Montross Solar
110 Nelson Street, Montross, VA 22520Plant Summary Information
Montross Solar is ranked #46 out of 94 solar farms in Virginia in terms of total annual net electricity generation.
Montross Solar generated 5.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Montross Solar |
---|---|
Utility Name | Dominion Energy Inc. |
Location | Westmoreland County, VA |
Initial Operation Date | December 2018 |
Last Update | Dec 2023 |
Annual Generation | 34.6 GWh |
Annual Consumption | 123.7 k MMBtu |
Ranked #4,351 out of 11,835 Power Plants Nationwide | |
Ranked #936 out of 5,643 Solar Power Plants Nationwide | |
Ranked #99 out of 211 Virginia Power Plants | |
Ranked #46 out of 94 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Dominion Energy Inc (2020 to 2021) Dominion Energy Inc. (2022 to 2023) |
Map of Montross Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Montross Solar.
Monthly Net Generation for Montross Solar
Montross Solar Details
Summary Information | |
---|---|
Plant Name | Montross Solar (64093) |
Plant Address | 110 Nelson Street, Montross, VA 22520 |
Utility | Dominion Energy Inc. (5248) |
Latitude, Longitude | 38.077, -76.786 |
Generation Dates on File | Jan 2020 to Dec 2023 |
Initial Operation Date | December 2018 |
Annual Generation | 34.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator MOSO Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 28 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 28 MW |
Virtual Net Metering Agreement | No |
Montross Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#926 | AES Lawai Solar Hybrid | Lawai, HI | 34.7 GWh |
#927 | Ayrshire | Shelby, NC | 35.4 GWh |
#928 | Essex Solar Center | Dunnsville, VA | 35.2 GWh |
#929 | Alta Luna | Deming, NM | 35.2 GWh |
#930 | Alamosa Solar | Mosca, CO | 35.1 GWh |
#931 | EDF Ph1 Toms River | Tom's River, NJ | 34.8 GWh |
#932 | SR Hazlehurst | Hazlehurst, GA | 34.8 GWh |
#933 | Antelope Expansion 3A | Lancaster, CA | 34.7 GWh |
#934 | Corcoran Solar | Corcoran, CA | 34.7 GWh |
#935 | RE Old River One, LLC | Bakersfield, CA | 34.7 GWh |
#937 | Watlington Solar | Halifax, VA | 34.6 GWh |
#938 | Ben Moreell Solar Farm | Tinton Falls, NJ | 34.5 GWh |
#939 | Caden Energix Endless Caverns, LLC | New Market, VA | 34.4 GWh |
#940 | Pasquotank | Elizabeth City, NC | 34.4 GWh |
#941 | Sun City Project LLC | Avenal, CA | 34.3 GWh |
#942 | Estill Solar | Estill, SC | 34.3 GWh |
#943 | Demille Solar Farm | Lapeer, MI | 34.2 GWh |
#944 | RE Columbia Two, LLC | Mojave, CA | 34.2 GWh |
#945 | Sierra Solar Greenworks | Lancaster, CA | 33.9 GWh |
#946 | Cantua Solar Station | TBD, CA | 33.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Montross Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Calvert Cliffs Nuclear Power Plant | Lusby, MD | 14.8 TWh | 31 mi |
Chalk Point Power | Aquasco, MD | 1.2 TWh | 32.7 mi |
Chalk Point Steam | Aquasco, MD | 1.2 GWh | 32.7 mi |
CPV St Charles Energy Center | Waldorf, MD | 3.8 TWh | 34.4 mi |
Energix Hollyfield, LLC | Manquin, VA | 25.5 GWh | 35 mi |
Essex Solar Center | Dunnsville, VA | 35.2 GWh | 16.8 mi |
Gardy's Mill Solar | Kinsale, VA | 25.5 GWh | 10.9 mi |
Hemings Solar | Warsaw, VA | 6.9 GWh | 8.4 mi |
Herbert Farm Solar | Hughesville, MD | 7.6 GWh | 32.4 mi |
Hollyfield | Manquin, VA | 29.8 GWh | 35 mi |
King & Queen | Little Plymouth, VA | 53.8 GWh | 28.1 mi |
Mechanicsville Solar | Mechanicsville, VA | 53.1 GWh | 36.5 mi |
Morgantown Generating Plant | Newburg, MD | 624.0 MWh | 22.1 mi |
Northern Neck | Warsaw, VA | 1.5 GWh | 9.7 mi |
NRG Chalk Point CT | Aquasco, MD | 894.0 MWh | 32.7 mi |
Rappahannock Solar, LLC | White Stone, VA | 3.2 GWh | 36.4 mi |
Ripley | La Plata, MD | 54.0 GWh | 35.9 mi |
Rockfish Solar LLC | Waldorf, MD | 14.6 GWh | 35.9 mi |
Waste Management King George LFGTE | King George, VA | 80.9 GWh | 31.5 mi |
Westmoreland County Solar Project | WARSAW, VA | 47.2 GWh | 5.3 mi |