Montefieor Medical Center Moses Division
111 east 210th Street, Bronx, NY 10467Plant Summary Information
Montefieor Medical Center Moses Division is ranked #72 out of 116 natural gas power plants in New York in terms of total annual net electricity generation.
Montefieor Medical Center Moses Division is comprised of 15 generators and generated 6.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Montefieor Medical Center Moses Division |
---|---|
Utility Name | Montefiore Medical Center Moses Division |
Location | Bronx County, NY |
Initial Operation Date | January 1994 |
Last Update | Dec 2023 |
Annual Generation | 28.7 GWh |
Annual Consumption | 492.2 k MMBtu |
Ranked #4,612 out of 11,852 Power Plants Nationwide | |
Ranked #1,327 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #185 out of 832 New York Power Plants | |
Ranked #72 out of 116 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 88.6% Distillate Fuel Oil : 11.4% |
Map of Montefieor Medical Center Moses Division
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Montefieor Medical Center Moses Division.
Monthly Net Generation for Montefieor Medical Center Moses Division
Montefieor Medical Center Moses Division Details
Summary Information | |
---|---|
Plant Name | Montefieor Medical Center Moses Division (58507) |
Plant Address | 111 east 210th Street, Bronx, NY 10467 |
Utility | Montefiore Medical Center Moses Division (58487) |
Latitude, Longitude | 40.88139, -73.88028 |
Generation Dates on File | Jan 2013 to Dec 2023 |
Initial Operation Date | January 1994 |
Annual Generation | 28.7 GWh |
Fuel Types | Natural Gas : 88.6% Distillate Fuel Oil : 11.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | QF89-206-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial CHP (5) |
Water Source | City WaTER |
Ash Impoundment | |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
Natural Gas Storage | No |
Generator S0001 Details Operating January 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.2 MW |
Net Winter Capacity With Natural Gas | 1.2 MW |
Net Summer Capacity With Oil | 1.2 MW |
Net Winter Capacity With Oil | 1.2 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Generator S0002 Details Operating January 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.2 MW |
Net Winter Capacity With Natural Gas | 1.2 MW |
Net Summer Capacity With Oil | 1.2 MW |
Net Winter Capacity With Oil | 1.2 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Generator S0003 Details Operating January 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.2 MW |
Net Winter Capacity With Natural Gas | 1.2 MW |
Net Summer Capacity With Oil | 1.2 MW |
Net Winter Capacity With Oil | 1.2 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Generator EMG02 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG03 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG04 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG05 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG06 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG07 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG08 Details Standby January 1998
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 1998 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator ES006 Details Operating January 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 3.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2002 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 3.5 MW |
Net Winter Capacity With Natural Gas | 3.5 MW |
Net Summer Capacity With Oil | 3.5 MW |
Net Winter Capacity With Oil | 3.5 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Generator ES007 Details Operating January 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Minimum Load | 3.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2002 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 3.5 MW |
Net Winter Capacity With Natural Gas | 3.5 MW |
Net Summer Capacity With Oil | 3.5 MW |
Net Winter Capacity With Oil | 3.5 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Generator EMG01 Details Standby January 2007
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2007 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG09 Details Standby January 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2011 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator EMG10 Details Standby January 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | No |
First Operation Date | January 2011 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Montefieor Medical Center Moses Division Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1317 | Rapids Energy Center | Grand Rapids, MN | 34.2 GWh |
#1318 | Prairie State Generating Station | Marissa, IL | 12.8 TWh |
#1319 | Danbury Hospital Cogen Plant | Danbury, CT | 26.3 GWh |
#1320 | Indigo Energy Facility | North Palm Springs, CA | 26.2 GWh |
#1321 | SRI International Cogen Project | Menlo Park, CA | 26.1 GWh |
#1322 | Kettle Falls Generating Station | Kettle Falls, WA | 335.1 GWh |
#1323 | Cimarron River | Liberal, KS | 25.8 GWh |
#1324 | Midway Peaking LLC | Firebaugh, CA | 25.7 GWh |
#1325 | Harbor Cogen | Wilmington, CA | 25.6 GWh |
#1326 | Saint Agnes Medical Center | Fresno, CA | 25.5 GWh |
#1328 | Pine Street | Sebewaing, MI | 25.4 GWh |
#1329 | Opryland USA | Nashville, TN | 25.4 GWh |
#1330 | OBP Cogen | New York, NY | 25.4 GWh |
#1331 | Fairfield University CHP Plant | Fairfield, CT | 25.3 GWh |
#1332 | Illumina Way SD | San Diego, CA | 25.3 GWh |
#1333 | Elkins Generating Center | Elkins, AR | 25.2 GWh |
#1334 | Shakopee Energy Park | Shakopee, MN | 25.2 GWh |
#1335 | Central Michigan University | Mt. Pleasant, MI | 25.1 GWh |
#1336 | Univ of NC Chapel Hill Cogen Facility | Chapel Hill, NC | 45.6 GWh |
#1337 | Hutchinson Plant #2 | Hutchinson, MN | 25.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Montefieor Medical Center Moses Division.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Albert Einstein College of Medicine | Bronx, NY | 34.0 MWh | 2.7 mi |
Astoria Energy | New York, NY | 4.3 TWh | 6.9 mi |
Astoria Energy II | Astoria, NY | 4.1 TWh | 7 mi |
Astoria Gas Turbines | Astoria, NY | 33.5 GWh | 6.6 mi |
Astoria Generating Station | Astoria, NY | 729.8 GWh | 6.7 mi |
Bronx Zoo | New York, NY | 20.4 GWh | 2.6 mi |
Fordham University | Bronx, NY | 48.0 MWh | 1.4 mi |
Fuel Cell 3245 Yates Avenue | Bronx, NY | 43.3 GWh | 1.4 mi |
Harlem River Yard | Bronx, NY | 92.5 GWh | 6 mi |
Hell Gate | Bronx, NY | 99.8 GWh | 5.9 mi |
Montefiore - Westchester Square | Bronx, NY | 3.0 MWh | 3.3 mi |
Montefiore Mount Vernon Hospital | Mount Vernon, NY | 55.0 MWh | 1.6 mi |
Mt.Sinai-St.Lukes Roosevelt Hosp. Center | New York, NY | 61.0 MWh | 3.4 mi |
New York Presbyterian Hospital-168th St | New York, NY | 126.0 MWh | 4.2 mi |
New York University Central Plant | New York, NY | 74.2 GWh | 6.7 mi |
Riverbay | New York, NY | 169.0 GWh | 3 mi |
St Johns Riverside Hospital | Yonkers, NY | 6.0 MWh | 6.1 mi |
St. Joseph Hospital | Yonkers, NY | 14.0 MWh | 3.4 mi |
The Allen Hospital | New York, NY | 12.0 MWh | 1.8 mi |
Zeltmann | Astoria, NY | 3.9 TWh | 6.5 mi |