Montgomery Winsted CSG is ranked #135 out of 485 solar farms in Minnesota in terms of total annual net electricity generation.

Montgomery Winsted CSG generated 803.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameMontgomery Winsted CSG
Utility NameMinnesota Solar CSG 4, LLC
LocationMcLeod County, MN
Initial Operation DateNovember 2017
Last Update Dec 2023
Annual Generation 4.8 GWh
Annual Consumption 16.5 k MMBtu
Ranked #7,879 out of 11,979 Power Plants Nationwide
Ranked #2,953 out of 5,765 Solar Power Plants Nationwide
Ranked #293 out of 739 Minnesota Power Plants
Ranked #135 out of 485 Minnesota Solar Power Plants
Fuel Types Solar

Map of Montgomery Winsted CSG

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Montgomery Winsted CSG.

Create Your Account Today

Monthly Net Generation for Montgomery Winsted CSG

80080060060040040020020000201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Montgomery Winsted CSG Details

Summary Information
Plant NameMontgomery Winsted CSG (61456)
Plant Address23121 Babcock Avenue, Winsted, MN 55395
UtilityMinnesota Solar CSG 4, LLC (61076)
Latitude, Longitude44.9517, -94.0556
Generation Dates on FileNov 2017 to Dec 2023
Initial Operation DateNovember 2017
Annual Generation 4.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number16-616, 16-617, 16-618
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerNorthern States Power Co - Minnesota (13781) MN
Grid Voltage 13.80 kV
Energy StorageNo

Generator 41620 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Generator 41621 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Generator 41622 Details Operating November 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity1 MW

Montgomery Winsted CSG Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2943Granville Solar PV Power ProjectOxford, NC4.8 GWh
#2944Kenneth SolarWarrenton, NC4.8 GWh
#2945Kearsarge Bellingham PVBellingham, MA4.8 GWh
#2946National RaisinFowler, CA4.8 GWh
#2947Monroe County Sites A & BWebster, NY4.8 GWh
#2948RPUWD Scheuer Well Solar ProjectSan Bernardino, CA4.8 GWh
#2949Porter Way Community Solar GardenWaconia, MN4.8 GWh
#2950Hecate Energy Upshur Rural LLCOre City, TX4.8 GWh
#2951Hadley 3 Solar (North)Hadley, MA4.8 GWh
#2952Hadley 3 Solar (South)Hadley, MA4.8 GWh
#2954Greenfield Solar ParkGreenfield, IN4.7 GWh
#2955Jackson Legler Solar 1 LLCJackson Township, NJ4.7 GWh
#2956SulusSolar22Silverton, OR4.7 GWh
#2957North Palm Springs 1APalm Springs, CA4.7 GWh
#2958Susquehanna University SolarSelinsgrove, PA4.7 GWh
#2959Hickson Solar, LLCWallace, SC4.7 GWh
#2960Beloit Solar LLCBeloit, KS4.7 GWh
#2961Cortlandville I Solar CSGCortland, NY4.7 GWh
#2962New Auburn DPC SolarNew Auburn, WI4.7 GWh
#2963Armstrong SolarGlenwood, MN4.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Montgomery Winsted CSG.

Plant NamePlant LocationAnnual GenerationDistance
Andromeda Community SolarLester Prairie, MN8.3 GWh3.6 mi
Barone CSGWinstead, MN1.8 GWh1 mi
Cokato CSGCokato, MN8.0 GWh12.2 mi
Helen CSG 1 LLCPlato, MN2.3 GWh11.2 mi
Helen Solar CSGPlato, MN9.2 GWh11.2 mi
Honeysuckle Solar, LLCLester Prairie, MN2.0 GWh3.3 mi
Laurel Village (CSG)Cokato, MN1.8 GWh11 mi
Montrose SolarMontrose, MN6.9 GWh9.7 mi
MontSun Community SolarMontrose, MN8.2 GWh10.5 mi
Nautilus Winsted Solar (CSG)Winsted, MN5.5 GWh1.5 mi
Nesvold Watertown SolarWatertown, MN8.5 GWh11.1 mi
New Germany Community Solar GardenNew Germany, MN1.6 GWh4.2 mi
Novel Martin Solar One LLC (McLeod) CSGLester Prairie, MN1.8 GWh3.6 mi
Plato CSG1, LLCGlencoe, MN2.1 GWh11.2 mi
South GardenWinstead, MN1.2 GWh1.1 mi
St BonifaciusSt. Bonifacius, MN1.3 GWh11.9 mi
USS Dressen Family Solar LLCMayer, MN729.0 MWh11.2 mi
USS Lake Patterson Solar CSGCologne, MN2.2 GWh11.3 mi
USS Water Fowl Solar LLC CSGSilver Lake, MN875.0 MWh6 mi
WaveSun Community SolarWaverly, MN8.2 GWh8.4 mi