Model City Energy Facility
1447 Pletcher Road, Youngstown, NY 14174Plant Summary Information
Model City Energy Facility is ranked #10 out of 16 landfill gas power plants in New York in terms of total annual net electricity generation.
Model City Energy Facility is comprised of 7 generators and generated 7.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Model City Energy Facility |
---|---|
Utility Name | Model City Energy LLC |
Location | Niagara County, NY |
Initial Operation Date | June 2001 |
Last Update | Dec 2023 |
Annual Generation | 28.6 GWh |
Annual Consumption | 434.2 k MMBtu |
Ranked #4,615 out of 11,852 Power Plants Nationwide | |
Ranked #97 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #187 out of 832 New York Power Plants | |
Ranked #10 out of 16 New York Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Model City Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Model City Energy Facility.
Monthly Net Generation for Model City Energy Facility
Model City Energy Facility Details
Summary Information | |
---|---|
Plant Name | Model City Energy Facility (55757) |
Plant Address | 1447 Pletcher Road, Youngstown, NY 14174 |
Utility | Model City Energy LLC (12758) |
Latitude, Longitude | 43.2094, -78.9836 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 2001 |
Annual Generation | 28.6 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 01-122-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Town water |
Ash Impoundment | No |
Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GEN1 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating June 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Model City Energy Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#87 | Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh |
#88 | Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh |
#89 | Brevard | Cocoa, FL | 30.4 GWh |
#90 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh |
#91 | Stanton Energy Center | Orlando, FL | 4.0 TWh |
#92 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh |
#93 | Ameresco Delaware South | Georgetown, DE | 29.6 GWh |
#94 | Mahoning | New Springfield, OH | 28.9 GWh |
#95 | Lincoln Landfill | Lincoln, CA | 28.8 GWh |
#96 | Ameresco Keller Canyon | Bay Point, CA | 28.7 GWh |
#98 | Riverview Energy Systems | Riverview, MI | 28.3 GWh |
#99 | Bavarian LFGTE | Walton, KY | 27.9 GWh |
#100 | Sarasota County LFGTE Facility | Nokomis, FL | 27.8 GWh |
#101 | Ameresco Dallas LLC | Dallas, TX | 27.8 GWh |
#102 | Riverbend Landfill | McMinnville, OR | 27.7 GWh |
#103 | Richmond Energy | Henrico, VA | 27.3 GWh |
#104 | Lennon Generating | Lennon, MI | 27.3 GWh |
#105 | Brown County LFGTE Power Station | Georgetown, OH | 27.0 GWh |
#106 | Liberty I & II LFGTE | Monticello, IN | 26.7 GWh |
#107 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Model City Energy Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Tonawanda Solar LLC | Tonawanda, NY | 2.9 GWh | 15.2 mi |
Amherst Community Solar | Amherst, NY | 6.0 GWh | 16.3 mi |
Bizer Creek | Getzville, NY | 1.7 GWh | 17.3 mi |
Buffalo NY GigaFactory | Buffalo, NY | 2.6 GWh | 25.2 mi |
Corning Riverview (CSG) | Tonawanda, NY | 7.5 GWh | 14.8 mi |
Covanta Niagara I, LLC | Niagara Falls, NY | 183.6 GWh | 8.7 mi |
Fortistar North Tonawanda | North Tonawanda, NY | 49.3 GWh | 12.9 mi |
Hydraulic Race | Lockport, NY | 8.1 GWh | 14.9 mi |
Indeck Yerkes Energy Center | Tonawanda, NY | 30.8 GWh | 17.1 mi |
Lockport Energy Associates LP | Lockport, NY | 96.0 GWh | 12.5 mi |
LR Wheatfield Solar 1 | Wheatfield, NY | 8.3 GWh | 7 mi |
Millersport GM 1 | Amherst, NY | 6.4 GWh | 17.9 mi |
Modern Innovative Energy LLC | Youngstown, NY | 33.7 GWh | 0 mi |
Moore Road Community Solar | Ransomville, NY | 5.6 GWh | 4.1 mi |
Niagara Depot Solar | Niagara Falls, NY | 2.4 GWh | 6.4 mi |
NY Lancaster Gunnville Rd Site 1 Solar CSG | Lancaster, NY | 451.0 MWh | 25.6 mi |
Pendleton Solar 1 | Lockport, NY | 7.1 GWh | 13.9 mi |
Ransomville Solar 1, LLC | Ransomville, NY | 6.1 GWh | 1.8 mi |
Robert Moses Niagara | Lewiston, NY | 15.8 TWh | 5.4 mi |
Williams Rd | Ransomville, NY | 5.9 GWh | 2.1 mi |