Mohave Energy - Hybrid
2928 E Joy Ln, Fort Mohave, AZ 86426Plant Summary Information
Mohave Energy - Hybrid is ranked #44 out of 106 solar farms in Arizona in terms of total annual net electricity generation.
Mohave Energy - Hybrid generated 7.2 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Mohave Energy - Hybrid |
---|---|
Utility Name | Mohave Energy |
Location | Mohave County, AZ |
Initial Operation Date | September 2023 |
Last Update | Feb 2025 |
Annual Generation | 41.7 GWh |
Annual Consumption | 150.4 k MMBtu |
Ranked #4,193 out of 11,993 Power Plants Nationwide | |
Ranked #927 out of 5,778 Solar Power Plants Nationwide | |
Ranked #88 out of 159 Arizona Power Plants | |
Ranked #44 out of 106 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Mohave Energy - Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mohave Energy - Hybrid.
Monthly Net Generation for Mohave Energy - Hybrid
Mohave Energy - Hybrid Details
Summary Information | |
---|---|
Plant Name | Mohave Energy - Hybrid (67178) |
Plant Address | 2928 E Joy Ln, Fort Mohave, AZ 86426 |
Utility | Mohave Energy (66056) |
Latitude, Longitude | 34.99333, -114.54843 |
Generation Dates on File | Feb 2024 to Feb 2025 |
Initial Operation Date | September 2023 |
Annual Generation | 41.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Mohave Electric Cooperative, Inc. (21538) AZ |
Grid Voltage | 24.90 kV |
Energy Storage | Yes |
Generator MEBA Details Operating September 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 60 |
---|---|
Maximum Charge Rate | 15 MW |
Maximum Discharge Rate | 15 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1.2 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Frequency Regulation | Yes |
Co Located Renewable Firming | Yes |
Transmission And Distribution Deferral | Yes |
System Peak Shaving | Yes |
Load Management | Yes |
Excess Wind And Solar Generation | P |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 67178 |
Direct Support Gen Id | MEPV |
Support T D Asset | No |
Generator MEPV Details Operating September 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 17.6 MW |
Summer Capacity | 17.6 MW |
Winter Capacity | 17.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 23.3 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mohave Energy - Hybrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#917 | Peacock Energy Project | TX | 43.0 GWh |
#918 | Adams Nielson Solar | Lind, WA | 42.7 GWh |
#919 | Morris Ridge Solar | NY | 42.7 GWh |
#920 | Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh |
#921 | Searchlight Solar | Searchlight, NV | 42.6 GWh |
#922 | Speedway Solar NC, LLC | Midland, NC | 42.6 GWh |
#923 | Cameron Solar | Cameron, SC | 42.4 GWh |
#924 | Ruff Solar LLC | Ellenboro, NC | 42.0 GWh |
#925 | Redwood 4 Solar Farm | Edison, CA | 42.0 GWh |
#926 | Briel Solar Farm | Standston, VA | 41.8 GWh |
#928 | Decatur County Solar Project | Bainbridge, GA | 41.6 GWh |
#929 | Hickory Solar | Jerseyville, IL | 41.4 GWh |
#930 | Murphy Flat Solar | Murphy, ID | 41.4 GWh |
#931 | Temperance Solar, LLC | Erie, MI | 41.3 GWh |
#932 | DD Fayetteville Solar NC LLC | Fayetteville, NC | 41.3 GWh |
#933 | Calipatria Solar Farm | Calipatria, CA | 41.2 GWh |
#934 | Cotton Center Solar Hybrid | Gila Bend, AZ | 41.2 GWh |
#935 | Grassfield Solar | Chesapeake, VA | 41.0 GWh |
#936 | Summer Solar LLC | Lancaster, CA | 40.9 GWh |
#937 | Pavant Solar III | Filmore, UT | 40.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mohave Energy - Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Mountain Generating Station | Golden Valley, AZ | 94.9 GWh | 22.2 mi |
Black Mountain Solar LLC | Golden Valley, AZ | 20.3 GWh | 21.9 mi |
Boulder Solar Power, LLC | Boulder City, NV | 276.9 GWh | 34.2 mi |
CM48 | Boulder City, NV | 93.3 GWh | 59.9 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 59.6 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 59.6 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 691.3 GWh | 59.2 mi |
Davis Dam | Kingman, AZ | 908.9 GWh | 14.1 mi |
Gray Hawk Solar | Kingman, AZ | 142.1 GWh | 44.8 mi |
Griffith Energy LLC | Golden Valley, AZ | 3.8 TWh | 23.9 mi |
Headgate Rock | Parker, AZ | 32.3 GWh | 59.1 mi |
Jacobson 5 MW Solar | Kingman, AZ | 8.3 GWh | 37.2 mi |
Kingman 1 | Kingman, AZ | 19.0 GWh | 29.2 mi |
La Senita | Kingman, AZ | 931.0 MWh | 35.2 mi |
Mohave County Wind Farm | Willow Beach, AZ | 981.1 GWh | 55.2 mi |
Mohave Electric at Fort Mohave | Fort Mohave, AZ | 8.2 GWh | 0.8 mi |
Mohave Electric Cooperative at Joy Lane | Fort Mohave, AZ | 17.1 GWh | 0.8 mi |
Parker Dam | Parker, CA | 410.4 GWh | 53.5 mi |
Searchlight Solar | Searchlight, NV | 42.6 GWh | 40.1 mi |
South Point Energy Center | Mohave Valley, AZ | 2.6 TWh | 8.7 mi |