Mount Signal Solar Farm II
304 Brockman Rd, Calexico, CA 92231Plant Summary Information
Mount Signal Solar Farm II is ranked #32 out of 807 solar farms in California in terms of total annual net electricity generation.
Mount Signal Solar Farm II generated 64.7 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Mount Signal Solar Farm II |
---|---|
Utility Name | MN8 Energy LLC |
Location | Imperial County, CA |
Initial Operation Date | January 2020 |
Last Update | Jan 2025 |
Annual Generation | 409.6 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,498 out of 11,979 Power Plants Nationwide | |
Ranked #104 out of 5,765 Solar Power Plants Nationwide | |
Ranked #105 out of 1,578 California Power Plants | |
Ranked #32 out of 807 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Imperial Valley Solar 2, LLC (2016 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of Mount Signal Solar Farm II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mount Signal Solar Farm II.
Monthly Net Generation for Mount Signal Solar Farm II
Mount Signal Solar Farm II Details
Summary Information | |
---|---|
Plant Name | Mount Signal Solar Farm II (61353) |
Plant Address | 304 Brockman Rd, Calexico, CA 92231 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 32.6685, -115.6292 |
Generation Dates on File | Oct 2019 to Jan 2025 |
Initial Operation Date | January 2020 |
Annual Generation | 409.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator IVS2 Details Operating January 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 153.5 MW |
Summer Capacity | 153.5 MW |
Winter Capacity | 153.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 199.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mount Signal Solar Farm II Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#94 | Twiggs Solar | Dry Branch, GA | 427.9 GWh |
#95 | Hickory Park Solar Hybrid | Camilla, GA | 423.8 GWh |
#96 | Horizon Solar | Pearsall, TX | 427.5 GWh |
#97 | Bernard Creek Solar | Hungerford, TX | 426.3 GWh |
#98 | Big Plain Solar, LLC | London, OH | 418.3 GWh |
#99 | Big Cypress Solar, LLC | Crawfordsville, AR | 418.1 GWh |
#100 | Sun Streams 3 | Arlington, AZ | 578.2 GWh |
#101 | Samson Solar Energy | Cunningham, TX | 414.7 GWh |
#102 | Sun Streams, LLC | Arlington, AZ | 411.1 GWh |
#103 | CED Crane Solar | Crane, TX | 411.1 GWh |
#105 | Tres Bahias | Port Lavaca, TX | 407.9 GWh |
#106 | Brazoria West | Damon, TX | 406.0 GWh |
#107 | Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh |
#108 | Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh |
#109 | Yellow Pine Solar | Enterprise, NV | 387.9 GWh |
#110 | Castle Gap Solar Hybrid | McCarney, TX | 398.0 GWh |
#111 | Riverstart Solar Park LLC | Modoc, IN | 398.5 GWh |
#112 | North Rosamond Solar LLC | Rosamond, CA | 396.8 GWh |
#113 | Chestnut | Lemoore, CA | 391.2 GWh |
#114 | Mustang Two | Lemoore, CA | 393.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mount Signal Solar Farm II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 328.6 GWh | 8.1 mi |
Centinela Solar Energy | Calexico, CA | 491.6 GWh | 1.7 mi |
Centinela State Prison | Sacramento, CA | 18.1 GWh | 14.1 mi |
Drew Solar LLC | Calexico, CA | 311.9 GWh | 2.5 mi |
Drop 5 | Calexico, CA | 9.2 GWh | 13.8 mi |
El Centro Hybrid | El Centro, CA | 1.0 TWh | 10.6 mi |
Heber Geothermal | Heber, CA | 250.1 GWh | 7.2 mi |
Heber Solar | Heber, CA | 25.5 GWh | 6 mi |
Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh | 1.7 mi |
Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh | 11.3 mi |
Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh | 2.4 mi |
IVC Solar | Imperial, CA | 3.7 GWh | 13.3 mi |
Mount Signal Solar Farm V | Calexico, CA | 602.2 GWh | 3.7 mi |
Second Imperial Geothermal | Heber, CA | 326.6 GWh | 6.3 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 12 mi |
SEPV Imperial Dixieland West | Imperial, CA | 7.0 GWh | 12.3 mi |
Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh | 10.5 mi |
USG 1 | El Centro, CA | 2.7 GWh | 15.8 mi |
Valencia 3 | Imperial, CA | 8.3 GWh | 15.9 mi |
Wistaria Ranch Solar | Calexico, CA | 292.4 GWh | 0.8 mi |