Israel Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#957 | State Center | State Center, IA | 53.0 MWh |
#958 | Bay View Backup Power Facility | Toledo, OH | 424.0 MWh |
#959 | Moose Lake | Moose Lake, MN | 48.0 MWh |
#960 | Bushnell | Bushnell, IL | 36.0 MWh |
#961 | Farmer City | Farmer City, IL | 36.0 MWh |
#962 | St. Mary's Hospital For Children | Bayside, NY | 36.0 MWh |
#963 | Fairfax | Fairfax, MN | 35.3 MWh |
#964 | Pratt 2 | Pratt, KS | 226.0 MWh |
#965 | Burwell | Burwell, NE | 35.0 MWh |
#966 | Johnson | Johnson, KS | 35.0 MWh |
#968 | Yankee Street | Centerville, OH | 4.7 GWh |
#969 | University of Arizona - Biosphere 2 | Oracle, AZ | 118.0 MWh |
#970 | IBM West | Rochester, MN | 34.0 MWh |
#971 | Albert Einstein College of Medicine | Bronx, NY | 34.0 MWh |
#972 | Alexandria | Alexandria, MN | 34.0 MWh |
#973 | Jackson Cntr Peaking | Jackson Center, OH | 34.0 MWh |
#974 | Albemarle Hospital Unit | Albemarle, NC | 33.0 MWh |
#975 | Wilber | Wilber, NE | 33.0 MWh |
#976 | Shawville | Shawville, PA | 1.8 TWh |
#977 | Unalaska Power Module | Unalaska, AK | 33.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mount Sinai Beth Israel.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
5601 Westside CDG | North Bergen, NJ | 2.3 GWh | 4.5 mi |
59th Street | New York, NY | 612.0 MWh | 2.7 mi |
74th Street | New York, NY | 176.0 MWh | 2.9 mi |
Brooklyn Hospital Center | Brooklyn, NY | 27.0 MWh | 2.9 mi |
Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.1 TWh | 2.3 mi |
East River | New York, NY | 2.9 TWh | 0.5 mi |
Goya Foods, Inc- Jersey City Solar | Jersey City, NJ | 3.5 GWh | 4.8 mi |
Hilton NY Co Gen Plant | New York City, NY | 5.3 GWh | 2.1 mi |
Mount Sinai Hospital | New York, NY | 263.0 MWh | 4.2 mi |
NewYork-Presbyterian Brooklyn Methodist Hospital | Brooklyn, NY | 65.0 MWh | 4.5 mi |
North 1st | Brooklyn, NY | 31.5 GWh | 1.3 mi |
NY - Presbyt. Hospital - 525 E 68TH St | New York, NY | 48.1 GWh | 2.6 mi |
NYC-HH-New Bellevue Hospital | New York, NY | 171.0 MWh | 0.6 mi |
NYP-Lower Manhattan Hospital | New York, NY | 19.0 MWh | 2 mi |
NYU LANGONE HEALTH | New York, NY | 42.9 GWh | 1.1 mi |
OBP Cogen | New York, NY | 25.4 GWh | 1.5 mi |
Peak Power 1 Cogen | New York, NY | 21.4 GWh | 1.4 mi |
Ravenswood | Long Island, NY | 2.9 TWh | 2.6 mi |
Vernon Boulevard | Long Island City, NY | 120.4 GWh | 2.2 mi |
Woodhull Hospital | Brooklyn, NY | 143.0 MWh | 2.8 mi |