Mojave Solar Project

42134 Harper Lake Road, Hinkley, CA 92347

Plant Summary Information

Mojave Solar Project is ranked #37 out of 5,778 solar farms nationwide in terms of total annual net electricity generation.

Mojave Solar Project generated 50.0 GWh during the 3-month period between November 2024 to February 2025.

Plant NameMojave Solar Project
Utility NameMojave Solar LLC
LocationSan Bernardino County, CA
Initial Operation DateDecember 2014
Last Update Feb 2025
Annual Generation 626.2 GWh
Annual Consumption 6.7 M MMBtu
Ranked #1,071 out of 11,993 Power Plants Nationwide
Ranked #37 out of 5,778 Solar Power Plants Nationwide
Ranked #55 out of 1,579 California Power Plants
Ranked #12 out of 808 California Solar Power Plants
Fuel Types Solar

Map of Mojave Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mojave Solar Project.

Create Your Account Today

Monthly Net Generation for Mojave Solar Project

Mojave Solar Project Details

Summary Information
Plant NameMojave Solar Project (57331)
Plant Address42134 Harper Lake Road, Hinkley, CA 92347
UtilityMojave Solar LLC (56660)
Latitude, Longitude35.01772, -117.33914
Generation Dates on FileJan 2015 to Feb 2025
Initial Operation DateDecember 2014
Annual Generation 626.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceOn-Site Wells
Ash Impoundment No
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 220.00 kV
Energy StorageNo

Generator MSP1 Details Operating December 2014

TechnologySolar Thermal without Energy Storage
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity140 MW
Nameplate Power Factor0.85
Summer Capacity137.5 MW
Winter Capacity100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2014
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Startup SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Subcritical TechnologyNo
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo
Solar Details
Single Axis TrackingYes
Parabolic TroughYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator MSP2 Details Operating December 2014

TechnologySolar Thermal without Energy Storage
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity140 MW
Nameplate Power Factor0.85
Summer Capacity137.5 MW
Winter Capacity100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2014
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Startup SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo
Solar Details
Single Axis TrackingYes
Parabolic TroughYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Mojave Solar Project Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#27Arlington Energy Center IIBlythe, CA640.7 GWh
#28Arica SolarDesert Center, CA641.8 GWh
#29Desert Sunlight 300, LLCDesert Center, CA659.4 GWh
#30Solar BlueLemoore, CA645.6 GWh
#31Genesis Solar Energy ProjectBlythe, CA645.4 GWh
#32Silver State Solar Power SouthPrimm Valley, NV642.6 GWh
#33IP Radian, LLCBrookesmith, TX641.8 GWh
#34Athos Solar ProjectDesert Center, CA630.9 GWh
#35Moapa Southern PaiuteMoapa, NV629.3 GWh
#36Arrow Canyon Solar HybridMoapa, NV613.0 GWh
#38Agua Caliente Solar ProjectDateland, AZ626.0 GWh
#39Copper Mountain Solar 3Boulder City, NV624.0 GWh
#40California Valley Solar RanchCalifornia Valley, CA623.8 GWh
#41Stateline SolarNipton, CA618.5 GWh
#42Mount Signal Solar Farm VCalexico, CA617.9 GWh
#43McCoy Solar Energy Project HybridBlythe, CA524.7 GWh
#44Oberon II Solar ProjectDesert Center, CA585.5 GWh
#45Titan Solar ProjectVan Horn, TX600.5 GWh
#46Bighorn Solar 1Pueblo, CO595.2 GWh
#47Blythe Solar 110, LLCBlythe, CA584.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Mojave Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Alamo SolarOro Grande, CA43.7 GWh23.2 mi
Baldy Mesa 2_Silver Peak HybridAdelanto, CA173.0 MWh29 mi
Baldy Mesa Solar & StorageAdelanto, CA58.1 GWh29 mi
Daggett 2Daggett, CA539.0 GWh29.5 mi
Daggett 3Daggett, CA887.4 GWh29.5 mi
Expressway Solar BVictorville, CA4.1 GWh30 mi
Expressway Solar C2Victorville, CA3.5 GWh29.9 mi
High Desert Power PlantVictorville, CA4.5 TWh29.2 mi
Hudson - High Desert HybridVictorville, CA285.7 GWh26.4 mi
Lockhart ESS, LLCHinkley, CA24.0 GWh1.4 mi
Lockhart Solar PV IIHinkley, CA193.4 GWh1.9 mi
Lockhart Solar PV, LLCHinkley, CA227.1 GWh1.3 mi
Madelyn Solar, LLCSilver Lake, CA2.5 GWh17.3 mi
Mitchell Solar, LLCSilver Lake, CA2.6 GWh17.5 mi
Resurgence SolarBoron, CA243.3 GWh11.7 mi
Resurgence Solar IIBoron, CA133.4 GWh11.7 mi
Rudy Solar, LLCSilver Lake, CA2.6 GWh17.4 mi
SEGS IXHinkley, CA112.0 GWh1.1 mi
SunEdison Walmart Apple Valley DCApple Valley, CA969.0 MWh30.1 mi
US BoraxBoron, CA267.4 GWh20.5 mi