Morgan Energy Center
1410 Red Hat Road, Decatur, AL 35601Plant Summary Information
Morgan Energy Center is ranked #7 out of 73 power plants in Alabama in terms of total annual net electricity generation.
Morgan Energy Center is comprised of 4 generators and generated 1.2 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | Morgan Energy Center |
---|---|
Utility Name | Morgan Energy Center LLC |
Location | Morgan County, AL |
Initial Operation Date | June 2003 |
Last Update | Mar 2024 |
Annual Generation | 5.1 TWh |
Annual Consumption | 40.1 M MMBtu |
Ranked #229 out of 11,249 Power Plants Nationwide | |
Ranked #116 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #7 out of 73 Alabama Power Plants | |
Ranked #4 out of 35 Alabama Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Morgan Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Morgan Energy Center.
Monthly Net Generation for Morgan Energy Center
Morgan Energy Center Details
Summary Information | |
---|---|
Plant Name | Morgan Energy Center (55293) |
Plant Address | 1410 Red Hat Road Decatur, AL 35601 |
Utility | Morgan Energy Center LLC (29122) |
Latitude, Longitude | 34.6397, -87.0639 |
Generation Dates on File | Jan 2003 to Mar 2024 |
Initial Operation Date | June 2003 |
Annual Generation | 5.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 01-84-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Tennessee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) AL |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | AMERICAN MIDSTREAM ALA INTRASTATE |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG2 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC TVA |
Nameplate Capacity | 210 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 161 MW |
Winter Capacity | 181 MW |
Minimum Load | 64 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC TVA |
Nameplate Capacity | 210 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 161 MW |
Winter Capacity | 181 MW |
Minimum Load | 64 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | TVA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | TVA |
Nameplate Capacity | 270 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 266 MW |
Winter Capacity | 266 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CTG1 Details Operating January 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC TVA |
Nameplate Capacity | 210 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 161 MW |
Winter Capacity | 181 MW |
Minimum Load | 64 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2004 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Morgan Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#106 | Sithe Independence Station | Oswego, NY | 5.3 TWh |
#107 | Cricket Valley Energy | Dover, NY | 5.3 TWh |
#108 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.3 TWh |
#109 | Kendall County Generation Facility | Minooka, IL | 5.2 TWh |
#110 | Brandy Branch | Baldwin, FL | 5.2 TWh |
#111 | Bosque County Peaking | Laquna Park, TX | 5.2 TWh |
#112 | St. Charles Power Station (LA) | La Place, LA | 5.2 TWh |
#113 | Cane Run | Louisville, KY | 5.2 TWh |
#114 | Pasadena Cogeneration | Pasadena, TX | 5.2 TWh |
#115 | CPV Three Rivers Energy Center | Morris, IL | 5.1 TWh |
#117 | TVA Southaven Combined Cycle | Southaven, MS | 5.0 TWh |
#118 | Potomac Energy Center, LLC | Leesburg, VA | 5.0 TWh |
#119 | Ouachita | Sterlington, LA | 5.0 TWh |
#120 | CPV Valley Energy Center | Wawayanda, NY | 5.0 TWh |
#121 | Central Alabama Generating Station | Billingsley, AL | 5.0 TWh |
#122 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.9 TWh |
#123 | Keys Energy Center | Brandywine, MD | 4.9 TWh |
#124 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.9 TWh |
#125 | West Riverside Energy Center | Beloit, WI | 4.8 TWh |
#126 | Fox Energy Center | Wrightstown, WI | 4.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Morgan Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 96.0 MWh | 74.8 mi |
Browns Ferry | Decatur, AL | 32.8 TWh | 5.4 mi |
Colbert | Tuscumbia, AL | 15.5 GWh | 45.2 mi |
Cumblerland Land Holdings, LLC | Elkmont, AL | 33.8 GWh | 24.1 mi |
Decatur Energy Center | Decatur, AL | 2.5 TWh | 2.5 mi |
Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 14.2 GWh | 2.4 mi |
Elora Solar | Elora, TN | 378.7 GWh | 50.3 mi |
Guntersville | Guntersville, AL | 621.5 GWh | 41 mi |
James H Miller Jr | Quinton, AL | 17.5 TWh | 69.6 mi |
Lewis Smith Dam | Jasper, AL | 365.3 GWh | 48.4 mi |
Muscle Shoals | Cherokee, AL | 484.5 GWh | 48.6 mi |
Packaging Corp of America | Counce, TN | 434.7 GWh | 73.8 mi |
Pickwick Landing Dam | Pickwick Dam, TN | 1.3 TWh | 73.4 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 19.3 GWh | 25.8 mi |
River Bend Solar, LLC | Florence, AL | 166.9 GWh | 46.1 mi |
Sand Valley Power Station | Collinsville, AL | 32.5 GWh | 71.2 mi |
SR Bell Buckle | Shelbyville, TN | 19.9 GWh | 72.8 mi |
Tims Ford | Winchester, TN | 61.2 GWh | 58.8 mi |
Wheeler Dam | Town Creek, AL | 1.5 TWh | 21.4 mi |
Wilson Dam | Muscle Shoals, AL | 2.4 TWh | 33.7 mi |