Mosinee Mill
100 Main St, Mosinee, WI 54455Plant Summary Information
Mosinee Mill is ranked #47 out of 216 power plants in Wisconsin in terms of total annual net electricity generation.
Mosinee Mill is comprised of 5 generators and generated 30.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Mosinee Mill |
---|---|
Utility Name | Ahlstrom-Munksjo NA Specialty Solutions, LLC |
Location | Marathon County, WI |
Initial Operation Date | July 1916 |
Last Update | Aug 2024 |
Annual Generation | 118.3 GWh |
Annual Consumption | 4.2 M MMBtu |
Ranked #2,980 out of 11,835 Power Plants Nationwide | |
Ranked #78 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #47 out of 216 Wisconsin Power Plants | |
Ranked #3 out of 4 Wisconsin Black Liquor Power Plants | |
Fuel Types | Black Liquor : 38.2% Bituminous Coal : 36.5% Water : 15.5% Residual Fuel Oil : 3.4% Natural Gas : 2.9% Wood/Wood Waste Solids : 2.6% Sludge Waste : 1.0% |
Previous Operator |
Expera Mosinee LLC (2013 to 2017) Ahlstrom-Munksjo NA Specialty Solutions, LLC (2018 to 2023) |
Map of Mosinee Mill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mosinee Mill.
Monthly Net Generation for Mosinee Mill
Mosinee Mill Details
Summary Information | |
---|---|
Plant Name | Mosinee Mill (50614) |
Plant Address | 100 Main St, Mosinee, WI 54455 |
Utility | Ahlstrom-Munksjo NA Specialty Solutions, LLC (13008) |
Latitude, Longitude | 44.7881, -89.6917 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | July 1916 |
Annual Generation | 118.3 GWh |
Fuel Types | Black Liquor : 38.2% Bituminous Coal : 36.5% Water : 15.5% Residual Fuel Oil : 3.4% Natural Gas : 2.9% Wood/Wood Waste Solids : 2.6% Sludge Waste : 1.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Paper Manufacturing (322) |
Sector | Industrial CHP (7) |
Water Source | Wisconsin River |
Ash Impoundment | No |
Transmission / Distribution Owner | Wisconsin Public Service Corp (20860) WI |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator HYD2 Details Operating July 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1916 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator HYD3 Details Operating July 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1916 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator HYD1 Details Operating August 1924
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1924 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 0.5 MW |
Planned Net Winter Capacity Uprate | 0.5 MW |
Planned Uprate | March 2024 |
Multiple Fuels | No |
Generator WEST Details Operating August 1951
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1951 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Wood/Wood Waste Solids / Sludge Waste / Residual Fuel Oil / Natural Gas |
Startup Source | Residual Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / BLQ / RFO / WDS / SLW / NG |
---|
Generator GEN1 Details Operating December 1976
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 13 MW |
Winter Capacity | 13 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1976 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Wood/Wood Waste Solids / Sludge Waste / Residual Fuel Oil / Natural Gas |
Startup Source | Residual Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / BLQ / NG / SLW / WDS / RFO |
---|
Mosinee Mill Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#65 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#66 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#67 | International Paper Riverdale Mill | Selma, AL | 462.7 GWh |
#68 | Brunswick Cellulose | Brunswick, GA | 377.9 GWh |
#69 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#70 | Johnsonburg Mill | Johnsonburg, PA | 137.2 GWh |
#71 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh |
#72 | Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh |
#73 | Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh |
#74 | IP Springfield Oregon | Springfield, OR | 91.2 GWh |
#75 | St Francisville Mill | St. Francisville, LA | 116.0 GWh |
#76 | Ticonderoga Mill | Ticonderoga, NY | 187.1 GWh |
#77 | Interstate Paper LLC Riceboro | Riceboro, GA | 103.9 GWh |
#79 | Georgia-Pacific Toledo Mill | Toledo, OR | 59.6 GWh |
#80 | Port Townsend Paper | Port Townsend, WA | 35.3 GWh |
#81 | Androscoggin Mill | Jay, ME | 69.3 GWh |
#82 | Packaging of America Tomahawk Mill | Tomahawk, WI | 112.9 GWh |
#83 | Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh |
#84 | Kapstone | Charleston, SC | 372.9 GWh |
#85 | Georgia-Pacific Big Island | Big Island, VA | 53.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mosinee Mill.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alexander | Merrill, WI | 19.0 GWh | 27.8 mi |
Biron | Biron, WI | 24.3 GWh | 25.1 mi |
Biron Mill | Wisconsin Rapids, WI | 185.5 GWh | 25.1 mi |
Domtar Paper Company Rothschild | Rothschild, WI | 3.1 GWh | 7.5 mi |
Du Bay | Eau Pleine, WI | 33.2 GWh | 8.8 mi |
Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh | 34.3 mi |
Grandfather Falls | Irma, WI | 76.4 GWh | 35.8 mi |
Marshfield Utilities Gas Plant | Marshfield, WI | 8.9 GWh | 24.2 mi |
Medford DPC Solar | Medford, WI | 3.1 GWh | 42.2 mi |
Merrill | Merrill, WI | 8.2 GWh | 27 mi |
Port Edwards Mill | Port Edwards, WI | 36.3 GWh | 32.4 mi |
Rothschild Biomass Cogen Facility | Rothschild, WI | 143.2 GWh | 7.5 mi |
Stevens Point | Stevens Point, WI | 24.1 GWh | 19.6 mi |
Stevens Point Mill | Stevens Point, WI | 13.6 GWh | 30.5 mi |
Wausau | Wausau, WI | 22.8 GWh | 12 mi |
Weston | Rothschild, WI | 4.0 TWh | 5.3 mi |
Weston RICE | Kronenwetter, WI | 48.9 GWh | 5.1 mi |
Whiting | Whiting, WI | 21.2 GWh | 21.4 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 41.3 GWh | 28 mi |
Wood County | Nekoosa, WI | 261.0 GWh | 36.2 mi |