Moose Lake
401 Douglas Ave., Moose Lake, MN 55767Plant Summary Information
Moose Lake is ranked #50 out of 76 distillate fuel oil power plants in Minnesota in terms of total annual net electricity generation.
Moose Lake is comprised of 5 generators and generated 10.6 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Moose Lake |
---|---|
Utility Name | Moose Lake Water & Light Comm |
Location | Carlton County, MN |
Initial Operation Date | November 1952 |
Last Update | Dec 2023 |
Annual Generation | 48.0 MWh |
Annual Consumption | 528 MMBtu |
Ranked #11,551 out of 11,835 Power Plants Nationwide | |
Ranked #959 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #712 out of 736 Minnesota Power Plants | |
Ranked #50 out of 76 Minnesota Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil : 75.5% Natural Gas : 24.5% |
Map of Moose Lake
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Moose Lake.
Monthly Net Generation for Moose Lake
Moose Lake Details
Summary Information | |
---|---|
Plant Name | Moose Lake (1996) |
Plant Address | 401 Douglas Ave., Moose Lake, MN 55767 |
Utility | Moose Lake Water & Light Comm (12897) |
Latitude, Longitude | 46.4541, -92.76056 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | November 1952 |
Annual Generation | 48.0 MWh |
Fuel Types | Distillate Fuel Oil : 75.5% Natural Gas : 24.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Moose Lake Water & Light Comm (12897) MN |
Grid Voltage | 69.00 kV / 5.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | MINNESOTA ENERGY RESOURCES |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Standby July 1973
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | July 1973 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating April 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 2.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating April 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 2.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating April 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 2.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8NG Details Operating January 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Moose Lake Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#949 | Sidney (OH) | Sidney, OH | 38.0 MWh |
#950 | Progress Drive Generation Station | Shelby, OH | 38.0 MWh |
#951 | Amherst College Co Gen | Amherst, MA | 5.2 GWh |
#952 | Wilton | Wilton, IA | 37.2 MWh |
#953 | Hill City | Hill City, KS | 37.0 MWh |
#954 | Butler Municipal Power Plant | Butler, MO | 37.0 MWh |
#955 | Red Cloud | Red Cloud, NE | 37.0 MWh |
#956 | Shelby South | Shelby, OH | 37.0 MWh |
#957 | State Center | State Center, IA | 53.0 MWh |
#958 | Bay View Backup Power Facility | Toledo, OH | 424.0 MWh |
#960 | Bushnell | Bushnell, IL | 36.0 MWh |
#961 | Farmer City | Farmer City, IL | 36.0 MWh |
#962 | St. Mary's Hospital For Children | Bayside, NY | 36.0 MWh |
#963 | Fairfax | Fairfax, MN | 35.3 MWh |
#964 | Pratt 2 | Pratt, KS | 226.0 MWh |
#965 | Burwell | Burwell, NE | 35.0 MWh |
#966 | Johnson | Johnson, KS | 35.0 MWh |
#967 | Mount Sinai Beth Israel | New York, NY | 35.0 MWh |
#968 | Yankee Street | Centerville, OH | 4.7 GWh |
#969 | University of Arizona - Biosphere 2 | Oracle, AZ | 118.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Moose Lake.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brainerd Airport | Brainerd, MN | 10.4 GWh | 65.9 mi |
Cambridge CT Hybrid | Cambridge, MN | 49.4 GWh | 62.7 mi |
Clam River Dam | Danbury, WI | 4.8 GWh | 36.6 mi |
Danbury Dam | Danbury, WI | 2.7 GWh | 36.4 mi |
Fond Du Lac | Duluth, MN | 48.1 GWh | 26.6 mi |
Grand Casino Hinckley Solar | Hinckley, MN | 5.8 GWh | 31.7 mi |
Jean Duluth Solar | Duluth, MN | 2.1 GWh | 44.4 mi |
Knife Falls | Cloquet, MN | 9.2 GWh | 24 mi |
M L Hibbard | Duluth, MN | 70.1 GWh | 34.8 mi |
MP CSG 1 LLC | Wrenshall, MN | 1.7 GWh | 21.1 mi |
North Branch (MN) | North Branch, MN | 257.0 MWh | 66 mi |
Rapids Energy Center | Grand Rapids, MN | 34.2 GWh | 65.2 mi |
Rock Lake CT | Pine City, MN | 235.0 MWh | 45.9 mi |
Sappi Cloquet Mill | Cloquet, MN | 468.8 GWh | 24.4 mi |
Scanlon | Scanlon, MN | 5.5 GWh | 23.9 mi |
SMMPA Methane Energy Facility | Mora, MN | 1.3 GWh | 50.6 mi |
Spooner Solar Array | Spooner, WI | 3.5 GWh | 56.7 mi |
Thomson | Carlton, MN | 258.7 GWh | 24.6 mi |
Trego | Hayward, WI | 7.3 GWh | 54.4 mi |
USS Itasca Clean Energy Solar LLC | Grand Rapids, MN | 3.8 GWh | 63.4 mi |