Morgan Lancaster 1 is ranked #775 out of 801 solar farms in California in terms of total annual net electricity generation.

Morgan Lancaster 1 generated 193.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameMorgan Lancaster 1
Utility NameTerraform Arcadia
LocationLos Angeles County, CA
Initial Operation DateSeptember 2015
Last Update Dec 2023
Annual Generation 688.0 MWh
Annual Consumption 2.7 k MMBtu
Ranked #10,957 out of 11,866 Power Plants Nationwide
Ranked #5,502 out of 5,672 Solar Power Plants Nationwide
Ranked #1,524 out of 1,571 California Power Plants
Ranked #775 out of 801 California Solar Power Plants
Fuel Types Solar
Previous Operators BayWa r.e. Solar Projects LLC (2014 to 2015)
WGL Energy Systems, Inc (2016 to 2018)
Terraform Arcadia (2019 to 2023)

Map of Morgan Lancaster 1

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Morgan Lancaster 1.

Create Your Account Today

Monthly Net Generation for Morgan Lancaster 1

500500400400300300200200100100002016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Morgan Lancaster 1 Details

Summary Information
Plant NameMorgan Lancaster 1 (59942)
Plant Address2551 E Avenue L, Lancaster, CA 93535
UtilityTerraform Arcadia (63249)
Latitude, Longitude34.6608, -118.0836
Generation Dates on FileSep 2015 to Dec 2023
Initial Operation DateSeptember 2015
Annual Generation 688.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number15-958
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator ML1 Details Operating September 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.5 MW
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Dual Axis TrackingYes
DC Net Capacity1.8 MW
Crystalline SiliconYes
Other MaterialsNo
Net Metering AgreementYes
Net Metering DC Capacity1.8 MW
Virtual Net Metering AgreementNo

Morgan Lancaster 1 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5492Mt Pleasant Community CenterValhalla, NY710.0 MWh
#5493Bullitt Farm SolarMarcy, NY709.0 MWh
#5494NortonNorton, MA707.0 MWh
#5495Engelhard Solar LLCMonroe, NJ706.0 MWh
#5496Stenner Creek SolarSan Luis Obispo, CA700.0 MWh
#5497Arlington MicrogridArlington, WA697.0 MWh
#5498Hobart Solar, LLCHobart, IN695.0 MWh
#5499McAllister LandfillPortsmouth, RI693.0 MWh
#5500PPL Renewable Energy Merck SolarSummit, NJ691.0 MWh
#5501White Marsh MallBaltimore, MD689.0 MWh
#5503Solar Photovoltaic Project #06Ontario, CA687.4 MWh
#5504Hopewell Valley High School HybridPennington, NJ680.0 MWh
#5505Franklin Solar 2 LLC Community SolarSomerset, NJ674.0 MWh
#5506SV CSG Barrass Farms II LLMarion, IL672.0 MWh
#5507Brentwood SolarBrentwood, NY671.0 MWh
#5508Wild HorseEllensburg, WA620.8 GWh
#5509Sr Byhalia, LLCByhalia, MS670.0 MWh
#5510IMPA Middletown Solar ParkMiddletown, IN663.0 MWh
#5511Holly Spring MeadowsDistrict Heights, MD656.0 MWh
#5512Highland Park Borough SolarHighland Park, NJ649.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Morgan Lancaster 1.

Plant NamePlant LocationAnnual GenerationDistance
Arrache 4006Palmdale, CA2.4 GWh1.9 mi
Arrache 4013Palmdale, CA1.4 GWh1.9 mi
Arrache 8083Palmdale, CA3.2 GWh1.6 mi
Division 1Lancaster, CA2.7 GWh4.2 mi
Division 2Lancaster, CA1.2 GWh4.2 mi
Division 3Lancaster, CA1.5 GWh4.2 mi
Green Beanworks B PVLancaster, CA6.2 GWh5.7 mi
Green Beanworks D PVPalmdale, CA6.3 GWh0.4 mi
Kettering Solar 1Lancaster, CA1.6 GWh3.6 mi
Kettering Solar 2Lancaster, CA1.7 GWh3.6 mi
L-8 Solar ProjectPalmdale, CA2.7 GWh6.3 mi
Lancaster Baptist ChurchLancaster, CA957.0 MWh2.8 mi
Lancaster Solar 1Lancaster, CA1.7 GWh3.8 mi
Lancaster Solar 2Lancaster, CA2.6 GWh5.8 mi
MaLancaster, CA4.2 GWh2.7 mi
RutanPalmdale, CA2.6 GWh4.7 mi
SEPV SierraLancaster, CA14.5 GWh5.9 mi
Solar Oasis LLCPalmdale, CA51.3 GWh0.9 mi
US-TOPCO (Soccer Center)Lancaster, CA7.0 GWh0.1 mi
VinamLancaster, CA3.1 GWh1.4 mi