Montague Solar
18727 Bottimiller Lane, Arlington, OR 97812Plant Summary Information
Montague Solar is ranked #29 out of 255 power plants in Oregon in terms of total annual net electricity generation.
Montague Solar generated 133.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Montague Solar |
---|---|
Utility Name | Avangrid Renewables LLC |
Location | Gilliam County, OR |
Initial Operation Date | April 2023 |
Last Update | Sep 2024 |
Annual Generation | 300.5 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,843 out of 11,852 Power Plants Nationwide | |
Ranked #164 out of 5,655 Solar Power Plants Nationwide | |
Ranked #29 out of 255 Oregon Power Plants | |
Ranked #1 out of 114 Oregon Solar Power Plants | |
Fuel Types | Solar |
Map of Montague Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Montague Solar.
Monthly Net Generation for Montague Solar
Montague Solar Details
Summary Information | |
---|---|
Plant Name | Montague Solar (63441) |
Plant Address | 18727 Bottimiller Lane, Arlington, OR 97812 |
Utility | Avangrid Renewables LLC (15399) |
Latitude, Longitude | 45.54, -120.18 |
Generation Dates on File | Apr 2023 to Sep 2024 |
Initial Operation Date | April 2023 |
Annual Generation | 300.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Avangrid Renewables LLC (AVRN) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator S1 Details Operating April 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 162 MW |
Summer Capacity | 162 MW |
Winter Capacity | 162 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Bifacial | Yes |
---|---|
DC Net Capacity | 210.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Montague Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#154 | Sun Streams 2 | Hassayampa, AZ | 311.6 GWh |
#155 | Blythe Solar IV, LLC | Blythe, CA | 302.6 GWh |
#156 | Quitman II Solar | Quitman, GA | 311.0 GWh |
#157 | Maverick Solar 7, LLC | Desert Center, CA | 310.3 GWh |
#158 | Madison Fields Solar Project, LLC | Irwin, OH | 310.1 GWh |
#159 | Drew Solar LLC | Calexico, CA | 307.2 GWh |
#160 | Midway Solar - TX | Fort Stockton, TX | 306.0 GWh |
#161 | Elora Solar | Elora, TN | 304.6 GWh |
#162 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 302.1 GWh |
#163 | SR DeSoto I, LLC | DeSoto, GA | 301.8 GWh |
#165 | Panoche Valley Solar Farm | Paicines, CA | 297.9 GWh |
#166 | Wistaria Ranch Solar | Calexico, CA | 297.0 GWh |
#167 | Concho Valley Solar, LLC | San Angelo, TX | 295.9 GWh |
#168 | ANSON Solar Center, LLC | Anson, TX | 294.3 GWh |
#169 | Hudson - High Desert Hybrid | Victorville, CA | 286.2 GWh |
#170 | Sky Ranch Solar | Belen, NM | 286.3 GWh |
#171 | Harry Allen Solar Energy LLC | Apex, NV | 291.7 GWh |
#172 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#173 | Edwards Sanborn E4 | Mojave, CA | 284.7 GWh |
#174 | Arlington Energy Center III | Blythe, CA | 266.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Montague Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 12.3 mi |
Condon Windpower LLC | Condon, OR | 65.5 GWh | 18.8 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 20.5 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh | 19.1 mi |
Horseshoe Bend Wind LLC | Arlington, OR | 579.6 GWh | 8.9 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 18 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 20.1 mi |
Klondike Windpower III | Wasco, OR | 692.4 GWh | 16 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 7.9 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 8.6 mi |
Montague Wind Power Facility LLC | Arlington, OR | 491.2 GWh | 5.4 mi |
North Hurlburt Wind LLC | Arlington, OR | 577.6 GWh | 14 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 12.2 mi |
South Hurlburt Wind LLC | Arlington, OR | 579.2 GWh | 12.5 mi |
Star Point Wind Project LLC | Wasco, OR | 194.0 GWh | 14.7 mi |
Threemile Canyon | Boardman, OR | 19.5 GWh | 15 mi |
Threemile Digester | Boardman, OR | 37.6 GWh | 17.9 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 79.7 GWh | 6.1 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 11.5 mi |
Willow Creek Energy Center | Lone, OR | 140.0 GWh | 12 mi |